DFN-EM 1 LED Bathroom Mirror Instruction Manual

June 1, 2024
DFN-EM

DFN-EM 1 LED Bathroom Mirror

DFN-EM-1-LED-Bathroom-Mirror-product

Specifications

  • Model: V01-02-2024-DFN
  • Usage: LED Bathroom Mirror
  • Indoor use only
  • Power Supply: IEE Wiring Regulations compliant
  • Earthing system for electric shock protection
  • Connection Method: Wired installation

Product Usage Instructions

Installation Steps

  1. Ensure all electrical power is switched off.
  2. Connect the mirror to the main power supply using proper wire connectors.
  3. Installation must be done by a professional electrician.
  4. Follow the wiring diagram for input terminal connections.
  5. Use the installation tools provided for mounting on a wire buried wall type.

Operation Instructions

  1. Touch the Light Switch to turn on/off the LED light.
  2. Long press the light switch to change light color when LED light is on.
  3. Touch the demister button to activate/deactivate demister function.
  4. Set time by following the instructions for demister button long press.
  5. Switch between temperature and time display every 15 seconds.
  6. Activate Bluetooth function by touching the Bluetooth button and pairing with device.
  7. Automatic power off after 3 hours of standby to save energy.
  8. Device saves last settings when powered off.

Care & MaintenanceUse warm soapy water and a soft, damp, lint-free cloth to clean the mirror. Avoid harsh cleaners and abrasives. Regular cleaning is recommended to prevent limescale build-up in hard water areas. Use white vinegar for stubborn deposits. Ensure flexible wiring is securely fixed to avoid strangulation risk.

Frequently Asked Questions

  • Q: Can I install the LED Bathroom Mirror myself?
    • A: No, the installation must be done by a professional electrician to ensure safety and proper functioning.
  • Q: How do I change the light color on the mirror?
    • A: Long press the light switch button when the LED light is on to change the light color.
  • Q: How do I activate the demister function?
    • A: Simply touch the demister button to switch on or off the demister function.

Product Information

Notes: In order to use the product safely and properly, the mirror must be connected to the wires and the power supply that conform the IEE Wiring Regulations.Make sure all the electrical power has been completely switched off. Using a junction box or other proper wire connectors to connect wires accordingly to the main power supply; The installation must be executed by a professional electrician. The wrong installation may lead to product damage or / and personal injury.

This product is suitable for indoor use only.

Wiring diagram for input terminal

DFN-EM-1-LED-Bathroom-Mirror-fig \(1\)

Warning: The Earthing system is designed in this mirror and the earth wire needs be connected to protect you from an electric shock. If the external flexible cable or cord of this luminaire is damaged, it shall be exclusively replaced b y the manufacturer or his service agent or a similar qualified person in order to avoid a hazard.

Connection method

DFN-EM-1-LED-Bathroom-Mirror-fig
\(2\)

Installation Tools

Installation Tools (as shown below)DFN-EM-1-LED-Bathroom-Mirror-fig
\(3\)

Installation

DFN-EM-1-LED-Bathroom-Mirror-fig
\(4\) DFN-EM-1-LED-Bathroom-Mirror-fig
\(5\)

User Guide

When the mirror connected to the power successfully, the switch button will be light up blue. When the LED light switched on, the button turns to white.

  1. Touch the Light Switch to switch on the LED light, and touch again to switch off.
  2. hen the LED light is on, long hold the light switch button to change the light colour
  3. Touch the demister button to switch on the demister function.
  4. When the demister is on, long hold the demister button for 3 second until the minute number flashes, touch the light switch button to add minute. Touch the demister switch again to activate the hour setting, when the hour number starts to flash, touch the light button to add hour until the correct time is displayed. Touch the demister switch again or don’t touch any button for 6 seconds to finish the time setting.
  5. The screen display alternatively switches between the current temperature and time every 15 seconds.
  6. Touch the Bluetooth button to active the Bluetooth function. Turn on the Bluetooth function on your device and search for Q518 to pair.
  7. Energy Saving: Automatically powered o ffafter 3 hours of standby
  8. Memory: Save the last setting when powered off

Care & maintenance

NOTE: Use warm soapy water and a soft, damp, lint-free cloth toclean the mirror. Wipe it dry with another clean cloth. Glass cleaner can be used on the mirror surface when required. Avoid scourers, abrasives and chemical cleaners as they can damage the glass and the frame. IIn hard water areas, limescale may deposit on the glass. Regular cleaning will minimize this problem.If this build-up becomes increasingly difficult to remove, apply a small amount of white vinegar on the area. Do not attempt to cut the glass. Do not hit the glass with hard or sharp objectives. To reduce the risk of strangulation the flexible wiring connected to this luminaire shall be effectively fixed to the wall if the wiring is within arm’s reach For non-user replaceable light sources: The light source contained in this luminaire shall only be replaced by the manufacturer or his service agent or a similar qualified person. Shaver socket maximum current outlet: 0.5A Operating Frequency band: 2402-2480 MHz Maximum radio-frequency power transmitted: 2.8 dBm

EU/EC Declaration of Conformity (DoC)

We hereby declare that the below specified products or relevant parts thereof conform to the following Directives) and Requirements) :

  • Manufacturer’s name: EMKE GmbH
  • Manufacturer’s Address: Tichauer Weg 25, 40231 Düsseldorf, Germany

Declare under our sole responsibility that the product:

  • Product name: LED Bathroom Mirror
  • Trade name: EMKE
  • Type or model: OLM08BTDPM / OLM08CTDPM

Relevant supplementary information:

RED Directive (2014/53/EU):

  • HEALTH & SAFETY (Art. 3(1)(a)): EN 50663:2017,EN 62479:2010
  • EMC (Art. 3(1)(b)): EN 55032:2015+A11:2020+A1:2020,EN 55035:2017+A11:2020.
  • ETSI EN 301 489-1 V2. 2.3 (2019-11), ETSI EN 301 489-17 V3.2.4 (2020-09)
  • SPECTRUM (Art. 3(2)): ETSI EN 300 328 V2. 2. 2(2019-07)

EMC Directive (2014/30/EU):

  • EN55015:2019+A11:2020,EN61547:2009,EN61000-3-3:2013A1:2019+A2:2021, EN 61000-3-2:2019+A1:2021

LVD Directive (2014/35/EU):

  • EN 60598-1:2021+A11:2022, EN 60598-2-1:2021, EN62493:2015+A1:2022

RoHS Directive (2011/65/EU &EU 2015/863):

  • IEC 62321-1:2013,IEC 62321-2:2021,IEC 62321-3-1:2013,IEC 62321-4:2013+A1:2017,
  • IEC 62321-5:2013, IEC 62321-6:2015,IEC 62321-7-1:2015,IEC 62321-7-2:2017,IE 62321-8:2017

Ecodesign requirements for energy-related products (2009/125/EC)

  • (EU)2019/2020,(EU)2021/341,(EU)2019/2015,(EU)2021/340 Technical file held by: EMKE GmbH Tichauer Weg 25, 40231 Düsseldorf
  • Place and date of issue (of this DoC): 2022-04-06 Düsseldorf, GermanySigned by or for the manufacturer:
  • EMKE GmbH Person responsible for making this declaration name: YIN FAN

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals