VIVIO MOUNT-VP02W White Projector Ceiling Mount Instruction Manual

June 3, 2024
VIVIO

White Projector Ceiling Mount
Instruction ManualVIVIO MOUNT VP02W White Projector Ceiling Mount -
fig11

MOUNT-VP02W White Projector Ceiling Mount

SKU: MOUNT-VP02W
Scan the QR code with your mobile device or follow the link for helpful videos and specifications related to this product.

https://vivo-us.com/products/mount-vp02w

WARNING!
If you do not understand these directions, or if you have any doubts about the safety of the installation, please call a qualified technician. Check carefully to make sure there are no missing or defective parts. Improper installation may cause damage or serious injury. Do not use this product for any purpose that is not explicitly specified in this manual. Do not exceed weight capacity. We cannot be liable for damage or injury caused by improper mounting, incorrect assembly or inappropriate use.

WARNING: CHOKING HAZARD
SMALL PARTS – NOT FOR CHILDREN UNDER 3 YEARS. ADULT SUPERVISION IS REQUIRED.

PACKAGE CONTENTS

NOTE: SOME HARDWARE INCLUDED MAY NOT BE USED

CAUTION!
DO NOT INSTALL INTO DRYWALL ALONE. VERIFY YOUR CEILING CONSTRUCTION. USE WOOD STUDS
TO MOUNT. We include mounting for brick and concrete. If unsure, please contact us at vivo-us.com, email at [email protected], or call us at 309-278-5303.
TOOLS NEEDED

DO NOT EXCEED WEIGHT CAPACITY.
Failure to do so may result in serious injury.

ASSEMBLY STEPS

STEP 1
OPTION A: Run cables through arm (A).VIVIO MOUNT VP02W White Projector
Ceiling Mount - fig4

OPTION B: If running cables through ceiling, pull cables through top plate of arm (A).VIVIO MOUNT VP02W White Projector Ceiling Mount -
fig5

STEP 2
OPTION A: Drywall Mounting
Use top plate of arm (A) to mark mounting holes on ceiling. Using a 3/16” drill bit, drill approximately 2.2” into ceiling stud. Put arm (A) in place and mount to the pre-drilled holes using bolts (W-A) and washers (W-C) as shown in diagram.VIVIO MOUNT VP02W White Projector Ceiling Mount -
fig6

STEP 2 (Continued)
OPTION B: Concrete/Brick Mounting
Use top plate of arm (A) to mark mounting holes on ceiling. Using a ⅜” drill bit, drill approximately 2.4” into ceiling. Use concrete anchors (W-B), bolts (W-A), and washers (W-C) to mount the arm (A) as shown in diagram. VIVIO
MOUNT VP02W White Projector Ceiling Mount - fig8

STEP 3
Mount bracket (B) to arm (A) using spacers (M-L), plates (M-M), bolts (M-I)and washers (M-J, M-K). Tighten using allen key (M-N).

STEP 4
Adjust arms of the bracket (C) to fit the mounting holes of your projector. Use bolts (M-A, M-B, M-C, M-D) and washers (M-E, M-F, M-G, M-H) depending on the size of mounting holes in your projector.

STEP 5
Hook the mount (B) to bolts in bottom of mount (A). Secure using bolts (M-I) and washers (M-J, M-K) as shown in diagram. Tighten using allen key (M-N).

STEP 6
Adjust height and tilt of mount using allen key (M-N).

** Love your new VIVO setup and want to share?
Tag us in your photo! @vivo_us
LAST UPDATED: 07/28/2021 REV1**

Open Monday – Friday 7:00am – 7:00pm CST,
our dedicated support team can offer immediate assistance with rapid response times. If any parts are received damaged or defective, please contact us. We are happy to replace parts to ensure you have a fully functioning product.

309-278-5303
AVG. RESOLUTION TIME (within office hrs): 5M 4S
www.vivo-us.com
Chat live with an agent!
AVG. RESOLUTION TIME (within office hrs): < 15 M
[email protected]
AVG. RESPONSE TIME (within office hrs): 1HR 8M
– 23% within < 15m
– 38% within < 30m
– 61% within < 1hr
– 83% within < 2hr
– 92% within < 3hr
FOR MORE VIVO PRODUCTS, CHECK OUT OUR WEBSITE AT: www.vivo-us.com

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

VIVIO User Manuals

Related Manuals