G21 GAH 884 Steel Base Floor Construction or Structure Instruction Manual
- June 5, 2024
- G21
Table of Contents
G21 GAH 884 Steel Base Floor Construction or Structure Instruction Manual
Introduction
Thank you for purchasing our product.
Before use, please read these instructions carefully.
Name | Qty |
---|---|
V-A1 | 8 |
V-A3 | 6 |
24 |
Installation
Kit before you begin
-
1. Before beginning construction, check local building codes regarding footings, location and
other requirements.
2. Follow all directions and dimensions carefully.
3. Follow the step sequence carefully for correct results.
4. Be sure all the parts fit together properly before proceeding.
5. SAFETY FIRST: Care must be taken when handling various pieces of your kit because some
contain sharp edges. Wear work gloves, eye protection and long sleeves when assembling or performing any maintenance on your kit.
6. BASIC TOOLS: Screwdriver, pliers, work gloves, tape measure, level and a spade or shovel.
7. GROUND MUST BE LEVEL: Be sure floor frames lie flat on ground. To prepare construction, remove sod and other bumpiness. Level the high spots with flat shovel and tamp construction down. -
Separate contents of the carton by the part number while reviewing parts list. Check to be sure that you have all the necessary parts for your kit.
CORRECT
INCORRECT
The English version of the manual is an exact translation of the original manufacturer‘s instructions. Images used in this manual are for illustrational purposes only and may differ from the actual product.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>