Vision Metering VM-SMK-4S Sub Metering Kits Instructions

September 11, 2024
Vision Metering

Vision Metering VM-SMK-4S Sub Metering Kits

Specifications

  • Manufacturer: Vision Metering
  • Installation: Must be done by a Licensed Electrician
  • Accuracy: Better than 0.5% for meter and CT’s, Better than 0.2% for the meter
  • Communication: Available with or without communications
  • CT Type: Split core, clamp over Load Side conductors
  • Meter Types: Communicating and non-communicating meters

Product Usage Instructions

Installation Requirements

This product must be installed by a Licensed Electrician to ensure proper installation and safety.

Components Included in the Kit

The kit includes a 6-terminal round meter socket, 2200:5 current transformers, and a Vision 4S meter. Choose between meters with or without communications.

Installation Process

The installation typically takes around 1 1/2 hours. CTs are split core and should be clamped over the Load Side conductors.
Ensure proper connection as per the provided manual.

Reading the Meter

The meters can be read directly or via modem through an App on Android or Apple devices. Follow the instructions provided with the meter for accurate readings.

Maintenance

Regularly inspect the meter and CT’s for any signs of damage or wear. Keep the area around the meter clean and free from obstructions.

FAQ

  • Q: Can I install the sub-metering kit myself?
    A: No, this installation must be done by a Licensed Electrician to ensure safety and proper functionality.

  • Q: How do I read the meter?
    A: You can read the meter directly or via modem through an App on Android or Apple devices. Refer to the user manual for specific instructions on reading the meter.

  • Q: What is the accuracy of the meter and CT’s?
    A: The accuracy of the installation is better than 0.5% including the meter and CT’s, while the accuracy of the meter alone is better than 0.2%.

This installation must be done by a Licensed Electrician.

A complete kit for submetering your home, pool, outbuildings, offices, warehouses or any individual service where submetering is desired.

Vision Metering offers sub metering kits for all types of installations. This installation is on a 200 amp residential service. The installation consists of a 6 terminal round meter socket, 2-200:5 current transformers and a Vision 4S me-ter. You can order meters with or without com-munications. This installation took 1 1/2 hours. Meters are available to read directly or to be read via modem through an App on Android or Apple devices.
The accuracy of the installation is better than 0.5% including meter and CT’s. The accuracy of the meter is better than 0.2%

A singlephase installation kit includes the form 4S meter socket, two 200:5 CT’s and a Vision form 4S meter wither with or without communications.

Vision-Metering-VM-SMK-4S-Sub-Metering-Kits-FIG-1

Communicating and non-communicating meters

Sub-metering kits are available with and without communications. Dumb meters (non-communicating) can only be read via the display or through the optical port. Communicating meters have a Cat M1 modem meter which operates on T-Mobile and AT&T as roaming. Communicating meters are sold with 15 years of data loaded into them. These meters can be read through an App which is available on Apple and Android devices. Reading these meters with an App costs $3.00 per month per meter. Billing options are also available to bill customers where these meters are installed.

Kit Part Numbers

  • VM-SMK-4S Residential Form 2S/4S with round 4S meter socket and no communications
  • VM-SMK-45-MC Residential Form 2S/4S with round 4S meter socket, cell modem and 15 years of data
  • VM-SMK-5S Network Form 12S/5S, with prewired meter socket & test switch, no communications
  • VM-SMK-55-MC Network Form 12S/5S, with prewired meter socket & cell modem with 15 years of data
  • VM-SMK-9S Commercial Form 16S/9S, with prewired 13 terminal meter socket & test switch
  • VM-SMK-9S-MV Commercial Form 16S/9S, with13 terminal socket, test switch abd Cell Modem w/data
    Above kits include meter socket, 2 or 3 split core CT’s and meter. The first Form number is the Form of the service to be sub-metered. The second Form number is the type of meter to do the sub-metering.

Cat M1 Modem Meters Sold Separately and come with 15 years of wireless data

  • VM-2LUU1P Form 2S, 120—480 Volt, 3 Wire Class 200
  • VM-2LUU2P same as above with 200 amp disconnect switch
  • VM-2MUU1P Form 2S, 120—480 volts, 3 wire Class 320
  • VM-3NUU1P Form 3S, 120—480 volts, 2 Wire, Class 20
  • VM-4NUU1P Form 4S, 120—480 volts, 3 wire, Class 20
  • VM-9NUU1P Form 9S, 120—480 volts, 4 wire, Class 20
  • VM-MLUU1P Form 12S, 120—480 Volts, 3 Wire Network, Class 200
  • VM-MLUU2P Same as above with 200 amp disconnect switch
  • VM-ZLUU1P Form 16S, 120—480 Volts, 4 Wire, Class 20
  • VM-ZMUU1P Form 16S, 120—480 Volts, 4 Wire Class 320

Kits using 9S (Commercial & Industrial Meters) will come with 3 Split Core CT’s and a prewired 13 terminal meter socket. These can be used on trans- former rated or self contained metering installations. Network meters will require a Form 5S meter which has 8 terminals. This will also be a prewired meter socket.

Kits include 2 or 3 split core CT’s depending on the service. They are available in ratios from 200:5 to 800:5.

Vision Metering, LLC, 7 Ross Cannon St., York, SC 29745 803-628-0035 www.visionmetering.com

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals