DECKED 9989 Battle Mat Installation Guide

June 5, 2024
DECKED

DECKED 9989 Battle Mat

DECKED-9989-Battle-Mat-
PRODUCT

TOOLS NEEDED

  • UTILITY KNIFE
  • STRAIGHT EDGE

NOTE:
NO FASTENERS NEEDED. THE 1.25″ SCREWS INCLUDED ARE TO BE USED FOR INSTALLING CORE TRAX ON TOP OF THE BED MAT. SAVE THESE FOR FUTURE USE.

INSTALLATION

STEP 1: CONFIRM BED LENGTH

  • If you have a 6’4″ – 6’9″ bed, there is no need to trim the Battle Mat.
  • Simply place the mat on top of your DECKED drawer system, center it, and keep on truckin’. DECKED-9989-Battle-Mat-FIG-1

THESE MIGHT BE USEFUL:
Watch installation videos at www.DECKED.com/video

STEP 2:  TRIM BED MAT FOR SHORT BEDS

  • The Bed Mat will need to be trimmed for 5’5″ – 5’9″ beds.
  • Locate the recessed cutting lines marked on the tailgate end of the Battle Mat.
  • Use a SHARP utility knife.
  • Don’t be a hero – use at least three gentle but firm passes to cut through the Battle Mat – see detail in red below.
  • No waste! You can use the trimmed-off piece as a drawer liner.  DECKED-9989-Battle-Mat-FIG-2

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

DECKED User Manuals

Related Manuals