RUTLAND COUNTY GARDEN FURNITURE B0CN9GVL8T 3.5m x 4.34m Polycarbonate Car Port 2 Post Instruction Manual

June 1, 2024
Rutland County Garden FURNITURE

RUTLAND COUNTY GARDEN FURNITURE B0CN9GVL8T 3.5m x 4.34m Polycarbonate Car

Port 2 Post

RUTLAND-COUNTY-GARDEN-FURNITURE-B0CN9GVL8T-3-5m-x-4-34m-Polycarbonate-Car-
Port-2-Post-product-image

Specifications :

  • Product: Carport
  • Manufacturer: Rutland County Garden Furniture Ltd

Product Usage Instructions

Assembly Instructions:

  • Before commencing the assembly process, make sure to read the instructions thoroughly to familiarize yourself with the process and verify all components.
  • Assembly should be done on a flat, level surface with at least 2 adults assisting for safety.
  • Tools required: 10mm socket, No. 2 Pozidriv screwdriver (or electric driver), step ladder or platform.

Component List:

  • 40mm woodscrews
  • 60mm woodscrews
  • 50mm coachscrews
  • 100mm coachscrews
  • 120mm coachscrews
  • 60mm Roofing screws
  • 5mm Drill bit (x1)
  • Glazing bar
  • Glazing bar capping
  • Glazing bar end cap
  • Panel closure strip
  • Roof panel
  • Wall plate
  • Runner
  • Rafter
  • Brace
  • End brace
  • End cover
  • Fascia
  • Posts

Panel and Glazing Bar Preparation:
Prior to assembly, pre-drill outer panel edges and glazing bars based on the specified hole spacings in the provided table.

Panel Length Table:

Panel Length| Holes per Panel/Bar| Hole Spacing| Wall Plate Height – Top Edge*| Post Distance from Wall| Top of Post to Top of Wall Plate
---|---|---|---|---|---

Glazing Bars:
Refer to the figures provided for proper placement and installation of polycarbonate panels and glazing bars.

FAQ:

  • Q: What should I do if I encounter missing components during assembly?
    A: In case of missing components, please contact our customer support at the details provided in the manual for assistance.

  • Q: Can the carport be disassembled and reassembled?
    A: Yes, the carport can be disassembled and reassembled if needed. Follow the reverse steps of the assembly instructions.

Assembly Instructions
Polycarbonate Car Port – 2 Post

  • Before you commence the assembly process, we recommend that you read these instructions thoroughly beforehand to familiarise yourself with the assembly process and to also check that you have the correct components. If for any reason you need assistance, you can find our contact details on the final page of these instructions.
  • We strongly recommend that any assembly is carried out on an open flat, level surface if possible and with sufficient space. You will also require the assistance of at least 2 adults to complete assembly safely.

Tools required: 10mm socket, No2 Pozidriv screwdriver (or electric driver), step ladder or platform.

RUTLAND-COUNTY-GARDEN-FURNITURE-B0CN9GVL8T-3-5m-x-4-34m-Polycarbonate-Car-
Port-2-Post-fig- \(1\)

Product Specification Table

Please use the table below in conjunction with the Components list on page 3 to check you have the correct parts before commencing assembly of your carport.

| 2 x 2.9M| 2 x 3.6M| 2 x 4.3M| 2.5 x 2.9M| 2.5 x 3.6M| 2.5 x 4.3M| 3 x 2.9M| 3 x 3.6M| 3 x 4.3M| 3.5 x 2.9M| 3.5 x 3.6M| 3.5 x 4.3M| 4.5 x 2.9M| 4.5 x 3.6M| 4.5 x 4.3M
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---
40mm Screw| 8| 8| 8| 10| 10| 10| 12| 12| 12| 12| 12| 12| 16| 16| 16
60mm Screw| 58| 64| 70| 61| 68| 75| 64| 72| 80| 64| 72| 80| 70| 80| 90
50mm Coachscrew| 4| 4| 4| 4| 4| 4| 4| 4| 4| 4| 4| 4| 4| 4| 4
100mm Coachscrew| 6| 6| 6| 6| 6| 6| 6| 6| 6| 6| 6| 6| 6| 6| 6
120mm Coachscrew| 10| 12| 14| 10| 12| 14| 10| 12| 14| 10| 12| 14| 10| 12| 14
60mm Roofing Screw| 8| 8| 8| 10| 10| 10| 12| 12| 12| 12| 12| 12| 16| 16| 16
Roof panel| 4| 5| 6| 4| 5| 6| 4| 5| 6| 4| 5| 6| 4| 5| 6
Glazing bar| 3| 4| 5| 3| 4| 5| 3| 4| 5| 3| 4| 5| 3| 4| 5
Glazing bar capping| 3| 4| 5| 3| 4| 5| 3| 4| 5| 3| 4| 5| 3| 4| 5
Glazing bar end cap| 3| 4| 5| 3| 4| 5| 3| 4| 5| 3| 4| 5| 3| 4| 5
Panel closure strip| 4| 5| 6| 4| 5| 6| 4| 5| 6| 4| 5| 6| 4| 5| 6
Posts| 2| 2| 2| 2| 2| 2| 2| 2| 2| 2| 2| 2| 2| 2| 2
Wall plate| 1| 1| 1| 1| 1| 1| 1| 1| 1| 1| 1| 1| 1| 1| 1
Runner| 1| 1| 1| 1| 1| 1| 1| 1| 1| 1| 1| 1| 1| 1| 1
Rafter| 5| 6| 7| 5| 6| 7| 5| 6| 7| 5| 6| 7| 5| 6| 7
Brace| 2| 2| 2| 2| 2| 2| 2| 2| 2| 2| 2| 2| 2| 2| 2
End brace| 2| 2| 2| 2| 2| 2| 2| 2| 2| 2| 2| 2| 2| 2| 2
End panel| 2| 2| 2| 2| 2| 2| 2| 2| 2| 2| 2| 2| 2| 2| 2
Fascia| 1| 1| 1| 1| 1| 1| 1| 1| 1| 1| 1| 1| 1| 1| 1
Cladding| 8| 8| 8| 8| 8| 8| 8| 8| 8| 8| 8| 8| 8| 8| 8

Component list

The Product Specification table on page 2 will contain quantities for the components shown below. RUTLAND-COUNTY-GARDEN-FURNITURE-B0CN9GVL8T-3-5m-x-4
-34m-Polycarbonate-Car-Port-2-Post-fig- \(2\) RUTLAND-COUNTY-GARDEN-
FURNITURE-B0CN9GVL8T-3-5m-x-4-34m-Polycarbonate-Car-Port-2-Post-fig-
\(3\)

Panel and glazing bar preparation

Before commencing assembly, the outer panel edges and glazing bars will need to be pre-drilled as per the following instructions using the spacings indicated in the table below.

Panel length table

| ****

2M

| | Panel length|
---|---|---|---|---
2.5M| 3M| 3.5M| 4M| 4.5M
Holes per panel/bar| 4| 5| 6| 6| 7| 8
Hole spacing| 600| 575| 560| 660| 633| 614
Wall plate height – top edge*| 2556| 2643| 2730| 2817| 2873| 2990
Post distance from wall| 1764| 2256| 2748| 3240| 3733| 4225
Top of post to Top of wall plate| 310| 397| 484| 571| 658| 755

  • The “Wall plate height – top edge” is a recommendation based upon a default post height of 2240mm. If either the wall plate height or post height is to be  adjusted, please use the “Top of post to Top of wall plate”, dimension A in the figure below, to calculate the new Wall plate and post heights. RUTLAND-COUNTY-GARDEN-FURNITURE-B0CN9GVL8T-3-5m-x-4-34m-Polycarbonate-Car-Port-2-Post-fig- \(4\)

