Haier 3U55S2PR1FA Multi-Head Outdoor, 5kW User Guide
- June 3, 2024
- Haier
Table of Contents
3U55S2PR1FA Multi-Head Outdoor, 5kW
MULTI-SPLIT AIR CONDITIONER INSTALLATION MANUAL
Original Instructions
English
3U55S2PR1FA 4U71S2PR1FA 4U80S2PR1FA
5U100S2PS1FA
Contents
Safety Precautions Move and scrap the air conditioning
Read Before Installation
Accessories
Procedure for Selecting the location
19
Installation drawings of indoor and
outdoor units
Precautions on Installation
Outdoor Unit Installation
Limitations on the installation
Refrigerant piping work
23
Pump Down Operation Wiring work
Dred function
Test running
Trouble shooting
30
5U125S2PN1FA
0150558811 This product must only be installed or serviced by qualified personnel. Please read this manual carefully before installation.This appliance is filled with R32. Keep this manual for future reference. Original instructions
parliament,herewith we inform the consumer about the disposal requirements of
the electrical and electronic products.
DISPOSAL REQUIREMENTS:
Your air conditioning product is marked with this symbol.This means that
electrical and electronic products shall not be mixed with unsorted household
waste.Do not try to dismantle the system yourself:the dismantling of the air
conditioning system,treatment of the refrigerant,of oil and of other part must
be done by a qualified installer in accordance with relevant local and
national legislation.Air conditioners must be treated at a specialized
treatment facility for reuse, recycling and recovery.By ensuring this product
is disposed of correctly,you will help to prevent potential negative
consequences for the environment and human health.Please contact the installer
or local authority for more information. Battery must be removed from the
remote controller and disposed of separately in accordance with relevant local
and national legislation.
IMPORTANT INFORMATION REGARDING THE REFRIGERANT USED
Contains fluorinated greenhouse gases
covered by the Kyoto Protocol
A
R32
kg B
kg C
kg D
This product contains fluorinated greenhouse gases covered by the Kyoto
Protocol.Do not vent into the atmosphere. Refrigerant type:R32 GWP*value:675
GWP=global warming potential Please fill in with indelible ink,
1 the factory refrigerant charge of the product 2 the additional refrigerant
amount charged in the field
and 1+2 the total refrigerant charge on the refrigerant charge label supplied
with the product. The filled out label must be adhered in the proximity of the
product charging port(e.g.onto the inside of the stop value cover). A contains
fluorinated greenhouse gases covered by the Kyoto Protocol B factory
refrigerant charge of the product:see unit name plate C additional refrigerant
amount charged in the field D total refrigerant charge E outdoor unit F
refrigerant cylinder and manifold for charging
WARNING
If the supply cord is damaged, it must be replaced by the manufacturer, its
service agent or similarly qualified persons in order to avoid a hazard. This
appliance is not intended for use by persons (including children) with reduced
physical, sensory or mental capabilities, or lack of experience and knowledge,
unless they have been given supervision or instruction concerning use of the
appliance by a person responsible for their safety. Children should be
supervised to ensure that they do not play with the appliance. This appliance
can be used by children aged from 8 years and above and persons with reduced
physical, sensory or mental capabilities or lack of experience and knowledge
if they have been given supervision or instruction concerning use of the
appliance in a safe way and understand the hazards involved. Children shall
not play with the appliance. Cleaning and user maintenance shall not be made
by children without supervision. The appliances are not intended to be
operated by means of an external timer or separate remotecontrol system. Keep
the appliance and its cord out of reach of children less than 8 years. The
A-weighted sound pressure level is below 70 dB. This appliance is intended to
be used by expert or trained users in shops, in light industry and on farms,
or for commercial use by lay persons. Disconnect the appliance from its power
source during maintenance service and when replacing parts. Air conditioner
working temperature: cooling -10~46 degree, heating -15~24 degree. The single
indoor unit will reduce in heating efficiency if the ambient temperature is
under 0 degree.
1
Read the precautions in this manual carefully before operating the unit.
This symbol shows that this appliance uses a flammable refrigerant. If the refrigerant is leaked and exposed to an external ignition source, there is a risk of fire.
Read the operator’s manual
Service indicator, read technical manual
After reading this handbook, hand it over to those who will be using the unit.
The user of the unit should keep this mamual at hand and make it available to
those who will be performing repairs or relocating the unit. Also, make it
available to the new user when the user changes hands.
WARNING
Ask your dealer or qualified personnel to carry out installation work.Do not
attempt to install the air conditioner yourself. Improper Installation may
result in water leakage, electric shocks, fire or explosion. All the cables
shall have got the European authentication certificate. During installation,
when the connecting cables break off, it must be assured that the grouding
wire is the last one to be broken off. If refrigerant gas leaks during
installation, ventilate the area immediately.oxic gas may be produced.if the
refrigerant comes into contact with fire,and explosion may be happen. Make
sure ground connection is correct and reliable.Do not earth the unit to a
utility pipe, lightning conductor or telephone earth lead. Imperfect earthing
may result in electric shocks. The breaker of the air conditioner should be
all-pole switch and explosion-proof. The distance between its two contacts
should not be no less than 3mm. Such means for disconnection must be
incorporated in the wiring. The air conditioning sockets should be placed 1m
above from the air conditioner, nor under the air conditioner. Be sure not to
use open flame, high static electrical or high temperature equipments
etc.nearby the air conditioner. Do not use means to accelerate the defrosting
process or to clean, other than those recommended by the manufacturer. The
appliance must be stored in a room without continuously operating ignition
sources, the radius of the storage area should be no less than 2.5 m (for
example:open flames, an operating gas appliance or an operating electric
heater). Do not pierce or burn. Be aware that refrigerants may not contain an
odour. The appliance must be installed, operated and stored in a room with a
floor area larger than the Minimum Room Area specified in the table on the
following pages,The room should be well ventilated. Comply with national gas
regulations. This appliance can be used by children aged 8 years and above and
persons with reduced physical, sensory or mental capabilities or lack of
experience and knowledge if they have been given superivision or instruction
concering use of the appliance in a safe way and understand the hazards
involved. Children shall not play with the appliance. Cleaning and user
maintenance shall not be made by children without supervision. The air
conditioner can not be discarded or scrapped Randomly If you need please
contact customer service personnel of Haier to scrap in order to obtain the
correct disposal methods. Reusable mechanical connectors and flared joints are
not allowed indoor.
CAUTION:
Do not install the air conditioner at any place where there is danger of
flammable gas leakage.In the event of a gas leakage, build-up of gas near the
air conditioner may cause a fire to break out. Tighten the flare nut according
to the specified method such as with a torque wrench.If the flare nut is too
tight, it may crack after prolonged use, causing refrigerant leakage. Take
adequate steps to prevent the outdoor unit being used as a shelter by small
animals.Small animals.making contact with electrical parts can cause
malfunctions, smoke or fire. Please instruct the customer to keep the area
around the unit clean The temperature of refrigerant circuit will be high,
please keep the inter-unit wire away from copper pipes that not thermally
insulated. Only qualified personnel can handle, fill, purge and dispose of the
refrigerant.
2
Safety Precautions
WARNING
The installation, maintenance, service and repair operations of this product
shall be carried out by professional personnel, who have been trainedand
certified by national training organizations that areaccredited to teach the
relevant national competency standards that may be set in legislation.
Improper installation may cause water leakage, electrical shock, fire, or
explosion.
Install the air conditioner according to the instructions given in this
manual.
Incomplete installation may cause water leakage, electrical shock, fire, or
explosion.
Be sure to use the supplied or specified installation parts.
Use of other parts may cause the unit to cometo lose, water leakage,
electrical shock, fire, or explosion.
Install the air conditioner on a solid base that can support the unit’s
weight.
An inadequate base or incomplete installation may cause injury in the event
the unit falls off the base.
Electrical work should be carried out in accordance with the installation
manual and the national electrical wiring rules or code of practice.
Insufficient capacity or incomplete electrical work may cause electrical
shock, fire, or explosion.
Be sure to use a dedicated power circuit. Never use a power supply shared by
another appliance. For wiring, use a cable long enough to cover the entire
distance with no connection. Do not use an extension cord. Do not put other
loads on the power supply, use a dedicated power circuit.
(Failure to do so may cause abnormal heat, electrical shock, fire, or
explosion.)
Use the specified types of wires for electrical connections between the indoor
and outdoor units.
Firmly clamp the interconnectiong wires so their terminals receive no external
stresses. Incomplete connections or clamping may cause terminal overheating,
fire, or explosion.
After connectiong interconnecting and supply wiring be sure to shape the
cables so that they do not put undue force on the electrical covers or panels.
Install covers over the wires. Incomplete cover installation may cause
terminal overheating, electrical shock, fire, or explosion.
If any refrigerant has leaked out during the installation work, ventilate the
room.
(The refrigerant produces a toxic gas if exposed to flames, may cause
explosion.)
After all installation is complete, check to make sure that no refrigerant is
leaking out.
(The refrigerant produces a toxic gas if exposed to flames, may cause
explosion.)
When installing or relocating the system, be sure to keep the refrigerant
circuit free from substancs other than the specified refrigerant(R32), such as
air.
(Any presence of air or other foreign substance in the refrigerant circuit
causes an abnormal pressure rise or rupture, resulting in injury.)
During pump-down, stop the compressor before removing the refrigerant piping.
If the compressor is still running and the stop valve is open during pump-
down, air will be sucked in when the compressor is run, causing abnormal
pressure in the freezer cycle which will lead to breakage and even injury.
Be sure to establish an earth. Do not earth the unit to a utility pipe,
arrester, or telephone earth.
Incomplete earth may cause electrical shock, fire, or explosion. A high surge
current from lightning or other sources may cause damage to the air
conditioner. The installation of pipe-work shall be kept to a minimum. Pipe-
work shall be protected from physical damage and shall not be installed in an
unventilated space, if that space is smaller than the Minimum Room Area
specified in the table on the following pages. Mechanical connections shall be
accessible for maintenance purposes. Information for handling, installation,
cleaning, servicing and disposal of refrigerant. Warning: Keep any required
ventilation openings clear of obstruction. Notice: Servicing shall be
performed only as recommended by this manual instruction.
