novotegra East-west Green Roof
Notes
The following instructions are generally valid for our mounting system
novotegra and are to be applied or interpreted accordingly regardless of the
respective roof and mounting system type.
Safety information
Mounting tasks may only be carried out by qualified and competent persons.
During the work protective clothing in accordance with the relevant national
regulations and guidelines must be worn.
Mounting must be carried out by at least two persons to ensure help in case of
an accident.
All relevant national and locally applicable health and safety regulations,
accident prevention regulations, standards, construction standards and
environmental protection regulations as well as all regulations of the
employers’ liability insurance associations must be complied with.
The national regulations for working at height / on the roof must be complied
with.
Electrical work must be carried out in compliance with the national and
locally applicable standards and guidelines and the safety rules for
electrical work.
Earthing / equipotential bonding of the mounting system must be carried out in
accordance with the national and locally applicable standards and guidelines.
Categorization into hazard classes
To alert the user of potential danger situations the hazard classes analogous
to ANSI Z 535 are used. The hazard class describes the risk if the safety
information is not observed.
- DANGER! describes an immediate danger. If it is not avoided, death or serious injury will result.
- WARNING! describes a potential danger. If it is not avoided, death or serious injury might result.
- CAUTION! describes a potential danger. If it is not avoided, light or minor injury might result.
- NOTE! describes a potentially harmful situation. If it is not avoided, the plant or objects in its vicinity might be damaged.
General information
After receipt the goods must be inspected for completeness using the accompanying delivery note. novotegra GmbH does not accept the costs, nor can we guarantee subsequent express deliveries if missing material is only noticed during mounting. Since our mounting systems are subject to continuous development, mounting processes or components may change. Therefore, please check the current status of the mounting instructions on our website prior to mounting. We are also happy to send you current versions upon request. The mounting system is suitable for the attachment of PV modules with standard market dimensions. Please find more detailed information about this in chapter 3. The usability of the mounting system for the respective project must be checked for each individual case on the basis of the roof cover/roof construction/facade present.
The roof cover/roof construction/facade must meet the requirements of the
mounting system with regard to load bearing capacity, support structure and
condition.
Requirements for the material of the roof construction/roof cover /facade:
Wooden components (rafters/ purlins) at least strength class C24: no fungal
decay or rottenness. OSB with material grade OSB 3.
Steel purlins for stock screw installation exclusively material grade S235.
Tensile strength Rm, min Trapezoidal sheets: steel 360 N/mm²; aluminium 195
N/mm².
Wall construction material: concrete, brick or sand-lime brick in solid or
hollow block design.
The load-bearing capacity of the roof/roof construction (rafters, purlins,
trapezoidal metal, concrete floors, number of adhesive points, folded seams,
etc.) or the facade (wall construction materials) must be checked by the user
or a check be commissioned.
Physical building aspects concerning insulation penetrations (e.g.
condensation) must be taken into account by the user.
Notes on mounting
The components of the novotegra mounting system are intended exclusively for
the attachment of PV modules. Dependent on the roof type of the building the
designated mounting system components must be used.
A condition for the intended use of the novotegra mounting system is the
mandatory compliance with the specifications in these instructions regarding
safety information and mounting.
In case of unintended use and non-compliance with the safety information and
mounting instructions and non-utilization of the corresponding mounting
components or use of third party components not belonging to the mounting
system any warranty and liability claims against the manufacturer are voided.
The user is liable for damage and resulting consequential damage to other
components, such as PV modules, or the building as well as personal injury.
The user must read the mounting instructions prior to mounting. Unresolved
issues must be clarified with the manufacturer prior to mounting. The mounting
sequence in these instructions must be adhered to.
It must be ensured that a copy of the mounting instructions is accessible in
the immediate vicinity of the work on site.
The mounting specifications (module load, attachment, clamping areas etc.) of
the module manufacturer must be observed and complied with.
Prior to mounting the mounting system must be statically calculated with the
loads to be assumed for the building project in accordance with the national
standards. Information relevant to mounting (e.g. roof hook distance, lengths
of bolts, overhang and protrusions or distance of base trough and required
ballast) must be determined by the static calculation using the design
software www.solar-planet.
The permissible roof inclination for using the mounting system according to
these installation instructions is 0 to 60 degrees for roof-parallel
installation on a pitched roof and 0 to 5 degrees for elevated installation on
a flat roof. Facade systems must be mounted parallel to the facade.
For roof-parallel installation with the clamping system, two module support
rails per module must be mounted symmetrically under the modules for equal
load transfer into the substructure. Alternatively, the roof-parallel
installation can also be installed with insertion rails.
The specified tightening torques must be adhered to and checked randomly on
site.
Notes on static calculations
The mounting system must generally be statically calculated for each
individual project using the design software Solar-Planit. Excluding façade
systems, the calculation for this will be carried out by the company novotegra
GmbH. The static calculation only determines the load bearing capacity of the
novotegra mounting system and also takes account of the attachment to the
building (rafters, purlins, trapezoidal metal, facade etc.). The load transfer
within the building is not considered (customer static calculations). The load
bearing capacity of the mounting system components is determined on basis of
the planned module layout and the underlying building information (project
data recording). Deviations from the planning on site may lead to different
results. The load assumptions (load and roof division) are country-specific in
accordance with the specifications of the Eurocode load standards. The
determination of the loads to be assumed for Switzerland is in accordance with
SIA 261. At pitched roof, the modules may not be fitted above the gable end,
ridge and eaves or the facade (increased wind load). At the ridge the modules
may be fitted up to max. a theoretical horizontal line with the ridge tile and
perfectly flush with the gable end. In the eaves area the modules may reach to
max. the end of the roof cover due to loads. In case of an exposed building
position (with wind load e.g. at the edge of a slope) or snow accumulation
(e.g. dormer or catchment grill or roof structures like domelights etc) the
specifications of the Eurocode load standards or SIA 261 (Switzerland) must be
taken into account by the user within his own responsibility. The design
software does not consider these cases. The static calculation of the mounting
system is based on the symmetrical placement of the modules on the mounting
rails at the longitudinal side of the modules (roof-parallel clamping systems)
or on the support components (elevation) for equal load transfer into the
substructure. For the insertion system a cross rail arrangement is expected
for equal load transfer. The results calculated with the design software, such
as distances of the fasteners (e.g. roof hooks, stock screws, saddle clamps
etc.), rail lengths and number of fasteners (e.g. direct attachment on the
trapezoidal metal), overhang (e.g. rail and roof hook protrusions) or
distances between the base troughs and number of fixing materials (e.g. rail
joint) and the other calculation notes must be considered and complied with.
novotegra has been tested and certified by TÜV Rheinland:
Maintenance of the mounting system
The mounting system must be checked for stability and operation at regular
intervals during the system maintenance. Besides the visual inspection of the
components, we recommend random connection checks.
The installation should be checked regularly for shady areas due to vegetation
growth.
Removal is possible in reverse order in the work steps mentioned below. The
maintenance work must be carried out by a specialist company with proven
experience in electrical systems and work on mounting systems.
novotegra for green roof
The contents of this installation manual describe the installation of the
substructure on roofs with sheet or bitumen waterproofing, with or without
gravel respectively substratum.
On flat roofs without parapets, the modules must be mounted at a distance of
at least 1.50 m to the edge of the roof. On flat roofs with parapets, a
minimum distance of at least 0.50 m must be maintained between the module edge
and the inner edge of the parapet, or rather, the distance to the edge must be
taken into account after the individual calculation in the planning software
to ensure that the general conditions of the wind tunnel tests can be
maintained.
Depending on the roof seal material, separation and/or protection membranes
may need to be added between the roof seal and the substructure. This must be
agreed upon directly between the company installing the PV system, the
building owner and the specialist roof sealing company.
The substructure is installed without puncturing the roof. The photovoltaic
system is secured against wind suction with ballasting (substrate or suitable
stones) on the basis of the results of the wind tunnel tests for the system.
