Bard QPBX36-9-4 Top Fill Kits Conjunction with Plenum Box Instructions

June 6, 2024
Bard

Bard - logo Climate Control Solutions

SUPPLEMENTAL INSTRUCTIONS

Top Fill
Models:

QPBX36-9-4
QPBX36-9-V
QPBX36-9-X| QPBX36-10-4
QPBX36-10-V
QPBX36-10-X| QPBX49-9-4
QPBX49-9-V
QPBX49-9-X| QPBX49-10-4
QPBX49-10-V
QPBX49-10-X
---|---|---|---

Application

Top-fill kits can be used in conjunction with a plenum box or cabinet extension options. There are separate kits for 9′ 6″ and 10′ 2″ ceiling heights. See Table 1 for maximum ceiling heights.

TABLE 1

Top Fill Plenum Box/Cabinet Extension Max Ceiling Height
QPBX36-9 QPB36 or QPBS36 9′ 6″
QPBX36-9 Q4CX10A 10′ 2″
QPBX49-9 QPB49 or QPBS49 9′ 6″
QPBX49-9 Q4CX15A 10′ 2″
QPBX36-10 QPB36 or QPBS36 10′ 2″
QPBX49-10 QPB49 or QPBS49 10′ 2″

Installation

After the plenum box or cabinet, the extension has been properly attached to the Q-TECT™ unit, place side angles against the side of the cabinet extension or plenum and slide it up to the ceiling. Make sure the angles are centered side to side. Mark the holes to be drilled. Drill a 1/8″ diameter hole in the center of each mark. Reposition the angles and attach with screws provided.

Place the front angle against the front of the cabinet extension or plenum box and slide it up to the ceiling. Make sure the angle is centered side to side. Mark the holes to be drilled. Drill a 1/8″ diameter hole in the center of each mark. Reposition the angle and attach to the screws provided.
Some trimming to fit around the grille opening may be required. Grille flanges cover trimmed area.

FIGURE 1

Bard QPBX36 9 4 Top Fill Kits Conjunction with Plenum
Box

Bard Manufacturing Company, Inc.Bryan, Ohio 43506
www.bardhvac.com

Manual: 7960-873A
Supersedes: 7960-873
Date: 11-10-20

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals