1. DIMENSIONS :

Highest position

diagram

Lowest position

lowest position

Edited by : S. Vranken
Checked by : N. Volders
Approved by : G. Van Erum

Drilling diagrame

fig. 3 (concrete or masonry)

diagram parts

fig. 4 (light construction walls)

diagram wall

Picture 3 and 4 shows the drilling diagram me, drill and screw only on marked points.
The minimum clearance to ceiling is 40 mm.
Note: part 5.2 is NOT included = to be ordered separately !!!

Edited by : S. Vranken
Checked by : N. Volders
Approved by : G. Van Erum

2. INSTALLATIONS :

Columns and sliding system

fig. 5 (concrete or masonry)

minumum clearance
to ceiling is 40 mm

– Mark drill holes, drill and install dowels 1050 (5.3) in correct position (fig. 3).
– Fix the mounting brackets (5.1) with hex screws 8
80 (5.4).

or

Contruction wall

minumum clearance
to ceiling is 40 mm

– Place mounting bar (5.2) in correct position (fig. 4), mark drill holes, drill and install
special dowels (for light construction walls).
– Fix the mounting bar (5.2) with special screws (for light construction walls).
– Cover up the special screws.

Edited by : S. Vranken
Checked by : N. Volders
Approved by : G. Van Erum

fig. 6

note !!!

make sure that the right board
carrier and right floor plate accords
to the right column and
left to left.

floor plate

– Lay the column (6.1) on the floor as shown (fig6).
– Stick the self-adhesive strips of felt (6.2) around the counterweight (6.3).
– Attach the cable end (6.4) to the counterweight (6.3).
– Push the counterweight (6.3) by means of a rod or a bar +- 400mm into the column (6.1).
– Slip the cable (6.4) through the pulley (6.5) and place the second stop spring (6.6) around the cable (6.4).
– Slide the rolls of the board carrier (6.7) partially into the guide of the column (6.1).
– Slip the cable (6.4) around the pully of the board carrier (6.7) and slide it further into the column (6.1).
– Adjust the pulley (6.5) into the column top (6.1).
– Attach the other end of the cable (6.4) to the cable holder (6.8).
– Adjust the cable holder (6.8) into the column top (6.1).
– Insert the floorplate (7.1) into the Bottum of the column (6.1).
– After the assembly , correct the column (6.1) carefully.

Attention !!!
The counterweight slides downwards and the board carrier upwards.

Edited by : S. Vranken
Checked by : N. Volders
Approved by : G. Van Erum

– Push the column assembly (fig.6) to the mounting bracket (5.1) or
mounting bar (5.2).
– Adjust the columns to a vertical position and parallel to each
other, drill ( 4,5) and fix with hex tapping screw 5,525 (7.2).
– Fasten the floor plate (7.1) to the floor by means of screws 6
50
(7.3) and dowels S8 (7.4), after drilling the holes.
– Drill a hole ø6,5 (7.5) at 450mm + length of counterweight from
top of the column.
– Pull the board carrier (6.7) downwards.
– Secure the counterweight (6.3) against sliding downwards by
pushing a screw M6*40 or equivalent (7.5) into the hole
of the column.

Attention !!!
It is verry important to take care of a perfect vertical and parallel
position of the columns.

Edited by : S. Vranken
Checked by : N. Volders
Approved by : G. Van Erum

parts

– Place the support structure (8.1) horizontally between the columns (6.1) and attach it at the back of the board carries with Allen screws M8*25 (8.2) and toothed washers M8 (8.3).

Edited by : S. Vranken
Checked by : N. Volders
Approved by : G. Van Erum

Display

fig. 9

– Attach the 2 display supports (9.1) at the back of the display with Allen screws M8*30 button head (9.2).

Edited by : S. Vranken
Checked by : N. Volders
Approved by : G. Van Erum

vanerum company

– Place the prepared display on the support structure (8.1) and secure the installation with blocking plates (10.1) and Allen screws M8*25 (8.2).