The required substrate or ballast height must determined specifically for each
project with the planning software. The ballasting applies to the planned
installation; deviations from the plan by the installer may lead to different
results.
General conditions to be observed in accordance with the wind tunnel test
results:
- Roof incline 0 – 5 degrees
- Flat roofs with and without parapet
- Distance from system to roof edge (without parapet) = 1.50 m
- Distance from system to parapet (inside edge) = min. 0.50 m
- Module width = max. 1,34 m
- Module length = max. 1,85 m
- Angle of installation (fixed) = 10°
- Distance between rows = see planning software Solar-Planit
The mounting system is designed for loads up to 2.4 kN/m² (2,400 Pa). The module is clamped (clamping area 11 x 52mm) along the long side. Any potentially existing drainage openings on the module frames must not be obstructed; the same applies to the formations on the supporting components designed for this purpose.
System components, tools and equipment
What is required for mounting
Mounting system components – optional
Optionally available installation system components, e.g. for improving the aesthetics of the system, cable management or grounding of the installation system.
Installing the mounting system
Prior to installation, the module array must be measured out on the roof and the position of the modules determined, taking into account any obstacles such as light domes or strips, fans or drains. The individual mounting steps for the east/west system variation are explained below with reference to the mounting variations (MV) for the different installation options or the system variations “south” and “butterfly”. This is then followed by the respective work sequence.
Substrate plate installation and support component mounting
-
Arrange substrate plates
Define starting point and measure up first whole substrate plate. Lay the following substrate plates (whole/half) according to planning documents
NOTE: The substrate plate overlaps must always been taken into account. The substrate plates must be laid on top of an existing and suitable protection fleece. -
Position and fasten module supports
Position module supports (high/low) on the substrate plates according to planning documents. Fasten each support at the positions specified with four 6 x 80 mm support mounting screws. The supports must be placed in the corners of the (whole) substrate plates. On these corners, the substrate plates (half) may overlap.
NOTE: The horizontal and vertical substrate plate line grid pattern must be adhered to. Always refer to the planning documents.
Rail mounting and fastening
-
Position green roof C-rail
Place rail on module supports. Fasten a 6.5 x 51 mm module support rail mounting screw as close to the middle of each module support as possible.
NOTICE: Do not over tighten the screws. Maximum rail overhang on the last module support 65 cm. Always heed the planning documents. Each rail part must lie on and be fastened to at least two module supports. After the module support and rail installation, the substrate is placed on top. The ballasting is achieved with the substrate; refer to the planning documents for the substrate weight per m². If necessary, additional stones must be put on top of the substrate plates as ballast. The mounting system will only stand securely once the required amount of ballast/substrate has been put in place.
WARNING: Observe the accident prevention regulations when sawing the rails. -
Connect green roof C-rail
Push the rail connector set (1) halfway into one of the rails to be connected (2) and fasten it there with one self-drilling screw on either side, at a distance of approx. 20 mm to the end of the rail. After that, push the other rail fully onto the rail connector set until both rail ends meet (3), then fasten as described above.
NOTICE: Do not over tighten the screws.
WARNING: Observe the accident prevention regulations when sawing the rails. -
C-rail green roof expansion joint
Push the rail connector set (1) halfway into one of the rails to be connected (2) and fasten it there with one self-drilling screw on either side, at a distance of approx. 20 mm to the end of the rail. Then push the other rail on top at a distance of 40mm – 50mm (3) and fasten it only to the following supports.
NOTICE: Do not over tighten the screws. Do not install the expansion joint underneath a module. Maximum rail length without expansion joint 17m. Always heed the planning documents.
WARNING: Observe the accident prevention regulations when sawing the rails.
Module installation
-
Module positioning and clamping
Position the photovoltaic modules upright onto the mounting rails, ensuring that they are straight. End clamps are used at the start and the end of a module row; middle clamps are used between the modules.
NOTICE: Panel gap at the ridge must be at least 50 mm. -
Middle and end clamp installation
At the clamping point, guide the middle and end clamps into the rail chamber from the top. Then turn the rail nut inside the rail and push the module clamps onto the module frame.
NOTICE: Contact latch installation see MV 3.2 Middle clamp fastening torque 10 Nm End clamp fastening torque 8 Nm -
Middle and end clamp space requirement
End clamps may be installed flush with the rail end. Push module completely onto the rail nut of the middle clamps.
NOTICE: Middle clamp fastening torque 10Nm End clamp fastening torque 8Nm
Mounting variations (MV)
-
MV1 Module position south-facing
Heed the planning documents and position and fasten the components accordingly. Further installation steps the same as variation east/west. -
MV2 Module position “butterfly” (east/west)
Heed the planning documents and position and fasten the components accordingly. Further installation steps the same as variation east/west. -
MV 3 Grounding
-
MV 3.1 Grounding connector installation
Grounding wire (as per national specifications): Disassemble grounding connector, remove clamp washer (1). Push the component through the green roof module support rail from below. Push the grounding wire (2) through the opening (suitable for 6-10mm) and fasten the component to the rail floor with the self-locking flange nut. Grounding cable (as per national specifications): Strip the grounding cable (e.g. stranded wire) and push it through the opening. Leave clamp washer in place (1). Clamp to rail floor with the self-locking flange nut.
NOTICE: Grounding wire fastening torque 20 Nm, grounding cable 10 Nm. The grounding connector is used to connect the mounting system to the potential equalisation. -
MV 3.2 Contact latch installation
Use the sliding clip to push the contact latch over the vertical bridges of the middle clamps up to the screw.
NOTICE: The middle clamp with the contact latch in place is installed as previously described in Chapter 5.3. -
MV 3.3 Strapping installation
Cut aluminium strapping to size. Position the strapping over the groove at the side of the module support rail. Position the mounting screw at the groove and fasten. NOTICE: The aluminium strapping is used to connect the individual module rows with each other for the potential equalisation.
WARNING: The applicable standards and guidelines, e.g. lightning protection standard, must be observed.
-
Warranty/product liability (exclusion)
In addition to the above-mentioned regulations and safety notices the
applicable regulations and rules of technology must be observed by the
installing specialist company.
The installer is responsible for the dimensioning of the mounting system. The
installer is responsible for the connection of the interfaces between the
mounting system and the building. This also includes the tightness of the
building envelope.
For flat roofs the roof insulation must be evaluated by the installer on site
within his own responsibility regarding the material of the sealing layer,
resistance, ageing, compatibility with other materials, overall condition of
the roof insulation, need for a separating layer between the roof insulation
and the mounting system. The required and necessary measures or precautions
for the protection of the roof insulation for the mounting of the substructure
of a PV system must be initiated by the installer with the aid of a specialist
tradesman where necessary. novotegra GmbH does not accept liability for faulty
or inadequate measures and precautions for the protection of the roof
insulation!
The installer must review the friction coefficient used in the calculation for
the verification of the slip safety of PV systems on flat roofs on site.
Friction coefficients determined on site can be taken into account by entering
them in the Solar-Planit planning tool. novotegra GmbH does not guarantee the
correctness of the assumed values and is not liable for damage due to the use
of incorrect values. The specifications of the module, cable and inverter
manufacturers must be observed. If these contradict the mounting instructions,
always consult the novotegra GmbH sales team before mounting the novotegra
mounting system or – in the case of components not supplied by novotegra GmbH
– the manufacturer concerned. During the preparation of the offers for
novotegra by our sales staff the local conditions are not always sufficiently
known, which is why changes to the offered quantities may result during
installation. These changes relate mainly to the number of fasteners for the
building envelope (for example roof hooks). In this case the additionally
required components must always be installed in accordance with the
dimensioning. novotegra GmbH is not liable for incorrect or incomplete data
collection sheets. Error-free and fully completed data collection sheets are
essential for correct dimensioning. The information in the mounting
instructions, the warranty terms and the information about the liability
exclusion must be noted.
novotegra GmbH
Eisenbahnstraße 150
72072 Tübingen | Deutschland