Be sure to install an earth leakage breaker.
Failure to install an earth leakage breaker may result in electric shocks,
fire, or explosion.
3
CAUTION
Do not install the air conditioner in a place where there is danger of
exposure to inflammable gas leakage. If the gas leaks and builds up around the
unit, it may catch fire or explosion.
Establish drain piping according to the instructions of this manual.
Inadequate piping may cause flooding.
Tighten the flare nut according to the specified method such as with a torque
wrench. If the flare nut is tightened too hard, the falre nut may crack after
a long time and cause refrigerant leakage. Make sure to provide for adequate
measures in order to prevent that the outdoor unit be used as a shelter by
small animals. Small animals making contact with electrical parts can cause
malfunctions, smoke fire, or explosion. Please instruct the customer to keep
the area around the unit clean.
Loading and Unloading/Transporting Management/Storage Requirements
Loading and Unloading Requirements 1) The products shall be carefully handled
during loading and unloading. 2) Rude and barbarous handling such as kicking,
throwing, dropping, bumping, pulling and rolling is not allowed. 3) The
workers engaged in loading and unloading must be subject to necessary
trainings on the potential hazards caused by barbarous handling. 4) Dry powder
extinguishers or other suitable fire extinguishing apparatus within the period
of validity shall be equipped at the loading and unloading site. 5) The
untrained personnel cannot be engaged in loading and unloading of flammable
refrigerants air conditioner. 6) Before loading and unloading, anti-static
measures shall be taken, and phones cannot be answered during loading and
unloading. 7) Smoking and open fire are not allowed around the air
conditioner.
Transporting Management Requirements 1) The maximum transporting volume of
finished products shall be determined as per local regulations. 2) The
vehicles used for transporting shall be operated as per local laws and
regulations. 3) Dedicated after-sales vehicles shall be used for maintenance,
and exposed transporting of refrigerant cylinders and the products to be
maintained is not allowed. 4) The rain cover or similar shielding material of
transporting vehicles shall be provided with certain flame retardancy. 5)
Leakage warning device of flammable refrigerant shall be installed inside the
closed-type compartment. 6) Anti-static device shall be equipped inside the
compartment of transporting vehicles. 7) Dry powder extinguishers or other
suitable fire extinguishing apparatus within the period of validity shall be
equipped inside the driver’s cab. 8) Orange-white or red-white reflective
stripes shall be pasted on the sides and tail of the transporting vehicles, to
remind the vehicles behind of keeping distance. 9) The transporting vehicles
shall run at a constant speed, and heavy acceleration/deceleration shall be
avoided. 10) Combustibles or the static articles cannot be transported
simultaneously. 11) High-temperature area shall be avoided during
transporting, and necessary radiating measures shall be taken in case the
temperature inside the compartment is too high.
Storage Requirements 1) The storage package of equipment used shall be such
that no leakage of refrigerant will be caused due to mechanical damage of the
equipment inside. 2) The appliance must be stored in a room without
continuously operating ignition sources, the radius of the storage area should
be no less than 2.5 m (for example:open flames, an operating gas appliance or
an operating electric heater). 3) Do not pierce or burn. 4) The maximum
quantity of the equipment allowed to be stored together shall be determined as
per local regulations.
Installation Instructions
Installation Precautions
WARNING! The area of the room in which R32 refrigerant air conditioner is
installed cannot be less than the minimum area specified in the table below,
to avoid potential safety problems due to out-of-limit of refrigerant
concentration inside the room caused by leakage of refrigerant from
refrigeration system of the indoor unit. Once the horn mouth of connecting
lines is fastened, it may not be used again (the air tightness may be
affected). A whole connector wire shall be used for indoor/outdoor unit as
required in the operation specification of installation process and operation
instructions.
4
Type
LFL
h0
kg/m3
m
Minimum Room Area
Total Mass Charged/kg Minimum Room Area/m2
1.224 0.6
1.836 29
2.448 51
3.672 116
4.896 206
6.12 321
7.956 543
R32
0.306
1.0
1.8
10
19
42
3
6
13
74
116
196
23
36
60
2.2
2
4
9
15
24
40
Safety Awarenes 1.Procedures: operation shall be made as per controlled procedures to minimize the probability of risks. 2.Area: area shall be divided and isolated appropriately, and operation in an enclosed space shall be avoided. Before the refrigeration system is started or before working, ventilation or opening of the area shall be guaranteed. 3.Site inspection: the refrigerant shall be checked. 4.Fire control: the fire extinguisher shall be placed nearby, and fire source or high temperature is not allowed; the sign of “No smoking”shall be arranged.
Unpacking Inspection 1.Indoor unit: nitrogen is sealed during the delivery of indoor units (inside the evaporator), and the red sign at the top of the green plastic seal cap on the evaporator air pipes of the indoor unit shall be checked first after unpacking. In case the sign is raised, the nitrogen sealed still exists. Afterwards, the black plastic seal cap at the joint of evaporator liquid pipes of the indoor unit shall be pressed, to check whether nitrogen still exists. In case no nitrogen is sprayed out, the indoor unit is subject to leakage, and installation is not allowed. 2.Outdoor unit: the leak detection equipment shall be extended into the packing box of the outdoor unit, to check whether the refrigerant is leaking. If the refrigerant leakage is identified, installation is not allowed, and the outdoor unit shall be delivered to the maintenance department.
Inspection on Installation Environment
1.The room area checked cannot be less than the area specified on the warning sign of the indoor unit. 2.Inspection on the surrounding environment of place of installation: the outdoor unit of flammable refrigerants air conditioner cannot be installed inside an enclosed room reserved. 3.Power supply, switches or other high-temperature articles such as the fire source and oil heater shall be avoided below the indoor unit. 4.The power supply shall be provided with earthing wire and be reliably earthed. 5.While punching the wall with an electric drill, whether embedded water/electricity/gas pipelines are designed at the hole preset by the user shall be verified in advance. It is recommended that the through-wall holes reserved shall be used as much as possible
Safety Principles of Installation
1. Favorable ventilation shall be maintained at the place of installation (doors and windows are opened). 2. Open fire or high-temperature heat source (including welding, smoking and oven) higher than 548 is not allowed within the scope of flammable refrigerant. 3. Anti-static measures shall be taken, such as the wearing of cotton clothes and cotton gloves. 4. The place of installation shall be convenient for installation or maintenance. Barriers shall be avoided around the air inlet/outlet of the indoor/outdoor unit, and the electrical appliance, power switches, sockets, valuables and high- temperature products within the scope of both sidelines of the indoor unit shall be avoided, and cannot be adjacent to heat source and flammable and combustible environment. 5. In case of refrigerant leakage of the indoor unit during installation, the valve of the outdoor unit shall be closed immediately, and windows shall be opened, and all the personnel shall be evacuated. After the leakage of refrigerant is handled, the indoor environment shall be subject to concentration detection. Further handling is not allowed until the safety level is reached. 6. In case the product is damaged, it must be delivered to the maintenance point. Welding of refrigerant pipelines at the user’s site is not allowed.
Caution, risk of fire No Smoking
Cotton clothes 5
BEWARE Anti-static gloves ELECTROSTATICS Goggles
Electrical Safety Requirements 1.The surrounding conditions (ambient
temperature, direct sunlight and rainwater) shall be noticed during electrical
wiring, with effective protective measures being taken. 2.Copper wire cable in
line with local standards shall be used as the power line and connector wire.
3.Both the indoor unit and outdoor unit shall be reliably earthed. 4.Wiring
for the outdoor unit shall be made first and then the indoor unit. The air
conditioner can only be powered on after wiring and pipe connection. 5.The
dedicated branch circuit must be used, and leakage protector with sufficient
capacity must be installed. Qualification Requirements of Installer Relevant
qualification certificate must be obtained as per national laws and
regulations. Indoor Unit Installation 1.Fixing of wall panel and piping layout
In case of left/right water pipe connection for the indoor unit, or in case
the evaporator interface of the indoor unit and the horn mouth of the
connecting piping cannot be extended to the outdoor side for installation, the
connector pipes shall be connected to the evaporator piping interface of the
indoor unit in the process of horn mouth. 2. Piping layout During layout of
connecting pipes, drain hose and connector wires, the drain hose and
connecting wire shall be placed at the bottom and top respectively. The power
line cannot be twined with the connector wire. The drain pipes (especially
inside the room and machine) must be winded with thermal insulation materials.
3. Nitrogen charging for pressure maintaining and leak detection
After the evaporator of the indoor unit is connected to the connector pipe
(after welding), nitrogen more than 4.0MPa shall be charged inside the
evaporator and the piping connected to evaporator with a nitrogen
cylinder(adjusted by a reducing valve). Afterwards, the valve of the nitrogen
cylinder shall be closed, for leak detection with soapy water or leak
detecting solution. The pressure shall be maintained for more than 5 minutes,
and then whether the system pressure is reduced or not shall be observed. In
case the pressure is reduced, leakage can be identified. After the leak point
is handled, the steps above shall be repeated.
After the evaporator of the indoor unit is connected to connecting piping,
nitrogen shall be charged for pressure maintaining and leak detection.
Afterwards, the evaporator shall be connected to the two-way stop valve and
three-way stop valve of the outdoor unit. After the copper cap of the
connecting piping is fastened, nitrogen more than 4.0MPa shall be charged at
the access hole of the three-way stop valve with a charging hose. The valve of
the nitrogen cylinder shall be closed, for leak detection with soapy water or
leak detecting solution. The pressure shall be maintained for more than 5
minutes, and then whether the system pressure is reduced or not shall be
observed. In case the pressure is reduced, leakage can be identified. After
the leak point is handled, the steps above shall be repeated.
The next step (vacuumizing with a vacuum pump) can only be continued after the
installation steps (nitrogen charging for pressure maintaining and leak
detection normal) are completed.
Outdoor Unit Installation 1.Fixing and connection Note: a) Fire source shall
be avoided within 3m around the place of installation. b) The leak detection
equipment of refrigerant shall be placed at a low position in the outdoor, and
shall be opened.
6
- Fixing The support of the outdoor unit shall be fixed onto the wall surface, and then the outdoor unit shall be fixed onto the support horizontally. In case the outdoor unit is wall-mounted or roof-mounted, the support shall be firmly fixed, to avoid the damage of strong wind.
- Installation of connecting pipes The cone of the connecting pipes shall be
aligned with the conical surface of corresponding valve connector. The nut of
connecting pipes shall be installed at a proper position and then be tightened
with a spanner. Excessive tightening torque shall be avoided, or otherwise the
nut may be damaged.
Vacuumizing A digital vacuum gauge shall be connected for vacuumizing. The duration of vacuumizing shall be at least 15 minutes,
and the pressure of the vacuum gauge shall be below 60Pa.Afterwards, the vacuumizing equipment shall be closed, and whether the reading of the digital vacuum gauge is increased or not shall be observed after the pressure is maintained for 5 minutes. In case no leakage is identified, the two-way stop valve and three-way stop valve of the outdoor unit may be opened. Finally, the vacuumizing hose connected to the outdoor unit can be disassembled.
Leak Detection The joint of connecting pipes for the outdoor unit shall be subject to leak detection with soap bubble or dedicated leak
detection equipment.
Post-installation Inspection Items and Test Run Post-installation Inspection Items
Items to Be Checked Whether the installation is firm or not Whether the inspection on air leakage is completed Whether the unit is fully insulated Whether the drainage is smooth or not
Consequence of Improper Installation The unit may fall, vibrate or make a noise The refrigerating capacity (heating capacity) may be insufficient Condensation or drip may occur Condensation or drip may occur
Whether the power voltage is identical to that marked on the Failure may occur or the parts may be burned nameplate
Whether the circuit and pipeline are installed correctly
Failure may occur or the parts may be burned
Whether the unit is safely earthed Whether the type of wire is in line with relevant regulations
Electric leakage may occur Failure may occur or the parts may be burned
Whether barriers are identified at the air inlet/outlet of the The refrigerating capacity (heating capacity) may be
indoor/outdoor unit
insufficient
Whether the length amount charged are
of refrigerant recorded
pipes
and
the
refrigerant
The
refrigerant
amount
charged
cannot
be
confirmed
Test Run
1. Preparations (1) Check the power supply. (2) Check the equipment around,
whether there is any combustible source, fire source,or heat source. (3) Power
on is not allowed before all the installation operations are completed and
before the leak detection is proven qualified. (4) The control circuit shall
be connected correctly and all the wires shall be firmly connected. (5) The
two-way stop valve and three-way stop valve shall be opened. (6) All the
scattered articles (especially the metal filing and thread residue) shall be
removed from the unit body.
2. Methods (1) Switch on the power supply and press the “ON/OFF” on the
remote controller, after which the air conditioner will start operating. (2)
Press “Mode”to select refrigeration, heating and sweeping wind, and observe
whether the air conditioner is under normal operation.
7
Relocation Procedures
Please call the dealer or the appointed agency. Follow the following
procedures:
Inspection on system leakage prior to disassembly
Safety discharge of refrigerant
Disassembly
Inspection on operational state
Safety discharge of refrigerant
Disassembly
Refrigerant recovery by the system
Cleaning of the indoor unit and connecting pipes with inert gas
Disassembly
Installation as required in standards
Note: in case relocation is required, the joint of evaporator gas/liquid pipes
of the indoor unit shall be cut off with a cutting knife. Connection is only
allowed after re-flaring (the same to the outdoor unit).
Maintenance Instructions
Maintenance Precautions Precautions
For all the faults requiring welding the refrigeration pipelines or components
inside the refrigeration system of R32 refrigerant air conditioners,
maintenance at the user’s site is never allowed.
For the faults requiring radical disassembly and bending operation of the heat
exchanger, such as the replacement of the outdoor unit chassis and integral
disassembly of the condenser, inspection and maintenance at the user’s site
are never allowed.
For the faults requiring replacement of the compressor or parts & components
of refrigeration system, maintenance at the user’s site is not allowed.
For other faults not involved in the refrigerant container, internal
refrigeration pipelines and refrigeration elements, the maintenance at the
user’s site is allowed, including the cleaning and dredging of the
refrigeration system requiring no disassembly of refrigeration elements and no
welding.
In case replacement of gas/liquid pipes is required during maintenance, the
joint of evaporator gas/liquid pipes of the indoor unit shall be cut off with
a cutting knife. Connection is only allowed after re-flaring (the same to the
outdoor unit).
Qualification Requirements of Maintenance Personnel 1. All the operators or
the maintenance personnel involved in refrigerating circuits shall be provided
with the effective certificate issued by an industry-accepted assessment
institute, to ensure that they are qualified for safety disposal of
refrigerant as required in the assessment regulations. 2. The equipment can
only be maintained and repaired as per the method recommended by the
manufacturer. In case the assistance from personnel of other disciplines is
required, the assistance shall be supervised by the personnel with
qualification certificate involved in flammable refrigerant.
8
Inspection on Maintenance Environment Before operation, the refrigerant leaked
in the room is not allowed. The area of the room in which maintenance is made
shall be in line with this manual. Continuous ventilation shall be maintained
during maintenance. Open fire or high-temperature heat source higher than 548
degree which can easily give birth to open fire is not allowed inside the room
within the maintenance area. During maintenance, the phones and the
radioactive electronics of all the operators inside the room must be powered
off. One dry powder or carbon dioxide extinguisher shall be equipped inside
the maintenance area, and the extinguisher must be under available state.
Maintenance Site Requirements The maintenance site shall be provided with
favorable ventilation and must be flat. Arrangement of the maintenance site
inside the basement is not allowed. Welding zone and non-welding zone shall be
divided at the maintenance site, and shall be clearly marked. A certain safety
distance must be guaranteed between the two zones. Ventilators shall be
installed at the maintenance site, and exhaust fans, fans, ceiling fans, floor
fans and dedicated exhaust duct can be arranged, to meet the requirements of
ventilation volume and uniform exhaust, and to avoid accumulation of
refrigerant gas. Leak detection equipment for flammable refrigerant shall be
equipped, with relevant management system being established. Whether the leak
detection equipment is under available state shall be confirmed before
maintenance. Sufficient dedicated vacuum pumps of flammable refrigerant and
refrigerant charging equipment shall be equipped, with relevant management
system for maintenance equipment being established. It shall be guaranteed
that the maintenance equipment can only be used for vacuumizing and charging
of one type of flammable refrigerant, and mixed usage is not allowed. The
master power switch shall be arranged outside the maintenance site, with
protective (anti-explosive) device being equipped. Nitrogen cylinders,
acetylene cylinders and oxygen cylinders shall be placed separately. The
distance between the gas cylinders above and the working area involved in open
fire shall be at least 6m. The anti-backfire valve shall be installed for the
acetylene cylinders. The color of the acetylene cylinders and oxygen cylinders
installed shall meet the international requirements. The warning sign of ” No
Fire” ,”No Smoking”, or”Anti static”shall be arranged inside the maintenance
area. Fire control device suitable for electric appliance such as the dry
powder extinguisher or carbon dioxide extinguisher shall be equipped, and
shall always be under the available state. The ventilator and other electrical
equipment at the maintenance site shall be relatively fixed, with standardized
pipe routing. Temporary wires and sockets at the maintenance site are not
allowed.
Leak Detection Methods The environment in which the refrigerant leakage is
checked shall be free from potential ignition source. Leak detection with
halogen probes (or any other detector with open fire) shall be avoided. For
the system containing flammable refrigerant, leak detection may be realized
with electronic leak detection equipment. During leak detection, the
environment in which the leak detection equipment is calibrated shall be free
from refrigerant. It shall be guaranteed that the leak detection equipment
will not become potential ignition source, and is applicable to the
refrigerant to be detected. Leak detection equipment shall be set at a
percentage of the LFL of the refrigerant and shall be calibrated to the
refrigerant employed, and the appropriate percentage of gas (25 % maximum) is
confirmed. The fluid used for leak detection shall be applicable to most of
the refrigerant. The use of chlorine-containing solvent shall be avoided, to
avoid chemical reaction between chlorine and refrigerant and corrosion to
copper pipelines. In case leakage is suspected, the open fire at the site
shall be evacuated or be put out. In case welding is required at the leakage
position, all the refrigerants shall be recovered, or be isolated at a
position far from the leak point with a stop valve. Before and during welding,
the whole system shall be purified with OFN.
Safety Principles
The power supply should be cut off before the maintenance.
During product maintenance, favorable ventilation shall be guaranteed at the
maintenance site, and the close of all the doors/windows is not allowed.
Operation with open fire is not allowed, including welding and smoking. The
use of phones is also not allowed. The user shall be informed that cooking
with open fire is not allowed.
During maintenance in a dry season, when the relative humidity is less than
40%, anti-static measures shall be taken, including the wearing of cotton
clothes and cotton gloves.
In case the leakage of flammable refrigerant is identified during maintenance,
forced ventilation measures shall be taken immediately, and the source of leak
shall be plugged.
In case the product damaged must be maintained by disassembling the
refrigeration system, the product must be delivered to the maintenance point.
Welding of refrigerant pipelines at the user’s site is not allowed.
During maintenance, in case re-treatment is required due to lack of fittings,
the air conditioner shall be reset. The refrigeration system must be safely
earthed in the whole course of maintenance. For the door-to-door service with
refrigerant cylinders, the refrigerant charged inside the cylinder cannot
exceed the specified value. The cylinder placed in vehicles or at the
installation/maintenance site shall be fixed perpendicularly and be kept away
from heat sources, ignition source, source of radiation and electric
appliance.
9
Maintenance Items
Maintenance Requirements Before the refrigeration system is operated, the
circulating system shall be cleaned with nitrogen. Afterwards, the outdoor
unit shall be vacuumized, the duration of which cannot be less than 30
minutes. Finally, 1.5~2.0MPa OFN shall be used for nitrogen flushing (30
seconds~1 minute), to confirm the position requiring treatment. Maintenance of
the refrigeration system is only allowed after the residual gas of flammable
refrigerant is removed. During the use of refrigerant charging tools, cross
contamination of different refrigerants shall be avoided. The total length
(including the refrigerant pipelines) shall be shortened as much as possible,
to reduce the residual of refrigerant inside. The cylinders of refrigerant
shall be kept upright, and be fixed. Before refrigerant charging, the
refrigeration system shall be earthed. The refrigerant charged shall be of the
type and volume specified on the nameplate. Excessive charging is not allowed.
After maintenance of the refrigeration system, the system shall be sealed with
a safe manner. The maintenance in progress shall not damage or lower the
original class of safety protection of the system.
Maintenance of Electrical Components Partial of the electrical component under
maintenance shall be subject to inspection on refrigerant leakage with
dedicated leak detection equipment. After the maintenance, the components with
safety protection functions cannot be disassembled or removed. During the
maintenance of sealing elements, before opening the seal cover, the air
conditioner shall be powered off first. When power supply is required,
continuous leak detection shall be carried out at the most dangerous position,
to avoid potential risks. During maintenance of electrical components, the
replacement of enclosures shall not affect the level of protection. After
maintenance, it shall be guaranteed that the sealing functions will not be
damaged or the sealing materials will not lose the function of preventing the
entry of flammable gas due to aging. The substitute components shall meet the
recommended requirements of the air conditioner manufacturer.
Maintenance of Intrinsically Safe Elements The intrinsically safe element
refers to the components working continuously inside flammable gas without any
risks. Before any maintenance, leak detection and inspection on earthing
reliability of the air conditioner must be carried out, to ensure no leakage
and reliable earthing. In case the allowable voltage and current limit may be
surpassed during the service of the air conditioner, any inductance or
capacitance cannot be added in the circuit. Only the elements appointed by the
air conditioner manufacturer can be used as the parts and components replaced,
or otherwise a fire or explosion may be triggered in case of refrigerant
leakage. For the maintenance not involved in system pipelines, the system
pipelines shall be well protected, to ensure that no leakage will be caused
due to maintenance. After maintenance and before test run, the air conditioner
must be subject to leak detection and inspection on earthing reliability with
leak detection equipment or leak detecting solution. It shall be guaranteed
that the startup inspection is carried out without leakage and under reliable
earthing.
Removal and Vacuumizing The maintenance or other operations of the
refrigeration circuit shall be made as per conventional procedures. Moreover,
the flammability of refrigerant shall also be mainly considered. The following
procedures shall be followed: Refrigerant cleaning; Pipeline purification with
inert gas; Vacuumizing; Pipeline purification again with inert gas; Pipeline
cutting or welding. The refrigerant shall be recovered to a proper cylinder.
The system shall be purged with OFN, to ensure safety. The step above may need
to be repeated for several times. Compressed air or oxygen cannot be used for
purging.
In the course of purging, OFN shall be charged inside the refrigeration system
under vacuum state, to reach the operating pressure. Afterwards, the OFN shall
be discharged to the atmosphere. Finally, the system shall be vacuumized. The
step above shall be repeated until all the refrigerants in the system are
cleared. The OFN charged for the last time shall be discharged to the
atmosphere. Afterwards, the system can be welded. The operation above is
necessary in case of pipeline welding.
It shall be guaranteed that no alight fire source is around the outlet of the
vacuum pump and the ventilation is favorable.
Welding Favorable ventilation must be guaranteed in the maintenance area.
After the maintenance machine is subject to the vacuumizing above, the system
refrigerant can be discharged on the outdoor unit side. Before the outdoor
unit is welded, it must be guaranteed that no refrigerant is inside the
outdoor unit and the system refrigerant has been discharged and cleared. The
refrigeration pipelines cannot be cut with a welding gun under any
circumstance. The refrigeration pipelines must be disassembled with a pipe
cutter, and the disassembly must be carried out around a ventilation opening
10
Refrigerant Charging Procedures The following requirements are added as the
supplementation of conventional procedures:
During the use of refrigerant charging tools, cross contamination of different
refrigerants shall be avoided. The total length (including the refrigerant
pipelines) shall be shortened as much as possible, to reduce the residual of
refrigerant inside;
The cylinders of refrigerant shall be kept upright; Before refrigerant
charging, the refrigeration system shall be earthed; A label must be pasted on
the refrigeration system after refrigerant charging; Excessive charging is not
allowed; the refrigerant shall be charged slowly; In case system leakage is
identified, refrigerant charging is not allowed unless the leak point is
repaired; During refrigerant charging, the charging amount shall be measured
with an electronic scale or a spring scale. The connecting hose between the
refrigerant cylinder and the charging equipment shall be relaxed
appropriately, to avoid impact on the measuring accuracy due to stress.
Requirements on storage site of refrigerant The cylinder of refrigerant shall
be placed in a -10~50 environment with favorable ventilation, and warning
labels shall be pasted; The maintenance tool in contact with the refrigerant
shall be stored and used separately, and the maintenance tool of different
refrigerants cannot be mixed.
Scrapping
Scrapping and Recovery
Before scrapping, the technician shall be completely familiar with the equipment and all its features. The safe recovery of
refrigerant is recommended. In case the refrigerant recovered needs to be reused, before which the sample of refrigerant and
oil shall be analyzed.
(1) The equipment and operation shall be well known;
(2) Power supply shall be switched off;
(3) The followings shall be guaranteed before scrapping:
The mechanical equipment shall be convenient for operation on the cylinder of refrigerant (if necessary);
All personal protective equipment is available and being used correctly;
The whole course of recovery shall be guided by qualified personnel;
The recovery equipment and cylinders shall be in line with corresponding standards.
(4) The refrigeration system shall be vacuumized if possible;
(5) In case the vacuum state cannot be reached, vacuumizing shall be carried out from numerous positions, to pump the
refrigerant in each part of the system out;
(6) It shall be guaranteed that the capacity of cylinders is sufficient before recovery;
(7) The recovery equipment shall be started and operated as per the operation instructions of the manufacturer;
(8) The cylinder cannot be charged too full. (The refrigerant charged cannot exceed 80% of the capacity of cylinders)
(9) The maximum operating pressure of cylinders cannot be surpassed even only lasting for a short term;
(10) After refrigerant recovery is completed, the cylinder and equipment must be evacuated rapidly, and all the stop valves on
the equipment must be closed;
(11) Before purification and tests, the refrigerant recovered cannot be charged into another refrigeration system.
Note:
The air conditioner shall be marked (with dates and signature) after being scrapped and the refrigerant is discharged.
It shall be guaranteed that the sign on the air conditioner can reflect the flammable refrigerant charged inside.
Recovery During maintenance or scrapping, the refrigerant inside the
refrigeration system needs to be cleared. It is recommended
that the refrigerant be cleared thoroughly. The refrigerant can only be
charged into a dedicated cylinder, the capacity of which shall match with the
refrigerant amount
charged in the whole refrigeration system. All cylinders to be used are
designated for the recovered refrigerant and labeled for that refrigerant
(Dedicated Cylinder for Refrigerant Recovery). The cylinders shall be equipped
with pressure relief valves and stop valves under favorable state. The empty
cylinder shall be vacuumized before usage and be kept under normal
temperature.
The recovery equipment shall always be under favorable working state, and be
equipped with operation instructions, to facilitate information search. The
recovery equipment shall be applicable to the recovery of flammable
refrigerant. Moreover, weighing apparatus under available state with
measurement certificates shall be equipped. In addition, removable attachment
joints free from leakage shall be used as the hose, and shall always be under
favorable state. Whether the recovery equipment is under favorable state and
is properly maintained and whether all the electrical components are sealed
shall be checked before usage, to avoid fire or explosion in case of
refrigerant leakage. If you have any question, please consult the
manufacturer.
The refrigerant recovered shall be delivered back to the manufacturer in
appropriate cylinders, with transporting instructions being attached. Mixing
of refrigerant in recovery equipment (especially the cylinders) is not
allowed.
During transporting, the space in which the flammable refrigerant air
conditioners are loaded cannot be sealed. Antistatic measures shall be taken
for the transporting vehicles. Meanwhile, during the transporting, loading and
unloading of air conditioners, necessary protective measures shall be taken,
to protect the air conditioner from being damaged.
During removal of the compressor or clearing of the compressor oil, it shall
be guaranteed that the compressor is vacuumized to a proper level, to ensure
no residual flammable refrigerant is left inside the lubricating oil. The
vacuumizing shall be completed before the compressor is delivered back to the
manufacturer. The vacuumizing can only be accelerated by heating the
compressor housing through electrical heating. Safety shall be guaranteed when
the oil is discharged from the system.disassembled with a pipe cutter, and the
disassembly must be carried out around a ventilation opening
11
Carefully read the following information in order to operate the air
conditioner correctly.
Below are listed three kinds of Safety Precautions and Suggestions.
WARNINGIncorrect operations may result in severe consequences of death or
serious injuries. CAUTION Incorrect operations may result in injuries or
machine damages; in some cases may cause serious consequences.
INSTRUCTIONS: These information can ensure the correct operation of the
machine.
The following safety symbols are used throughout this manual: :Indicates an
action that must be avoided.
! :Indicates that important instructions must be followed. :Indicates a part
which must be grounded. :Beware of electric shock (This symbol is displayed on
the main unit label.)
After completing installation, test the unit to check for installation errors.
Give the user adequate instructions concerning the use and cleaning of the
unit according to the Operation Manual.
Be sure to conform with the following important Safety Precautions.
WARNING
If any abnormal phenomena is found
(e. g.smell of firing), please open the
switch off
window and well ventilated the room
immediately, then cut off the power supply immediately,
and contact the dealer to find out the handling method.
In such case, to continue using the conditioner will damage
the conditioner, and may cause electrical shock, fire, or
explosion hazard.
After a long time use of air-conditioner, the base should be checked for any damages. If the damaged base is not repaired, the unit may fall down and cause accidents.
Don’t dismantle the outlet of the outdoor unit. The exposure of fan is very
dangerous which may harm human beings.
When need maintenance and repairment, call dealer to handle it. Incorrect
maintenance and repairment may cause water leak, electrical shock, fire, and
explosion hazard.
WARNING
No goods or nobody is permitted to placed on or stand on outdoor unit.The
falling of goods and people may cause accidents.
Don’t operate the air-conditioner with damp hands.Otherwise it will be
shocked.
Only use correctly-typed fuse. May not use wire or any other materials
replacing fuse, otherwise it may cause faults or fire accidents.
Use drain pipe correctly to ensure efficient drainage. Incorrect pipe use may
cause water leaking.
Installed explosion-proof electrical-leaking circuit breaker. It easily cause
electrical shock without circuit breaker.
Air-conditioner can’t be installed in the environment with inflammable gases because the inflammable gases near air-conditioner may cause fire and explosion hazard. Please let the dealer be responsible for installing the conditioner. Incorrect installation may cause water leak, electrical shock, fire, and explosion hazard.
Call the dealer to take measures to prevent the refrigerant from leaking. If conditioner is installed in a small room, be sure to take every measure in order to prevent suffocation and explosion accident even in case of refrigerant leakage.
When conditioner is installed or reinstalled, the dealer should be responsible for them. Incorrect installation may cause water leaking, electrical shock, fire, and explosion hazard.
Connect earthing wire. Earthing wire should not be connected to the gas pipe, water pipe, lightning rod or phone line, incorrect earthing may cause shock.
Earthing
12
WARNING
Have the unit professionally installed. Improper installation by an
unqualified person may result in water leak, electric shock, fire, or
explosion.
Place the unit on a stable, level surface that withstands the weight of the
unit to prevent the unit from tipping over or falling causing injury as a
result.
Only use specified cables for wiring. Securely connect each cable, and make
sure that the cables are not straining the terminals. Cables not connected
securely and properly may generate heat and cause fire and explosion.
Take necessary safety measures against typhoons and earthquakes to prevent the
unit from falling over.
Be sure to carefully follow each step in this handbook when installing the
unit. Improper installation may result in water leak, electric shock, smoke or
fire.
Have all electrical work performed by a licensed electrician according to the
local regulations and the instructions given in this manual. Secure a circuit
designated exclusively to the unit. Improper installation or a lack of circuit
capacity may cause the unit to malfunction or present a risk of electric
shock, smoke,and fire.
Securely attach the terminal cover(panel) on the unit. If installed
improperly, dust and/or water may enter the unit and present a risk of
electric shock, smoke, fire, or explosion.
Do not make any changes or modifications to the unit. In case of problems, consult the dealer. If repairs are not made properly, the unit may leak water and present a risk of electric shock, or it may produce smoke or cause fire and explosion.
Only use refrigerant R32 as indicated on the unit when installing or relocating the unit. The use of any other refrigerant or an introduction of air into the unit circuit may cause the unit to run an abnormal cycle and abnormal cycle and cause the unit to burst.
WARNING
Do not touch the fins on the heat exchanger with bare hands, for they are
sharp and dangerous.
In the event of a refrigerant gas leak, provide adequate ventilation to the
room. If leaked refrigerant gas is exposed to a heat source, noxious gases,
fire or explosion will be caused.
Do not try to defeat the safety features of the devices, and do not change the
settings. Defeating the safety features on the unit such as the pressure
switch and temperature switch or using parts other than the dealer or
specialist may result in fire or explosion.
When installing the unit in a small room, safeguard against hypoxia that
results from leaked refrigerant reaching the threshold level. Consult the
dealer for necessary measures to take.
When relocating the air conditioner, consult the dealer or a specialist.
Improper installation may result in water leak, electric shock, or fire.
After completing the service work, check for a refrigerant gas leak. If leaked
gas refrigerant is exposed to a heat source such as fan heater,stove,and
electric grill, noxious gases may form.
Only use specified parts. Have the unit professionally installed. Improper
installation may cause water leak, electric shock,smoke, fire, explosion.
13
Precautions for Handling Units for Use with R32
Caution
Do not use the existing refrigerant piping
Use a vacuum pump with a reverse-flow check valve.
The old refrigerant and refrigerator oil in the existing piping If other types of valves are used, the vacuum pump oil will
contain a large amount of chlorine, which will cause the
flow back into the refrigerant cycle and cause the refrigerator
refrigerator oil in the new unit to deteriorate.
oil to deteriorate.
R32 is a high-pressure refrigerant, and the use of the existing piping may result in bursting.
Do not use the following tools that have been used with the conventional refrigerants. Prepare tools that are for exclusive
use with R32.
(Gauge manifold, charging hose, gas leak detector,
reverse-flow check valve, refrigerant charge base,vacuum
gauge, and refrigerant recovery equipment.)
Keep the inner and outer surfaces of the pipes clean and
If refrigerant and/or refrigerant oil left on these tools are
free of contaminants such as sulfur, oxides, dust/dirt shaving mixed in with R32, or if water is mixed with R32, it will
particles,oils,and moisture.
cause the refrigerant to deteriorate.
Contaminants inside the refrigerant piping will cause the Since R32 does not contain chlorine, gas-leak detectors
refrigerant oil to deteriorate.
for conventional refrigerators will not work.
Caution
Store the piping to be used during installation indoors, and Do not use a charging cylinder.
keep both ends of the piping sealed until immediately before The use of charging cylinder will change the composition
brazing.(keep elbows and other joints wrapped in plastic.) of the refrigerant and lead to power loss.
If dust, dirt, or water enters the refrigerant cycle, it may
cause the oil in the unit to deteriorate or may cause the
compressor to malfunction.
Exercise special care when handling the tools.
Use a small amount of ester oil, ether oil, or alkylbenzene to coat flares and
flange connections.
A large amount of mineral oil will cause the refrigerating
An introduction of foreign objects such as dust, dirt or water into the refrigerant cycle will cause the refrigerating machine oil to deteriorate.
machine oil to deteriorate.
Use liquid refrigerant to charge the system. Charge the unit with gas refrigerant will cause the refrigerant in the cylinder to change its composition and will lead to a drop in performance
Only use R32 refrigerant. The use of refrigerants containing chlorine(i.e. R22) will cause the refrigerant to deteriorate.
Before Installing the Unit
Caution
Do not install the unit in a place where there is a possibility When installing the unit in a hospital, take necessary measures
of flammable gas leak.
against noise.
Leaked gas accumulated around the unit may start a fire High-frequency medical equipment may interfere with the
or explosion.
normal operation of the air conditioning unit or the air
Do not use the unit to preserve food, animals, plants, artifacts, conditioning unit may interfere with the normal operation
or for other special purposes.
of the medical equipment
The unit is not designed to provide adepuate conditions
to preserve the quality of these items.
Do not use the unit in an unusual environment The use of the unit in the presence of a large amount of
oil, steam, acid, alkaline solvents or special types of sprays
may lead to a remarkable drop in performance and/or Do not place the unit on or over things that may not get wet.
malfunction and presents a risk of electric shock, smoke, When humidity level exceeds 80% or when the drainage
fire, or explosion.
system is clogged, indoor units may drip water.
The presence of organic solvents, corroded gas (such as Installation of a centralized drainage system for the outdoor
ammonia,sulfur compounds,and acid may cause gas or unit may also need to be considered to prevent water drips
water leak.)
from the outdoor units.
14
Before Installing (Relocating) the Unit or Performing Electric Work
Caution
Ground the unit.
Do not spray water on the air conditioners or immerse the
Do not connect the grounding on the unit to gas pipes,water air conditioners in water.
pipes, lightning rods, or the grounding terminals of
Water on the unit presents a risk of electric shock.
telephones. Improper grounding presents a risk of electric
shock, smoke, fire, explosion, or the noise caused by
Periodically check the platform on which is placed for damage
improper grounding may cause the unit to malfunction. to prevent the unit from falling.
Make sure the wires are not subject to tension. If the wires are too taut, they may break or generate heat
If the unit is left on a damaged plarform, it may topple over, causing injury.
and/or smoke and cause fire or explosion.
When installing draining pipes, follow the instructions in the
Install a breaker for current leakage at the power source to avoid the risk of
electric shock.
Without a breaker for current leakage, there is a risk of electric shock,
smoke or fire.
manual, and make sure that they properly drain water so as to avoid dew
condensation.
If not installed properly, they may cause water leaks and damage the
furnishings.
Use breakers and fuses (electrical current breaker, remote switch<switch+Type-B fuse>,molded case circuit breaker) with a proper current capacity.
Properly dispose of the packing materials. Things such as nails may be included in the package. Dispose of them properly to prevent injury. Plastic bags present a choking hazard to children. Tear
The use of large-capacity fuses, steel wire, or copper wire up the plastic bags before disposing of them to prevent
may damage the unit or cause smoke or fire.
accidents.
Before the Test Run
Caution
Do not operate switches with wet hands to avoid electric
shock. Do not touch the refrigerant pipes with bare hands during
Do not turn off the power immediately after stopping the unit. Allow for at least five minutes before turning off the unit, otherwise the unit may leak water or experience other
and immediately after operation.
problems.
Depending on the state of the refrigerant in the system,
certain parts of the unit such as the pipes and compressor
may become very cold or hot and may subject the person
to frost bites or burning.
Do not operated the unit without panels and safety guards in their proper
places.
They are there to keep the users from injury for accidentally Do not operate
the unit without air filters. touching rotating, high-tempreture or high-
voltage parts. Dust particles in the air may clog the system and cause
malfunction.
Move and scrap the air conditioning
When moving, to disassemble and re-install the air conditioning, please
contact your dealer for technical support. In the composition material of air
conditioning, the content of lead, mercury, hexavalent chromium,
polybrominated biphenyls and polybrominated diphenyl ethers are not more than
0.1% (mass fraction) and cadmium is not more than 0.01% (mass fraction).