Attention !!!

Deblock the counterweight (6.3) in the colums (6.1) by removing the screw M6*40 or equivalent (7.5) and check the vertical sliding motion of the display, counterbalance if necessary, to do so, place the concrete block(s) (10.2) in the back of the support structure (8.1).

Edited by : S. Vranken
Checked by : N. Volders
Approved by : G. Van Erum

chain

– Place the display in its highest position.
– Place the E-chain holder (11.1) into the right side of the support structure (8.1) and align with the Bottum of the display, when aligned fix with Allen screws (11.2).
– Place the E-chain fixed holder (11.3) horizontally with the E-chain holder (11.1) and mark the drill holes.
– Drill 2 holes ø4mm in the column (6.1) and tap them to tread M5.
– Attach the E-chain fixed holder (11.3) with Allen screws (11.4).
– Place the cables in the chain (11.5) and click it into its ends. E-Chain (option)

Edited by : S. Vranken
Checked by : N. Volders
Approved by : G. Van Erum

3. PART LIST :
concrete or masonry wall
– mounting bracket (5.1) 2 each
– dowel 1050 (5.3) 4 each
– hex screw 8
80 (5.4) 4 each
– column, right (6.1) 1 each
– column, left (6.1) 1 each
– self -adhesive strips of felt (6.2) 4 each
– counter weigt (6.3) 2 each
– cable with stop springs (6.4) 2 each
– pulley (6.5) 2 each
– stop spring (6.6) 2 each
– board carrier, right (6.7) 1 each
– board carrier, left (6.7) 1 each
– cable holder, right (6.8) 1 each
– cable holder, left (6.8) 1 each
– floor plate, right (7.1) 1 each
– floor plate, left (7.1) 1 each
– hex tapping screw 5,525 (7.2) 4 each
– screw 6
50 (7.3) 4 each
– dowel S8 (7.4) 4 each
– screw M640 or equivalent (7.5) 2 each
– support structure (8.1) 1 each
– Allen screw M8
25 (8.2) 6 each
– toothed washer M8 (8.3) 4 each
– display support (9.1) 2 each
– Allen screw M8*30 button head (9.2) 4 each
– blocking plate (10.1) 2 each
– concrete block (10.2) 4 each

light construction wall
– mounting bar (5.2) 1 each
– special dowel 7 each
– special screw 7 each
– cover up cap 5 each
– column, right (6.1) 1 each
– column, left (6.1) 1 each
– self -adhesive strips of felt (6.2) 4 each
– counter weight (6.3) 2 each
– cable with stop springs (6.4) 2 each
– pulley (6.5) 2 each
– stop spring (6.6) 2 each
– board carrier, right (6.7) 1 each
– board carrier, left (6.7) 1 each
– cable holder, right (6.8) 1 each
– cable holder, left (6.8) 1 each
– floor plate, right (7.1) 1 each
– floor plate, left (7.1) 1 each
– hex tapping screw 5,525 (7.2) 4 each
– screw 6
50 (7.3) 4 each
– dowel S8 (7.4) 4 each
– screw M640 or equivalent (7.5) 2 each
– support structure (8.1) 1 each
– Allen screw M8
25 (8.2) 6 each
– toothed washer M8 (8.3) 4 each
– display support (9.1) 2 each
– Allen screw M8*30 button head (9.2) 4 each
– blocking plate (10.1) 2 each
– concrete block (10.2) 4 each

Edited by : S. Vranken
Checked by : N. Volders
Approved by : G. Van Erum

E-chain (option)
– E-chain holder (11.1) 1 each
– Allen screw M820 (11.2) 2 each
– E-chain fixed holder (11.3) 1 each
– Allen screw M5
12 (11.4) 2 each
– E-chain (11.5) 1 each

Edited by : S. Vranken
Checked by : N. Volders
Approved by : G. Van Erum

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals