essee Base 1-Way / 2-Way Charging User Guide
- June 9, 2024
- essee
Table of Contents
essee Base 1-Way / 2-Way Charging
Easee Base
- Easee Base is a modular charging station for assembly of up to four Easee charging robots.
- With Easee Base you can choose between several
- Choose configurations: 1-way setup, where only a loading robot is installed, 2-way setup with two loading robots and 4-way setup with up to 4 installed loading robots.
- With four expansion stages in just one design they share many common parts. Only a few
- Additional parts are added for each individual expansion stage specifically needed.
Conventions
- This symbol indicates that the respective instructions only from one authorized electrician may.
- This symbol indicates an immediate
- Danger to life and health of people due to the effects of electrical energy towards. Failure to comply with this
- Instructions can become serious
- Damage to health lead to life-threatening injuries
Technical specifications
General
- Dimensions (mm): H: 1500 x W: 160 x D: 80
- Weight: 6.1-7.7kg
- Material: aluminum and stainless steel
- Finish: powder coating
- Color: Black
- IP grade: IP44
- Insulation class: I (with Power Rail)
- Impact resistance: IK10
Characteristics
- Adapter plate for c/c 160mm base 45 degree rotation intervals (with the adapter plate)
- Screws and nuts included
- The adapter plate supports 22mm screws
Electrical connection
- Connection via Power Rail requires RCD protection of the circuit
- It is possible to connect several charging stations in series Recommendation of the cable sizes
- Maximum support of 16 mm2 flexible conductors with Ferrules and 25 mm2 solid conductors
- Cable length (between chargers and Power Rail): 135 cm
- Conductor material: CU or ALU
Safety instructions
Read the entire manual carefully through before installing and operating the product take. Observe the following instructions:
Installation Safety Instructions
-
The product may only be purchased from a installed and repaired by an authorized electrician or to be serviced. All valid local, regional and national regulations for electrical systems are complied with.
-
Danger to life due to high electrical voltage.
Never make any modifications to components or connection lines. -
The installation must not be near potentially explosive atmospheres or in
Areas, where there is a risk of flowing water, exists, take place. -
The product must be attached to a fixed location become.
-
The terminals in the back panel are included closed circuit live and must not in no case directly or with other objects than the plug-in electronics (Chargeberry) in contactto be brought.
-
Depending on the type of installation, there may be prior official approvals required
Safety instructions for operation
- Danger to life due to high electrical voltage. Never accept modifications to components or connecting cables.
- Have the prescribed maintenance, Installation, and necessary repair work always by a licensed electrician and in compliance with local regulations carry out.
- In case of fire, do not extinguish with water. Clean never use a pressure washer or the product flowing water.
- Do not immerse the product in water or in other liquids.
- If the column is in a public parking lot is placed, it is advisable to have an additional to put protection around it.
- Make sure that no children use the product play.
- Do not use in combination with the product Extension cords or unapproved adapters.
- Even if the loading robot for normal weather conditions, we recommend him from direct sunlight and extreme protection against weather conditions.
- Do not use the product near strong electromagnetic fields or in the immediate vicinity of radio transmitters
Common parts
1-Way/2-Way
Adapter plate
Fix the foundation of the column with 4 Allen screws on the adapter plate. The
Recommended torque is 30-40Nm.
INFO! It can be mounted in 45° increments to to get the right alignment
1-Way Plate and cover
- Secure the mounting plate with 3 pan head screws and the cover with 3 pan head screws.
- NOTICE! Make sure the top end of the Column is sealed with a plastic cap.
1-Way Backplate
Pass the cable through the hole in the column and the back plate of the Easee
Charging Robot before using it 4 pan head screws
2-Way Plates
Fasten the mounting plates with each 3 pan head screws on the column (total 6
screws).
NOTICE! Make sure the top end of the Column is sealed with a plastic cap
2-Way backplates
Run the cables through each hole in the column and the back plates of the Easee charging robots before using them with 4 pan head screws (total 8 screws) attach.
Power Rail
Before connecting
Power Rail is a junction box that allows to connect several charging stations
in series. The connection via the Power Rail requires RCD protection of the
circuit.
Please note the grounding system of the charging station, which is carefully
described on the following pages.
WARNING! Power Rail is a product that installed by an authorized
electrician must become. A declaration of conformity must always be completed
by your to be presented to the installer.
WARNING! Turn on the power supply off before you start wiring. Be
extremely careful and obey the instructions carefully
Grounding plate
Before installing the Power Rail, make sure that the grounding plate is attached. The record is extreme important to ground the column for protection (PE).
- Make sure the top ground terminal screw is open, and then clamp that end of the plate from behind into the connector. The Grounding plate should be flat against the plastic case issue.
- Put the serrated washer on the bar in the column. She should be between the metal column and the Power Rail are placed.
- Slide the Power Rail in with the ground plate the column and lock the rail below.
- Fasten the grounding nut with the spring washer on the rod.
- NOTICE! To establish the earth connection (PE), must fasten the grounding nut and the top ground screw must be tightened (regardless of whether there is a cable in it or not).
Important! Don’t forget this step!
PowerRail connections
- The ground plate completely connects the entire track left with the metal column, so it is very important that this track exclusively for earth connections (PE) is used.
- We recommend using the two below Connection kits for the main power cables.
- A set of connectors is used to power up and the other used to turn off if you have one connect another charging station to the same cable would like. Cable size up to 25 mm² ALU and CU.
We recommend using the top two Connection kits for the charging cables. For a
single loading robot will only one set Connectors used and for two loading
robots both connection kits used. cable size up to 6mm².
PowerRail wiring
- Strip the individual cables 12 mm wide. If the cable has flexible conductors, it is recommended Use ferrules on stranded wires. Use the right tools for pressing.
- Tighten the screw terminal with a torque of 5 Nm.
- NOTICE! When using ALU conductors, add dielectric grease.
- NOTICE! When connecting multiple backplates in parallel each screw terminal serves as a coupling point for adjacent backplates. All backplates must be in connected in the same phase sequence. If it is more convenient to use external junction boxes or Flat cables are used.
- NOTICE! It is recommended that the default Color codes to be observed during installation. Depending on national regulations may vary the colors of the cables differ from the illustrations. The illustrations in this Instructions comply with the IEC 60446 standard.
- NOTICE! Make sure before turning on the Power supply that the cables are properly connected and are tightly dressed. Test this by going to pull each cable.
Side panel
After you connected all the cables to the Power Rail have, it’s time to do the
side panel with the 4 lens head screws to mount
Practical details
Guarantee
- The device is free of material defects and corresponds to the consumer protection laws and regulations
- Country where the product was purchased or in which the consumer lives. For all correctly installed Easee
- Hardware products are covered by our limited warranty from 3 years*.
- Some countries may have an extended one
Guarantee Base
For the installation of this charging station is normally requires a
mechanical base. The adapter plate is compatible with most c/c 160mm bases.
In some situations it is also possible to use the smaller one base of the
column directly without the adapter plate use, in this case with a footprint
of 80 x 80 center to center.
Screws
We recommend for all flat and pan head screws a torque of 7-9 Nm.
Returns and Complaints
- Regarding the return and complaint of the product contact your dealer or our customer support. customer service
- Here you can find the latest manuals download, find answers to frequently asked
- Questions and useful documents and videos for your Product: easee.support.
THIS DOCUMENT CONTAINS INFORMATION THAT IS SUBJECT TO CHANGE WITHOUT NOTICE.
The latest version of this publication can be downloaded at
http://easee.support
No part of this publication may be reproduced or transmitted in any form or by
any means, electronic or mechanical, including, but not limited to, copying,
recording, retrieving data, or computer networks without the written
permission of Easee AS.
Easee and all other Easee product names and slogans are trademarks or
registered trademarks of Easee AS.
Easee products can be protected by one or more patents.
All other products and services mentioned may be trademarks or service marks
of their respective owners.
Illustrations of the product and user interface are exemplary and may differ
from the actual appearance.
November 2022 – Version 3.02
© 2020 by Easee AS. All rights reserved.
Contact details Easee AS Grenseveien 19 4313 Sandnes, Norway Org. nr: 920
292 046
You can find additional contact details for your country at
easee.com.
Easee AS Grenseveien 19 4313 Sandnes, Norway
www.easee.com
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>