SWL ES2012 Electric Strike Fail Safe Secure Instruction Manual
- June 1, 2024
- SWL
Table of Contents
SWL ES2012 Electric Strike Fail Safe Secure
DOOR LATCH POSITION
As drawn above, there should be 1 mm gap between the door latch and the front face of strike keeper to prevent the door from exerting pressure on the keeper when the door is closed.
MOUNTING STEPS OF STRIKE
- For aluminum or metal door frame brackets are supplied for assembly, refer to Figure 2. For timber door frame refer to Fig. 3. mark and drill the hole sizes as indicated on Figure 2 and Figure 3.
- Make sure electrical connections are followed correctly.
- When the door is closed, ensure that there is no pressure on the front face of strike keeper.
- When all the above checks are completed, secure the strike with supplied screws and recheck operation.
POWER INPUT 12VDC or 24VDC WIRINGS
Note: There is no polarity on power input.
INSTALL ON METAL OR ALUMINUM DOOR FRAME
INSTALL ON WOODEN DOOR FRAME
POWER TO LOCK (PTL) <=> POWER TO OPEN (PTO) CONVERSION
WARNING: Do not press on the keeper to release when the spring screw is not totally secured into position, as to prevent damaging the spring barbell.
Procedures to convert Fail Secure (Figure 4A) to Fail Safe (Figure 4B):
Step 1 : Remove the spring screw from the end part of the strike body.
Step 2 : Remove the Barbell to reverse in position with long part inside
and short part out.
Step 3 : Replace the spring screw.
Procedures to convert Fail Safe (Figure 4B) to Fail Secure (Figure 4A):
Step 1 : Remove the spring screw from the end part of the strike body.
Step 2 : Remove the Barbell to reverse in position with short part inside
and Jon~ part out.
Step 3 : Replace the spring screw.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>