Please recycle the refrigerant before scrapping, moving, setting and repairing
the air conditioning; for the air conditioning scrapping, should be dealt with
by the qualified enterprises.
15
Read Before Installation
Items to Be Checked
(1) Verify the type of refrigerant used by the unit to be serviced.
Refrigerant Type: R32 (2) Check the symptom exhibited by the unit to be
serviced. Look in this service handbook for symptoms relating to the
refrigerant cycle. (3) Be sure to carefully read the safety precautions at the
beginning of this document. (4) If there is a gas leak or if the remaining
refrigerant is exposed to an open flame, a noxious gas hydrofluoric acid may
form. Keep workplace well ventilated.
CAUTION Install new pipes immediately after removing old ones to keep moisture
out of the refrigerant circuit. Chloride in some types of refrigerants such as
R22 will cause the refrigerating machine oil to deteriorate.
Necessary Tools and Materials Prepare the following tools and materials
necessary for installing and servicing the unit. Necessary tools for use with
R32 (Adaptability of tools that are for use with R407C).
1. To be used exclusively with R32 ( Not to be used if used with R22 or R407C
)
Tools/Materials Gauge Manifold Charging Hose Refrigerant Recovery Equipment Refrigerant Cylinder Refrigerant Cylinder Charging Port Flare Nut
Use Evacuating,refrigerant charging Evacuating, refrigerant charging Refrigerant recovery Refrigerant charging Refrigerant charging Connecting the unit to piping
Notes 5.09MPa on the High-pressure side. Hose diameter larger than the
concentional ones.
Write down the refrigerant type. Pink in color at the top of the cylinder.
Hose diameter larger than the conventional ones. Use Type-2 Flare nuts.
2. Tools and materials that may be used with R32 with some restrictions
Tools/Materials Gas leak detector Vacuum Pump Flare Tool Refrigerant Recovery Equipment
Use Detection of gas leaks Vacuum drying Flare machining of piping Recovery of refrigerant
Notes The ones for HFC type refrigerant may be used. May be used if a reverse flow check adaptor is attached. Chages have been made in the flare machining dimension.Refer to the next page. May be used if designed for use with R32
3. Tools and materials that are used with R410A that can also be used with R32
Tools/Materials Vacuum Pump with a Check Valve Bender Torque Wrench Pipe Cutter Welder and Nitrogen Cylinder Refrigerant Charging Meter Vacuum Gauze
Use Vacuum drying Bending pipes Tightening flare nuts Cutting pipes Welding pipes Refrigerant charging Checking vacuum degree
Notes Only 12.70 (1/2”) and 15.88(5/8”) have a larger flare machining dimension.
4. Tool and materials that must not used with R32
Tools/Materials Charging Cylinder
Use Refrigerant Charging
Notes Must not be used with R32-type units.
Tools for R32 must be handled with special care, and keep moisture and dust from entering the cycle.
16
R32 leakage Test
No changes from the conventional method. Note that a refrigerant leakage
detector for R22 or R410A cannot detect R32 leakage.
NO
NO
Halide torch
R22 or R407C leakage detector
Items to be strictly observed : 1.Pressurize the equipment with nitrogen up to
the design pressure and then judge the equipment’s air tightness, taking
temperature variations into account. 2.When investigating leakage locations
using a refrigerant, be sure to use R32. 3.Insure that R32 is in a liquid
state when charging.
Reasons:
1.Use of oxygen as the pressurized gas may cause an explosion. 2.Charging with
R32 gas will lead the composition of the remaining refrigerant in the cylinder
to change and then this
refrigerant can not be used.
Vacuuming 1.Vacuum pump with check valve
A vacuum pump with a check valve is required to prevent the vacuum pump oil
from flowing back into the refrigerant circuit when the vacuum pump power is
turned off (power failure). It is also possible to attach a check valve to the
actual vacuum pump afterwards.
2.Standard degree of vacuum for the vacuum pump Use a pump which reaches 65Pa
or below after 5 minutes of operation. In addition, be sure to use a vacuum
pump that has been properly maintained and oiled using the specified oil. If
the vacuum pump is not properly maintained, the degree of vacuum may be too
low.
3.Required accuracy of the vacuum gauge Use a vacuum gauge that can measure up
to 650Pa. Do not use a general gauge manifold since it cannot measure a vacuum
of 650Pa.
4.Evacuating time Evacuate the equipment for 1 hour after 650Pa has been
reached. After envacuating, leave the equipment for 1 hour and make sure the
that vacuum is not lost.
5.Operating procedure when the vacuum pump is stopped In order to prevent a
backflow of the vacuum pump oil, open the relief valve on the vacuum pump side
or loosen the charge hose to drawn in air before stopping operation.The same
operating procedure should be used when using a vacuum pump with a check
valve.
Charging Refrigerant
R must be in a liquid state when charging.
Reasons: R32 is a pseudo-azeotropic refrigerant (boiling point R32= -52 C,
R125= -49 C) and can roughly be handled in the same way as R410A; however, be
sure to fill the refrigerant from the liquid side, for doing so from the gas
side will somewhat change the composition of the refrigerant in the cylinder.
Note
In the case of a cylinder with a syphon, liquid R32 is charged without turning
the cylinder up side down. Check the type of cylinder before charging.
Remedies to be taken in case of a refrigerant leak When refrigerant leaks,
additional refrigerant may be charged. (Add the refrigerant from the liquid
side)
Characteristics of the Conventional and the New Refrigerants Because R32 is a
simulated azeotropic refrigerant, it can be handled in almost the same manner
as a refrigerant such as R410A. Howerver, if the refrigerant is removed in the
vapor phase, the composition of the refrigerant in the cylinder will somewhat
change. Remove the refrigerant in the liquid phase. Additional refrigerant may
be added in case of a refrigerant leak.
17
Accessories
Accessories supplied with the outdoor unit:
No.
Drawing
Name of parts
1
Drainage elbow
Quantity 5U125S2PN1FA
2
4
2
Rubber cushion
4
4
3
Clap
3
3
Procedure for Selecting the Location
- Choose a place solid enough to bear the weight and vibration of the unit,
where the operation noise will not be amplified. 2) Choose a location where
the hot air discharged from the unit or the operation noise, will not cause a
nuisance to the neighbors of the user. 3) Avoid places near a bedroom and the
like, so that the operation noise will cause no trouble. 4) There must be
sufficient space for carrying the unit into and out of the site. 5) There must
be sufficient space for air passage and no obstructions around the air inlet
and the air outlet. 6) The site must be free from the possibility of flammable
gas leakage in a nearby place.
Locate the unit so that the noise and the discharged hot air will not annoy the neighbors. 7) Install units, power cords and inter-unit cables at least 3048mm away from television and radio sets. This is to prevent interference to images and sounds. (Noises may be heard even if they are more than 3048mm away depending on radio wave conditions.) 8) In coastal areas or other places with salty atmosphere of sulfate gas, corrosion may shorten the life of the air conditioner. 9) Since drain flows out of the outdoor unit, do not place under the unit anything which must be kept away from moisture. 10) On a flat surface that does not collect rain water. 11) Away from strong wind. 12) Away from direct exposure to rain or snow. 13) Away from sea breeze. 14) Away from inflammable materials. 15) Away from high temperature or open flames.
NOTE: - Cannot be installed hanging from ceiling or stacked. 2) If installing on a high place such as a roof, with a fence or guard rail around it. 3) If there is a potential for accumulated snow to block the air inlet or heat exchanger, install the unit on a higher base. 4) R32 refrigerant is an unsafe, nontoxic and flammable refrigerant. However, if there is a concern about a dangerous level of refrigerant concentration in the case of refrigerant leakage, add extra ventilation. 5) Avoid installing the outdoor unit where corrosive gases, such as sulfur oxides, ammonia, and sulfurous gas, are produced. If unavoidable, consult with an installation specialist about using a corrosion- proof or anti-rust additive to protect the unit coils.
18
Procedure for Selecting the Location
6) For seacoast applications, block the unit from direct exposure to sea
breeze by installing the unit behind a structure (such as a building) or a
protective wall that is 1.5 times higher than the unit, leaving 700 mm of
space between the wall and unit for air circulation.Consult an installation
expert about taking anti-corrosion measures, such as removing salinity on the
heat exchanger and applying a rust inhibitor more frequently than once a year.
Sea breeze Sea
Sea breeze Sea
ODU
ODU
ODU
Protection walls
Sea breeze
ODU
Sea
ODU
- Set the unit on mounting brackets or pad. To avoid the adverse effects of snow, ice and defrosting issues, install the unit on heat pump risers to ensure a sufficient height from the ground. In all cases, refer to local code for correct riser height. Make sure the outdoor unit is installed level and is stable. Install snow protection hood as necessary.
19
Installation drawings of indoor and outdoor units
Do not connected the embedded branch piping and the outdoor unit when only
carrying out piping work without connecting the indoor unit in order to add
another indoor unit later. Make sure no dirt or moisture gets into either side
of the embedded branch piping. Installation figure please refers to the
following.
More than 5cm
More than 10cm
Wrap the insulation pipe with the finishing tape from bottom to top.
Cut thermal insulation pipe to an appropriate length and wrap it with tape,
making sure that no gap is left in the insulation pipe’s cut line.
Arrangement of piping directions
Rear left
Left
Rear right
Right Below
Attention must be paid to the rising up of drain hose
More than 30cm
more than 10cm
¡æ
more than 10cm
A
B
C
D
E
more than 60cm
more than 25cm
If there is the danger of the unit falling or overturning, fix the unit with foundation bolts, or with wire or other means. If the location does not have good drainage, place the unit on a level mounting base(or a plastic pedestal). Install the outdoor unit in a level position. Failure to do so may result in water leakage or accumulation.