Glazing bars

Measure 100mm from either end of the glazing bar (fig.1) and using the 5mm drill bit supplied, drill the first hole by using the central groove in the base of the glazing bar as a guide and drilling through as shown (fig. 2). Using the Panel length table, now measure along the glazing bar the appropriate length from the centre point of the first hole and continue to add the remaining holes in the glazing bar in this manner. The final hole should be approximately 100mm from the opposing end of the glazing bar. Take the supplied rubber gasket and tear it half lengthways to create the 2 mouldings required for the glazing bars and slide them into the slots on either side of the glazing bar, pulling them down its entire length (fig3). RUTLAND-COUNTY-
GARDEN-FURNITURE-B0CN9GVL8T-3-5m-x-4-34m-Polycarbonate-Car-Port-2-Post-fig-
\(5\)

Polycarbonate panels

Two of the roof panels will be fitted as a “mirror” pair with holes down one edge to allow them to be fixed to the outer rafters. Lay out 2 panels with the UV coated side uppermost and the aluminium tape on both panels at the same end (fig. 1). Start by placing a piece of scrap timber under the area to be drilled. Now drill the first hole 100mm from either end of one the panels and 17mm from the edge (fig.2) using the 5mm drill bit supplied. Using the Panel length table (page 4), now measure along the panel the appropriate length from the centre point of the first hole, move the scrap timber into position and continue to add the remaining holes, 17mm from the edge of the panel as before. The final hole should be approximately 100mm from the opposing end of the panel. Repeat the drilling process for the second panel, this time drilling the opposing edge as shown (fig 1). We recommend any protective film is not removed until you are ready to install the panel.
RUTLAND-COUNTY-GARDEN-FURNITURE-B0CN9GVL8T-3-5m-x-4-34m-Polycarbonate-Car-
Port-2-Post-fig- \(6\)

