G21 GAH 1085 Steel Base Instructions
- June 3, 2024
- G21
Table of Contents
GAH 1085 Steel Base
Instructions
Steel BASE GAH 1085
GAH 1085 Steel Base
Thank you for purchasing our product.
Before use, please read these instructions carefully.
Základna GAH 1085
Name | Qty |
---|---|
V-A1 | 8 |
V-A3 | 8 |
V-A4 | 4 |
40 |
Installation
Kit before you begin / Site preparation
- Befor beginning construction, check local building codes regarding footings, location and other requirements.
- Follow all directions and dimensions carefully.
- Follow the step sequence carefully for correct results.
- Be sure all the parts it together properly before proceeding.
- SAFETY FIRST: Care must be taken when handling various pieces of your kit because some contain sharp edges. Wear work gloves, eye protection and long sleeves when assembling or performing any maintenance on your kit.
- BASIC TOOLS: Screwdriver, pliers, work gloves, tape measure, level and a spade or shovel.
- GROUND MUST BE LEVEL: Be sure loor frames lie lat on ground. To prepare construction, remove sod and other bumpiness. Level the high spots with lat shovel and tamp construction down.
- Separate contents of the carton by the part number while reviewing parts list. Check to be sure that you have all the necessary parts for your kit.
Images used in this manual are for illustrational purposes only and may differ from the actual product.
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>