20
Precautions on Installation
Check the strength and level of the installation ground so that the unit will
not cause any operating vibration or noise after installed. In accordance with
the foundation drawing in fix the unit securely by means of the foundation
bolts.(Prepare four sets of M8 or M10 foundation bolts, nuts and washers each
which are available on the market.) It is best to screw in the foundation
bolts until their length are 20mm from the foundation surface.
20
Outdoor Unit Installation Guideline
Where a wall or other obstacle is in the path of outdoor unit’s intake or exhaust airflow, follow the installation guidelines below. For any of the below installation pattems, the wall height on the exhaust side should be 1200mm or less.
Wall facing one side More than 50
More than 300
1200 or less
Side view Wall facing two sides
More than 100
More
More
than 300
than 100
Side view
More than 50
Wall facing three sides More than 150
More than 50
More than 300 Side view
Limitations on the installation
1.Precautions on installation
Check the strength and level of the installation ground so that unit will not
cause any operating vibration or noise after installation. In accordance with
the foundation drawing in fix the unit securely by means of the foundation
bolts. It is best to screw in the foundation bolts until their length are 20
mm from the foundation surface.
2.Selecting a location for installation of the indoor units The maxinum
allowable length of refrigerant piping, and the maximum allowable height
difference between the outdoor and indoor units, are listed below. (The
shorter the refrigerant piping, the better the performance. Connect so that
the piping is as short as possible. Shortest allowable length per room is 3m)
Outdoor unit capacity class
Piping to each indoor unit Total length of piping between all units
3U55S2PR1FA 25m max. 50m max.
4U71S2PR1FA 4U80S2PR1FA
25m max. 70m max.
21
5U100S2PS1FA 25m max. 80m max.
5U125S2PN1FA 25m max. 100m max.
Limitations on the installation
Indoor Unit
Level difference: 15m max.
Level difference: 7.5m max.
Outdoor Unit
If the outdoor unit is positioned higher than all indoor units.
Level difference: 15m max.
Level difference: 7.5m max.
Outdoor Unit Indoor Unit
If the outdoor unit is positioned higher than one or more indoor units. (If lower than one or more indoor units.)
If all indoor units are positioned higher than the outdoor unit.
Refrigerant piping work
1. Installing outdoor unit 1) When installing the outdoor unit, refer to
“Precautions for Selecting the Location” and the “Indoor/Outdoor Unit
Installation Drawings”. 2)If drain work is necessary, follow the procedures
below. 2. Drain work 1) Use drain plug for drainage. 2) If the drain port is
covered by a mounting base or floor surface, place additional foot bases of at
least 30mm in height under the outdoor unit’s feet. 3) In cold areas, do not
use a drain hose with the outdoor unit.(Otherwise, drain water may freeze,
impairing heating performance.)
Drain elbow
Hose 22
Refrigerant piping work
3. Refrigerant piping work
1). Align the centres of both flares and tighten the flare nuts 3 or 4 turns
by hand. Then tighten them fully with the torque wrenches. Use torque wrenches
when tightening the flare nuts to prevent damage to the flare nuts and
escaping gas.
Flare nut tightening torque Flare nut for 6.35 14.2-17.2N.m(144-175kgf.cm) Flare nut for 9.52 32.7-39.9N.m(333-407kgf.cm) Flare nut for 12.7 49.5-60.3N.m(505-615kgf.cm) Flare nut for 15.88 61.8-75.4N.m(630-769kgf.cm)
Coat here with refrigeration oil
Torque spanner Spanner
Valve cap tightening torque Liquid pipe 26.5-32.3N.m(270-330kgf.cm) Gas pipe 48.1-59.7N.m(490-610kgf.cm)
Service port cap tightening torque 10.8-14.7N.m(110-150kgf.cm)
Pipe joint Cone nut
2)To prevent gas leakage, apply refrigeration oil on both inner and outer surfaces of the flare. (Use refrigeration oil for R32)
4. Purging air and checking gas leakage
When piping work is completed, it is necessary to purge the air and check for
gas leakage.
WARNING
- Do not mix any substance other than the specified refrigerant (R32) into
the refrigeration cycle. 2) When refrigerant gas leaks occur, ventilate the
room as soon and as much as possible. 3) R32, as well as other refrigerants,
should always be recovered and never be released directly into the
environment. 4) Use a vacuum pump for R32 exclusively. Using the same vacuum
pump for different refrigerents may damage the vacuun pump or the unit.
If using additional refrigerant, perform air purging from the refrigerant pipes and indoor unit using a vacuum pump, then charge additional refrigerant. Use a hexagonal wrench (4mm) to operate the stop valve rod. All refrigerant pipe joints should be tightened with a torque wrench at the specified tightening torque.
Connect projection side of charging hose(Which comes from gauge manifold) to gas stop valve’s service port.
Fully open gauge manifold’s low-pressure valve(Lo) and completely close its
high-pressure valve(Hi). (High-pressure valve subsequently requires no
operation.)
Apply vacuum pumping. Check that the compound pressure gauge
reads-0.1MPa(-76cmHg). Evacuation for at lease 1 hour is recommended.
Close gauge manifold’s low-pressure valve(Lo) and stop vacuum pump. (Leave as
is for 4-5 minutes and make sure the coupling meter needie does not go back.
If it does go back, this may indicate the presence of moisture or leaking from
connecting parts. After inspecting all the connection and loosening then
retightening thenuts, reqeat steps 2-4. )
Remove covers from liquid stop valve and gas stop valve.
Turn the liquid stop valve’s rod 90 degrees counterclockwise with a hexagonal
wrench to open valve. Close it after 5 seconds, and check for gas leakage.
Using soapy water, check for gas leakage from indoor unit’s flare and outdoor
unit’s flare and valve rods. After the check is complete, wipe all soapy water
off.
Disconnect charging hose from gas stop valve’s service port, then fully open
liquid and gas stop valves. (Do not attempt to turn valve rod beyond its
stop.)
Tighten valve caps and service port caps for the liquid and gas stop valves
with a torque wrench at the specified torques. See “3 Refrigerant piping ” on
page 23 for details.
23
5. Refilling the refrigerant
Check the type of refrigerant to be used on the machine nameplate. Precautions
when adding R32 Fill from the liquid pipe in liquid form.(recommend)
- Before filling, check whether the cylinder has a siphon attached or not.(It should have something like “liquid filling siphon attached” displayed on it.) (recommend)
Filling a cylinder with an attached siphon
Filling other cylinders
Stand the cylinder upright when filling.
There is a siphon pipe inside, so the cylinder need not be upside-down to fill
with liquid.
Turn the cylinder upside-down when filing.
- Be sure to use the R32 tools to ensure pressure and to prevent foreign objects entering.
6. Charging with refrigerant
- This system must use refrigerant R32. 2) Add refrigerant 20g per meter when the total piping length exceeds the standard value, but make sure that the total liquid piping length should be less than the max. value.
3U55S2PR1FA 4U71S2PR1FA 4U80S2PR1FA
30m 40m
50m 70m
5U100S2PS1FA
40m
80m
7.Precautions for Laying Refrigerant Piping
5U125S2PN1FA
50m
100m
Cautions on pipe handling
- Protect the open end of the pipe against dust and moisture. 2) All pipe
bends should be as gentle as possible. Use a pipe bender for bending.(Bending
radius should be 30 to 40mm or larger.)
Selection of copper and heat insulation materials
When using commercial copper pipes and fittings, observe the following : 1) Insulation material: Polyethylene foam
Heat transfer rate: 0.041 to 0.052W/mK(0.035to 0.045kcal/mhoC) Refrigerant gas pipe’s surface temperature reaches 110oC max. Choose heat insulation materials that will withstand this temperature. 2) Be sure to insulate both the gas and liquid piping and to provide insulation dimensions as below.
Gas pipe O.D.:9.52mm,12.7mm Thickness:0.8mm Liquid pipe
O.D.:6.35mm Thickness:0.8mm
Gas pipe insulation
I.D.:12-15mm Thickness:13mm min.
Liquid pipe insulation
I.D.:8-10mm Thickness:10mm min.
24
- Use separate thermal insulation pipes for gas and liquid refrigerant pipe.
Inter unit wiring
Gas pipe
Liquid pipe
Rain
Gas pipe insulation
Liquid pipe insulation
Be sure to
Wall
place a cap.
If no flare cap is available, cover the flare mouth with tape to keep dirt or water out.
Finishing tape Drain hose
Check
Flare’s inner surface must be flaw-free.
The pipe end must be evenly flared in a perfect circle.
Make sure that the flare nut is fitted.
Set exactly at the position shown below.
A
Flare tool for R32
Flare tooling die
Clutch-type 0-0.5mm
Cut exactly at right angles.
Remove burrs
Conventional flare tool
Clutch-type(Rigid-type) Wing-nuttype(Imperial-type)
1.0-1.5mm
1.5-2.0mm
8.Cutting and Flaring work of piping
Pipe cutting is carried out with a pipe cutter and burs must be removed. After
inserting the flare nut, flaring work is carried out.
Pipe
Pipe diameter Size A (mm)
A
Liquid side 6.35mm(1/4″) 0.8~1.5
Flare tooling die Gas side
9.52mm(3/8″) 12.7mm(1/2″)
1.0~1.5 1.0~1.5
Correct
Incorrect
Lean Damage of flare Crack Partial Too outside
9. On drainage Please install the drain hose so as to be downward slope without fail. Please don’t do the drainage as shown below.
It becomes high midway.
The end is immersed in water
It waves.
Less than 5cm
It gap with the ground its too small.
There is the bad smell from a ditch.
Please pour water in the drain pan of the indoor unit, and confirm that
drainage is carried out thoroughly to outdoor. In case that the attached drain
hose is in a room, please apply heat insulation to it without fail.
WARNING
- Do not use mineral oil on flared part. 2) Prevent mineral oil from getting into the system as this would educe the lifetime of the units. 3) Never use piping which has been used for previous installations. Only use parts which are delivered with the unit. 4) Do never install a drier to this R32 unit in order to guarantee its lifetime. The drying material may dissolve and damage the system. 5) Incompete flaring may cause refrigerant gas leakage.
25
Pump Down Operation
In order to protect the environment, be sure to pump down when relocating or disposing of the unit.
- Remove the valve caps from liquid stop valve and gas stop valve. 2) Carry out forced cooling operation. 3) After five to ten minutes, close the liquid stop valve with a hexagonal wrench. 4) After two to three minutes, close the gas stop vaile and stop forced cooling operation.
liquid stop valve
Wiring work
1. Electric wiring
Gas stop valve
Hexagonal wernch Close
Valve cap
and the communication wire
2. Wiring method
Wiring method of orbicular terminals For the connection wire with orbicular
terminals, its wiring method is as shown in the right figure: remove the
connecting screw, put the screw through the ring on the end of the wire, then
connect to the terminal block and fasten screw.
Wiring method of straight terminals. For the connection wire without orbicular
terminals, its wiring method is: loosen the connection screw, and insert the
end of the connection wire completely into the Terminal block, then fasten the
screw. Slightly pull the wire outwards to confirm it is firmly held.
Crimp connection method for wires without terminals
Connect the wire with same diameter to the
two sides of the terminal
Do not connect the wire with same diameter
to the same side
Do not connect the wire with different
diameters
(More than 30m, choose H07RN-F4G 4.0mm²)
Wiring Method for Ring Terminal Block
Correct Pressing
Wrong Pressing
Terminal block
Pressing Clamps
Crimp connection method for connection wire After connection,the wire must be
fastened by wire cover. The wire cover shall press on the protection coat of
the connection wire,as shown in right top figure. Note:When connecting the
wiring,confirm the terminal number of indoor and outdoor units carefully.
Incorrect wiring will damage the controller of air conditioner or the unit can
not operate.
3. Wiring method of outdoor unit:
Remove the cover of terminal box and clamp. Power Line Connect respectively
the live wire, neutral wire, ground wire to the L/N on terminal block and
grounding screw on metal sheet. Communication Line between Indoor & Outdoor
E.g. Connect respectively the terminal 1/2/3/GND of Indoor B to the 1/2/3 on
Terminal B and grounding screw on metal sheet of Outdoor. Max. 5 indoor units
for 5U outdoor and the rest outdoors follow the same logic. Reinstall the
clamp and cover of terminal box according to the Installation Manual, after
the connection above-mentioned done
Note: Power cord and communication wire are provided by consumers themselves.
26
Wiring work
¡æ
A
B
C
D
E
Valve cover
Terminal block
4. Wiring method of indoor unit Loosen wire cover and connect the power cord
and communication wire of indoor unit to the terminal correspondingly.
Note: When connecting power cord to power supply terminal, please pay
attention to the following items:
Do not connect the power cord with different dimensions to the same connection
wire end. Improper contact will cause heat generation. Do not connect the
power line with different dimensions to the same grounding wire end. Improper
contact will affect protection. Do not connect the power line to the
connecting end of communication wire. Incorrect connection will cause damage
to the connected unit. The wiring should ensure that the ground line is the
last one to be broken off by force.
5. Example wiring diagram. Wiring diagram please refers to the following.
Optional
27
¡æ
¡ æ
Dred function
Please consult your reseller and/or installer to determine if you have a DRED
device. Connect output from your DRED device (where available) to the
RJ45connector on the outdoor unit, as shown. 1. Open cover piece and locate
the fixed DRM cable.
A
B
C
DE
a
b
a. Take out DRED module from indoor packing bag. b. Separate DRED module to 3
parts as shown. c. Continue to separate the DRED module to 7 parts as shown
3.
4 3 12
3 21
c
a
b
c
a. Fix Pin 1 for contractor supplied line through nut 1,seal ring 2,tapered cup nut 3 insert to stud 4.
b. Repeat step 1 for fixed DRM line.
c. Tighten the screw position on both sides.
A
B
C
D
E
a. Tighten the DRED module to right side plate. b.Tighten the screw . Insert
the DRED terminal into the 5 core ports in PCB , check the picture. c. Refit
the trim cover.
28
Test running
Before starting the test running, please confirm the following works have been done successfully.
-
Correct piping work;
-
Correct wiring work;
-
Correct match of indoor and outdoor unit;
-
Proper recharge of refrigerant if needed.
Make sure that all the stop valves are fully open.
Check the voltage supplied to the outdoor and indoor units, please confirm that is 220-240V.
Wiring Error Check
This product is capable of automatic checking of wiring error.
CN2
CN3
Switch on all the 4 dip-switches on the outdoor unit small service PC-board as shown on the right. Then power off the unit and power on again, the system will enter the operation of “Wiring Error Check”. After 3 minutes
CN4
ON SW1
stand-by, the unit starts for automatic wiring checking.
1234
Approximately 30 ~ 50minutes (depends on how many units installed in the system) after the unit starts, the
CN1
Errors of the wiring will be shown by the LEDs (1 to 3).
1 2 3 45
During this operation, the digital-number will alternately show the compressor working frequency (e.g. 50 stands for the current running
frequency) and letter “CH”(means checking).
After this operation, if all the wiring is correct, the digital-number will show “0”, if there has wrong wiring, the digital-number will show “EC”(error
connection) and also it will flashing.
The service monitor LEDs indicate the error of wiring, as shown in the table below. For details about how to read the LED display, refer to
the service manual.
If self-checking is not possible, check the indoor unit wiring and piping in the usual manner.
Status
Only one LED flashing
Test running. 1) To test cooling, set the lowest temperature at 16 OC. To test heating,set the highest temperature, at 30 OC. If the temperature is lower than
16 OC, it is impossible to test cooling with remote controller, and also when the temperature is higher than 30 OC, it is impossible to test
heating.
- Please check both cooling and heating operation of each unit individually and then also check the simultaneous operation of all indoor
units.
-
After running the unit for about 20 minutes, check the indoor unit outlet temperature.
-
After the unit is stopped, or working mode changed, the system will not start again for about 3 minutes.
-
During cooling operation, frost may occur on the indoor unit or pipes, this is normal.
-
Operate the unit according to the operation manual. Please kindly explain to our customers how to operate through the instruction manual.
Seven-segment numeric display 1) When unit is running, this seven-segment numeric will display the frequency of compressor. For example,” ” means compressor running frequency is 40 Hz, ” ” means compressor running frequency is 108Hz.
CN2 CN4
CN3 ON SW1
- When faulty happens, seven-segment numeric will flash and display some numbers, this number is
1234
failure code. For example, a flashing ” ” means No.15 failure, that is indoor and outdoor communication
CN1
error.
3U55S2PR1FA and are with 3 green LED that means 3 indoor units,4U71S2PR1FA and 4U80S2PR1FA with 4 green LED means 4 indoor units. 5U100S2PS1FA and 5U125S2PN1FA with 5 green LED means 5 indoor units. If one LED keep lighting that means the corresponding indoor unit has good communication with outdoor unit. If one LED is not lighting, that means there is no communication between indoor and outdoor.unit has good commmunication with outdoor unit. If one LED is not lighting, that means there is no communication between indoor and outdoor.
29
Trouble shooting
Possible reasons
Outdoor LED Wired Cassette and convertible
display
controller indoor display outdoor error
display code use the timer and runing
lamp
Faulty of outdoor unit EEPROM
1
IPM overcurrent or short circuit
2
Communication failure between Module and ECU
4
Timer lamp Running lamp
flash time flash time
15
2
1
16
2
2
18
2
4
Module operated overload
5
19
2
5
Module low or high voltage
6
1A
2
6
Discharging temperature overheating.Lack of refrigerant, 8
1C
2
8
ambient temperature too high or PMVs blocked.
Malfunction of the DC fan motor
9
1D
2
9
Malfunction of defrosting temp. sensor
10
1E
3
0
Malfunction of compressor suction temp. sensor
11
1F
3
1
Malfunction of ambient temp. sensor
12
20
3
2
Malfunction of compressor discharge temp. sensor
13
21
3
3
Communication failure between indoor&outdoor unit
15
23
3
5
Lack of refrigerant or discharging pipe blocked
16
36
3
6
4-way valve switching failure
17
25
3
7
Loss of synchronism detection
18
26
3
8
Indoor thermal overload
20
28
4
0
Indoor frosted
21
29
4
1
Module thermal overload
23
2B
4
3
Compressor start failure
24
2C
4
4
Module input overcurrent
25
2D
4
5
MCU reset
26
2E
4
6
Module input current detect circuit malfunction
27
2F
4
7
Malfunction of liquid pipe temp. sensor for indoor unit A 28
30
4
8
Malfunction of liquid pipe temp. sensor for indoor unit B 29
31
4
9
Malfunction of liquid pipe temp. sensor for indoor unit C 30
32
5
0
Malfunction of liquid pipe temp. sensor for indoor unit D 31
33
5
1
Malfunction of gas pipe temp. sensor for indoor unit A 32
34
5
2
Malfunction of gas pipe temp. sensor for indoor unit B 33
35
5
3
Malfunction of gas pipe temp. sensor for indoor unit C 34
36
5
4
Malfunction of gas pipe temp. sensor for indoor unit D 35
37
5
5
Malfunction of gas pipe temp. sensor for indoor unit E 36
38
5
6
Malfunction of module temp.sensor Momentary power failure detection
38
3A
5
8
Malfunction of condensing temp. sensor
39
3B
5
9
Malfunction of liquid pipe temp. sensor for indoor unit E 40
3C
6
0
System high pressure switch off
42
3E
6
2
System low pressure switch off
43
3F
6
3
System high pressure protection.Refrigerant
44
40
6
4
overabundance,High condensing temp. or
malfunction of fan motor.
System low pressure protection.Refrigerant shortage, 45
41
6
5
Low defrosting temp., or malfunction of fan motor.
30
Address:Haier Industrial Park,Qianwangang Road,Eco-Tech Development Zone,Qingdao 266555,Shandong,P.R.C. Contacts: TEL +86-532-88936943; FAX +86-532-8893-6999 Website: www.haier.com
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>