Assembly Instructions

  1. Begin by taking the wall plate and placing it horizontally (use a spirit level or laser) on the wall where you would like the car port located. Check the Panel length table (page 4) to establish the distance from TOP of the wall plates to the floor. Mark the hole positions for your wall fixings then drill and fix them into place.
  2. Place one of the posts on a flat surface as shown and then insert one of the runners into the post slot, using the markings on the runner as a guide. Fix into place with 2 x 60mm woodscrews. RUTLAND-COUNTY-GARDEN-FURNITURE-B0CN9GVL8T-3-5m-x-4-34m-Polycarbonate-Car-Port-2-Post-fig- \(7\)
  3. Align the brace with the underside of the runner and centrally across the inside face of the post as shown. The mating faces should be flat against each other before fixing the brace into place with a 100mm coach crew at each end. Repeat steps 2 and 3 and attach the remaining post and brace to the other end of the runner to form a “goal post” structure.
  4. Using your assistants, manoeuvres the previously assembled “goalpost” into place. Position it adjacent to the wall plate and consult the Panel length table (page 4) to correctly distance the post from the wall. RUTLAND-COUNTY-GARDEN-FURNITURE-B0CN9GVL8T-3-5m-x-4-34m-Polycarbonate-Car-Port-2-Post-fig- \(8\)
  5. Now drop one of the raftkers into place…
  6. …butting it up against the outer face of the post before securing in place with a 120mm coachscrew driven down into the runner. RUTLAND-COUNTY-GARDEN-FURNITURE-B0CN9GVL8T-3-5m-x-4-34m-Polycarbonate-Car-Port-2-Post-fig- \(9\)
  7. Adjust the positioning of the “goalpost” if necessary, so that the notch in the underside of the wall end of the outer rafter sits snugly on the top of the wall plate and lines up with the markings indicating its correct position. Fix in place with a 120mm coach screw driven down into the wall plate.
  8. Add the second rafter to the other end of the structure, adjusting the position of the “goalpost” as necessary before fixing into place as before. RUTLAND-COUNTY-GARDEN-FURNITURE-B0CN9GVL8T-3-5m-x-4-34m-Polycarbonate-Car-Port-2-Post-fig- \(10\)
  9. Now add the intermediate rafters in the same way using the markings on the runner and wall plate to correctly align each one before fixing each end into place with a 120mm coach screw.
  10. Place the end brace against the inner face of the outer runner so that the lower face is butted against the inner face of the post and the top edge is approximately 10mm from the top edge of the rafter. Fix in place with 2 x 50mm coach screws into the rafter and 1 x 100mm coach screw into the post as shown. RUTLAND-COUNTY-GARDEN-FURNITURE-B0CN9GVL8T-3-5m-x-4-34m-Polycarbonate-Car-Port-2-Post-fig- \(11\)
  11. Starting from one end of the car port attach the previously drilled glazing bar so that it is centered on the first inner rafter and butted up to the wall as shown. Fix in place with 60mm screws.
  12. Position one of the drilled polycarbonate panels so that it sits on the glazing bar, aluminium tape at the wall, UV coated side up and the drilled edge flush with the outer rafter. Ensure the inner edge is parallel with glazing bar and adjust the “goalpost” laterally if necessary, before fixing the panel in place with 60mm roofing screws and then closing the cover caps. RUTLAND-COUNTY-GARDEN-FURNITURE-B0CN9GVL8T-3-5m-x-4-34m-Polycarbonate-Car-Port-2-Post-fig- \(12\)
  13. Add the next glazing bar as before, centered on the rafter and butted against the wall. Add an undrilled panel, aluminium tape at the wall and UV coated side up, adjacent to the last panel and use an assistant to support the lower panel edge whilst the glazing bar capping is snapped into place on the first glazing bar as shown.
  14. Continue adding further panels as you did in Step 13 and finish off with the other drilled panel, fixed in place with roofing screws as you did with the first panel in Step 12. RUTLAND-COUNTY-GARDEN-FURNITURE-B0CN9GVL8T-3-5m-x-4-34m-Polycarbonate-Car-Port-2-Post-fig- \(13\)
  15. Position the fascia so that its ends are flush with outer rafters and its top edge is just touching the underside of the glazing bars. Fix into place with a pair of 60mm screws into the rafter ends.
  16. Slot a panel closure strip onto the end of each panel and a glazing bar cap onto the end of each cap. RUTLAND-COUNTY-GARDEN-FURNITURE-B0CN9GVL8T-3-5m-x-4-34m-Polycarbonate-Car-Port-2-Post-fig- \(14\)
  17. Position the end cover so that its rear edge is butted against the wall and the top edge is 30mm above the roof panel…
  18. …and fix into place with 40mm screws spaced as per the Panel length table (page 4). RUTLAND-COUNTY-GARDEN-FURNITURE-B0CN9GVL8T-3-5m-x-4-34m-Polycarbonate-Car-Port-2-Post-fig- \(15\)
  19. Your Eternity car port is now complete.
  20. To attach cladding panels simply align as shown at the base of the post before screwing into place using 4 x 60mm woodscrews through the pre-drilled holes per panel. Repeat for each face of the post. RUTLAND-COUNTY-GARDEN-FURNITURE-B0CN9GVL8T-3-5m-x-4-34m-Polycarbonate-Car-Port-2-Post-fig- \(16\)

We hope that you found your product quick and easy to assemble but if not and you require any further assistance or have any questions you can contact us by telephone on: 01778 440803
Email: info@rutlandcountygardenfurniture.co.uk
www.rutlandcountygardenfurniture.co.uk

Rutland County Garden Furniture Ltd,
Ashbourne House, 2 Dovecote Meadows, Aslackby, Sleaford, Lincs, NG34 0HZ.
Company No: 7670072 VAT No: 151744027

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals