ZIPPITY HIGHLAND VINYL PRIVACY LATTICE SCREEN Instruction Manual
- June 7, 2024
- ZIPPITY
Table of Contents
ASSEMBLY
INSTRUCTIONS
ZP19047
HIGHLAND
VINYL PRIVACY
LATTICE SCREEN
2-PACK
(36” W X 57” H)
60 MIN
Approximate assembly time
Want to see a video on how to
assemble this product?
Scan the QR code
http://zippity-outdoor.com/QR/ZP19047
GENERAL INFORMATION
IMPORTANT
- Check the inside of the larger pieces in your box for other materials packed inside.
- When assembling components, place on a non-abrasive surface (i.e. shipping box) to avoid scratching.
- We recommend an area approximately 5’x 8’ for unobstructed assembling.
- You should not need to use excessive force when assembling components.
MISSING OR DAMAGED PARTS?
VISIT OUR WEBSITE FIRST, SO WE CAN HELP YOU RIGHT AWAY!
Although great care has been taken to ensure proper packaging and handling of
this product, occasionally problems occur. If you discover any missing,
damaged or defective parts, please visit our website to order replacement
parts. If you experience any further trouble with your product, please contact
our customer
service department.
parts.nychbrands.com
support@zippity-outdoor.com
704-892-5222 /
877-234-6196
Customer service agents are available to take calls on weekdays from 8am5pm
EST.
If you call outside of business hours, please leave a voicemail.
To help you quickly and accurately, please have a reference item number ZP19047 and the specific part name which can be found on page 4. It is helpful if you can provide the batch lot which is a the stamped number on the end of the box.
NEED ASSEMBLY HELP?
If you are having problems with the assembly or installation of this product, we are happy to assist you with the process, so please give us a call at 7 04-892-5222 /877-234-6196.
NEED TO RETURN?
If for some reason you need to return this product, please allow us to help resolve your issues first. If you still decide to return the product, you will need to initiate the return from the company you originally purchased from.
Detailed Product Dimensions & Specifications
STEP 1: LAYOUT MATERIALS
STEP 2: ASSEMBLE THE PICKET GRID
STEP 2.1
- Take (10) vertical pickets (C) , and arrange them as shown.
Note: Make sure the routed holes for each vertical picket line up.
STEP 2.2
- Insert (14) horizontal pickets (E) through the routed holes in the vertical pickets.
Note: It may take some light force to insert horizontal pickets through the routed holes.
STEP 3: ATTACH THE POSTS
STEP 3.1
- Starting with one post (D), slowly slide the horizontal pickets, one by one, into the routed holes in the post. Do the same for the second post, ensuring that the tabs of the posts are at the same end of the screen as shown.
Note: The end of the post with the plastic tab will be at the top of the screen.
STEP 4: ATTACH THE RAILS
STEP 4.1
- Take (2) loose rail end caps (G) and pressure fit one rail end cap to the end of each of the two horizontal rails (F).
STEP 4.2
- Ensuring the routed holes are facing up, slide one rail over the bottom of the posts. Slide the rail up and guide the vertical pickets into the routed holes. Continue sliding the rail up until the pre-drilled holes in the rail and posts align.
STEP 4.3
- Slide the Post Anchors (B) into the bottom of the post. 16″ of post anchor should be visible.
- Use the 1/8″ Drill Bit (K) to drill (4) total holes in the post anchor through the pre-drilled holes in the bottom rail.
- Drive (4) 3/4″ Self-Drilling Stainless Steel Screws (H) into the pre-drilled holes in the horizontal rail.
STEP 4.4
- Ensuring the routed holes are facing down, slide the other horizontal rail over the top of the posts.
Continue sliding the rail down, inserting each vertical picket into the routed holes in the top rail, until the pre-drilled holes in the top rail and posts align. Drive (4) ¾” self-drilling stainless steel screws into the pre-drilled holes.
STEP 5: INSTALL THE SCREENS
STEP 5.1
- Repeat Steps 2-4 to assemble the second screen.
STEP 5.2
- Move the screen to its final location, and identify where the posts will be located. Attempt to push the unit into the ground as illustrated. All 16” of the post
anchors should be inserted into the ground, so they are no longer visible.
Optionally:
- If your ground is too hard, loosen the top 6” or 7” of the ground with a claw hammer as illustrated.
- Add water to the loosened soil.
- Use a block of wood to protect the top of the post, and gently hammer the post into the ground.
STEP 5.3
- Level the screen as necessary, backfill excavated dirt, and tamp down.
STEP 5.4
Optional:
If your ground is very hard, you may need to dig a single hole large enough to
accommodate one post from each panel. This hole should be approximately 8” in
diameter and 16” deep. Backfill and tamp the dirt.
STEP 6: FASTEN JOINER CLIPS
STEP 6.1
- Fasten the screens together with (2) joiner clips (J) using (4) 1” self-drilling stainless steel screws (I).
STEP 7: INSTALL POST CAPS
STEP 7.1
- Push the post caps (A) down over the posts to lock into place.
6935 Reames Rd. Ste. K.
Charlotte, NC 28216
support@zippity-outdoor.com
704-892-5222
877-234-6196
WWW.ZIPPITY-OUTDOOR.COM
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>