Thdstatic Luxury Vinyl Flooring Installation Guide

August 20, 2024
thdstatic

Thdstatic Luxury Vinyl Flooring

Product Specifications

  • Product Type: Luxury Vinyl Flooring
  • Installation Method: Floating (with optional glue down in specific areas)
  • Recommended Tools: Spacers, Rubber Mallet, Ruler, Tape Measure, Utility Knife, Pencil, Underlayment

Product Usage Instructions

Preparation
Before starting the installation, please read all instructions carefully to avoid voiding the warranty.

Room Surface Calculation
Calculate the room surface area before installation and plan for an additional 10% of flooring for cutting waste.

Subfloor Inspection
Inspect the subfloor to ensure it is clean and level within 3/16 inches over a 10 ft span.

Installation Guidelines

  • Leave a 1/4-inch gap between walls and fixtures for floating floors.
  • Ensure proper spacing around pipes and pillars.
  • Decide on the installation direction, preferably parallel to the main light direction.
  • Inspect each plank before installation to avoid issues post-installation.

Special Considerations
Avoid installing over electrical radiant heating systems due to potential negative effects on the flooring. Follow specific instructions for radiant heating systems using water.

Recommended Installation Tools

  • Spacers
  • Rubber Mallet
  • Ruler
  • Tape Measure
  • Utility Knife
  • Pencil
  • Underlayment

Installation Process

  1. Clean the subfloor thoroughly before starting.
  2. Install the 6-mil poly underlayment.
  3. Begin laying the flooring in the left-hand corner, using spacers between the wall and the floor.
  4. Ensure each plank is aligned and locked together properly.

Frequently Asked Questions (FAQ)

  • Q: Can I install this flooring in areas with direct sunlight?
    A: Yes, in areas with sustained direct sunlight, it is recommended to glue down the planks in those spots using an approved premium Luxury Vinyl flooring adhesive.

  • Q: What should I do if I notice the planks are not aligned or locked properly during installation?
    A: If you notice alignment issues between planks, disassemble them and check for any debris obstructing the lock mechanism. Reassemble once both planks are at the same height and well-locked together.

Installation instructions

Before You Start/ Preparations
Please read all the instructions before you begin the installation.
Improper installation will void warranty.

Important notice
After installation, make sure to keep the room within a temperature range of 60°F to 80°F. Excessively high or low temperatures may cause this product to expand or contract and lead to visual defects of the floor that will not be warranted.
Installation in areas with sustained direct sunlight:
In cases where the flooring is in direct sunlight for much of the day (Sunrooms, etc.) it is recommended that the planks be glued down in those spots/areas. The planks are still clicked together as per the floating installation instructions, but an approved premium Luxury Vinyl flooring adhesive should be used in areas as needed. Be sure to follow the adhesive manufacturer’s instructions, including correct trowel size.
For the best result, make sure to always work from 2 to 3 cartons at a time mixing the planks during the installation.

  • Calculate the room surface prior to installation and plan an extra 10% of flooring for cutting waste.

  • If the boxes of flooring were exposed over 2 hours to extreme temperatures (under 50˚F or over 100˚F) within the 12 hours before the installation, acclimation is required. In this case, keep the boards in room temperature for at least 12 hours in unopened package before you start the installation. The room temperature must be maintained
    consistent between 60˚to 80˚F before and during installation.

  • For floor surfaces exceeding 4000 ft2 and or lengths exceeding 60 ft, use expansion moldings.

  • Inspect your subfloor before you begin. It must be clean and level to 3/16” within a 10 ft span.

  • Although this floor is waterproof, it is not aimed to be used as a moisture barrier. The subfloor must be dry (max 2.5% moisture content – CM method). This product is content – CM method). This product is also not to be installed in areas also not to be installed in areas that have a risk of flooding such as saunas or outdoor areas.

  • You must install a 6-mil poly underlayment before installing the flooring.

  • If this flooring is intended to be installed over an existing wooden floor, it is recommended to repair any loose boards or squeaks before you begin the installation.

  • With a floating floor you must always ensure you leave a 1/4” gap between walls and fixtures such as pipes and pillars, stairs, etc. These gaps will be covered with trim moldings after the floor is installed. Tip: When installing around pipes, drill the holes 3/4” larger than the diameter of the pipes.

  • Decide the installation direction. It is recommended to install the length direction of the planks parallel to the main light direction.

  • Measure the area to be installed:The board width of the last row shall not be less than 2”. If so, adjust the width of the first row to be installed. In narrow hallways, it is recommended to install the floor parallel to the length of the hall.

  • Inspect each individual plank one by one before installation. No claims on surface defects will be accepted after installation.

  • Due to the speed of sudden temperature changes, which has the potential to negatively affect this flooring, it is not recommended to install over any electrical radiant heating system.

  • Installation over electrical radiant heating systems will not be covered by the manufacturer’s warranty. Below instructions are for radiant heating systems using water.

  • Do not use this product over electric coil heater.
    potential to negatively affect this flooring, it is not recommended to install over any electrical radiant heating system. Installation over electrical radiant heating systems will not be covered by the manufacturer’s warranty. Below instructions are for radiant heating systems using water.

  • Do not use this product over electric coil heater. the system at maximum capacity to force any residual moisture from the cementitious topping of the radiant heat system. The maximum moisture content of the screed is 1.5% (CM method). Shut down the floor heating at least 48 hours prior to installation. Make sure that the temperature in the room is at least 60°F during installation. It is recommended that the radiant heat be applied in a gradual manner after installing the floor. Refer to the radiant heat system’s manufacturer recommendations for additional guidance.

Tools and supplies required

  • Spacers
  • Rubber Mallet
  • Ruler
  • Pencil
  • Tape Measure
  • Utility Knife
  • 6 Mil Poly Underlayment
  1. After thoroughly cleaning the subfloor, Install the 6-mil poly underlayment Poly then you should begin laying in the left-hand corner. Place the floorboard 1/4″ from the left wall. Use spacers between the wall and the floorboard.

  2. Second Plank, first row. Drop the plank and gently press down the end with a rubber mallet so it firmly locks into the previous plank until both are at the same height. Make sure both planks are perfectly aligned. NOTE: If you notice both planks aren’t at the same height or are not well locked together, please follow the disassembling instructions at the bottom of the page, disassemble and check if any debris stuck inside the lock is obstructing.

  3. WARNING : FAILURE TO PROPERLY LINE UP THE END JOINT AND ATTEMPTING TO FORCE IT IN WHILE OUT OF ALIGNMENT COULD RESULT IN PERMANENT DAMAGE TO THE END JOINT.

  4. At the end of the first row, leave an expansion gap of 1/4″ to the wall and measure the length of the last plank to fit.

  5. To cut the plank, use a simple utility knife and ruler, and with the top side facing up, cut heavily and several times on the same axis. The knife will not go through the surface but make a deep cut. You can then lift one half of the plank using your other hand to hold down the second placing it very close to the cut. The plank will split naturally.

  6. Start the second row with the leftover cut part of the last plank of the previous row. This small plank should measure at least 12”. Otherwise, use another plank that should be cut in two. The end joints of each adjoining row should not be closer than 8″ to each other.

  7. Click the long side of the plank into the previous row and place it tight to the short end of the previous plank with an angle of 30 degrees. Drop the plank and gently press down the end with a rubber mallet so it firmly locks into the previous plank until both are at the same height. Make sure both planks are perfectly aligned. NOTE: If you notice both planks aren’t at the same height or are not well locked together, please follow the disassembling instructions at the bottom of the page, disassemble and check if any debris stuck inside the lock is obstructing. Helpful Hint

  8. After finishing the installation of the row, use scrap pieces and a small hammer or rubber mallet to gently tap the planks into the click of the previous row to make sure they are tightly clicked together and make sure there is no gap between the long side of the planks installed. ANY GAPPING CAN COMPROMISE THE WHOLE INSTALLATION.

  9. After 2-3 rows. Adjust the distance to the front wall by leaving an expansion gap of 1/4”. Always ensure that the end joints are staggered at least 8”, both when in the same row as when from one row to the next one.

  10. To lay the last row: position a loose board exactly on top of the last row laid. Place another board on top, with the tongue side touching the wall. Draw a line along the
    line to obtain of the required width. Insert this cut board against the wall. The last row should be at least 2” wide. The spacers can then be removed.

  11. Holes for pipes: measure the diameter of the pipe and drill a hole that is 7/8” larger. Saw off a piece as shown
    Then lay the sawed-off piece in place.

  12. Door molding and skirting: lay a board (with the decorative side down) next to the door molding and as shown in the figure. Then slide the floorboard under molding.

Maintenance

  • Sweep or vacuum daily using soft bristle attachments.
  • Clean up spills and excessive liquids immediately.
  • Damp mop as needed and use cleaners recommended with no-wax or oil
  • Protect floor from constant direct sunlight. Close blinds or drapes during peak sunlight hours
  • Use proper floor protection devices such as felt protectors under furniture
  • Use a mat at entrance ways (please ensure the mat doesn’t have rubber backing).
  • Do not use abrasive cleaners, bleach or wax to maintain the floor.
  • Do not drag or slide heavy objects across the floor

Disassembling

Separate the whole row by lifting it up delicately at an angle. To separate the planks, leave them flat on the ground and slide them apart. If planks do not separate easy, you can slightly lift up the planks (5°) when sliding them apart.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

thdstatic User Manuals

Related Manuals