AiRaider Radon Away 321 – 115V Water Removal System Instruction Manual
- June 1, 2024
- AiRaider
Table of Contents
- AiRaider Radon Away 321 – 115V Water Removal System
- Product Information
- Product Usage Instructions
- Water Flow Requirements
- FAQ
- Pre-Installation
- Installation Instructions
- RETESTING AND MAINTENANCE
- Maintenance
- TROUBLESHOOTING
- LIMITED WARRANTY
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
AiRaider Radon Away 321 – 115V Water Removal System
Product Information
Specifications:
- Product Name: AIRaiderTM
- Model: All Residential & Small System Models
- Instruction & Installation Manual: IN063 Rev.D 0120
Product Usage Instructions
Pre-Installation
WARNING: Failure to install and maintain the unit according to these instructions may result in personal injury or property damage.
The AIRaiderTM Systems are diffused bubble aeration systems for the removal of radon and other VOC’s from residential and municipal water supplies. This installation/operation manual is designed to guide professionals through the safe and proper installation of the AIRaiderTM Systems.
Safety Matters
Safety is the most important step in the installation process. Never perform any step of the installation that you are not qualified to perform (i.e. Electrical or plumbing hook up). It is important that you read through the entire manual prior to beginning the installation. When performing the installation, work slowly and deliberately. Follow all instructions carefully and never take shortcuts. Our team of technicians is available to answer your questions at 800-355-0901.
Water Flow Requirements
Household water use must be discontinued during the following flow rate test.
- Attach garden hose to the drain connection on the base of the Well Pressure Tank.
- Open the drain valve and run water for 15 minutes.
- After 15 minutes, check the pressure gauge on the well system. Adjust the drain valve (open or close) as needed to maintain the required running system pressure (constant pressure on gauge) with the well pump running continuously.
- Run for 5 minutes while ensuring that the pressure is not fluctuating.
- Run water from the hose into a five-gallon bucket. Using a stopwatch, time how many seconds it takes to fill the bucket (Z sec.).
- Determine the GPM by dividing 60 seconds by the number of seconds it took to fill the bucket (Z sec.). Multiply the answer by 5 gallons. This gives you the GPM. GPM = (60 / Z) x 5
FAQ
Q: What are the main considerations before installing the AIRaiderTM System?
A: The main considerations include safety, installation site requirements, inspection of system components, necessity for qualified technicians, and knowledge of all contaminants in the water.
Pre-Installation
WARNING: FAILURE TO INSTALL AND MAINTAIN THE UNIT ACCORDING TO THESE
INSTRUCTIONS MAY RESULT IN PERSONAL INJURY OR PROPERTY DAMAGE.
The AIRaiderTM Systems are diffused bubble aeration systems for the removal of
radon and other VOC’s from residential and municipal water supplies. This
installation/operation manual is designed to guide professionals through the
safe and proper installation of the AIRaiderTM Systems.
Before beginning the installation of the AIRaiderTM System, there are 5 items
to be considered.
They are:
- Safety
- Installation Site Requirements
- Inspection of System Components
- Necessity for Qualified Technicians
- Knowledge of all Contaminants in the Water
Safety Matters
Safety is the most important step in the installation process. Never perform
any step of the installation that you are not qualified to perform (i.e.
Electrical or plumbing hook up). It is important that you read through the
entire manual prior to beginning the installation. When performing the
installation, work slowly and deliberately. Follow all instructions carefully
and never take shortcuts. Our team of technicians is available to answer your
questions at 800-355-0901.
Water Flow Requirements
The standard residential AIRaiderTM Systems are designed for use with water
flows up to 20 gallons per minute (GPM). The system comes equipped with an
outflow ball valve. If higher/ lower system outflow is needed, open/close the
ball valve by the amount necessary to balance the system. The well pump output
must produce at least 1 GPM more than theoutput of the AIRaiderTM (i.e. well
output = 8 GPM ; AIRaiderTM outflow setting = 7 GPM) for proper system
performance. If the well pump output is less than the system output the
AIRaiderTM will run dry and possible damage may occur. To prevent this from
occuring the water flow rate must be determined before the system is
installed.
Some AIRaiderTM Systems are not recommended for high flow residential properties. All repressurization systems (except for the AIRaiderTM EZ95,433-S50 & 433-S50X) are sold separately. Proper repressurization system sizing is required to meet water flow needs. Consult manufacturer if assistance is needed for system selection.
In order to determine available water flow rate the following is needed:
-
Garden Hose
-
Five-Gallon Bucket
-
A Stop Watch or Watch with a Second Hand
Or -
A Water Flow Meter
Household water use must be discontinued during the following flow rate test.
Mid-Range Flow Rate Test:
- Attach garden hose to the drain connection on the base of the Well Pressure Tank.
- Open the drain valve and run water for 15 minutes.
- After 15 minutes, check the pressure gauge on the well system. Adjust the drain valve (open or close) as needed to maintain the required running system pressure (constant pressure on gauge) with the well pump running continuously.
- Run for 5 minutes while ensuring that the pressure is not fluctuating.
- Run water from the hose into a five gallon bucket. Using a stop watch, time how many seconds it takes to fill the bucket (Z sec.).
- Determine the GPM by dividing 60 seconds by the number of seconds it took to fill the bucket (Z sec.). Multiply the answer by 5 gallons. This gives you the GPM. GPM = ( 60 / Z ) x 5
- Repeat steps 5 and 6 and average the 2 numbers. The answer is the well pump output in gallons per minute. It is recommended that this number be indelibly recorded in an obvious location, together with the date of test, as it will be required when setting the AIRaiderTM System and may be required for future troubleshooting of the well pump system or the AIRaiderTM System.
Unpacking and Locating System Components
Unpack All System Components
Remove all packing material and discard appropriately away from the work area.
Locate All Components
Check to ensure all components are intact and included in shipment.(See Figure
5 and 8) Included component list (may vary with order):
-
Tank Assembly with Solenoid Assembly
-
Control Panel* and Float Switches
-
Submersible Pump**
-
Jet Pump and Bladder Tank Assembly***
-
Brass – Bypass Assembly, Pump Brass, and Tank Brass****
-
Installation Kit – Manual, Pressure Gauge, etc.
-
- Model 321 does not come equipped with a control panel
-
** Mounted internally on 433-S50 and 433-S75 Systems, not supplied with 433 and 321 Systems. *** Pump packages are sold separately on 321 and 433 Systems, and will vary with the order.
Bladder Tanks are sold separately. -
**** Sold separately on 321 and 433 Systems. Standard systems are equipped for a ¾” plumbing connection. 1” plumbing connection is available on 433 Systems only (Not 433 433-S50 or 433-S75). Please specify plumbing connection requirements when ordering. Bypass Assembly is integral on 433-S50 Systems Only.
Use Qualified Technicians
A Licensed Plumber, Electrician, Contractor and/or Certified Water Treatment
Specialist may be required to install the AIRaiderTM System in accordance with
the installation instructions. All wiring must be performed in accordance with
the National Fire Protection Association’s (NFPA)”National Electrical Code,
Standard #70”-current edition for all commercial and industrial work. All
wiring must be performed by a qualified and licensed electrician. Check your
Local and State Code and Licensing requirements. Failure to follow the
instructions may lead to poor system performance and/or possible system
damage.
The Installation must comply with all applicable Local and State Codes and
NFPA National Electrical Code, Standard #70!
Full Water Test
A full Water Sample Analysis must be performed to determine the quality of the
water that requires treatment. In many water supplies, contaminants other than
radon are present and may need to be pre-treated in order for the AIRaiderTM
to work properly. The AIRaiderTM System is only effective for the removal of
radon and some other VOC’s. The Aeration Process employed by the AIRaiderTM
System and other radon removal systems can worsen problems due to iron or
manganese contaminants in the water supply. For optimal removal of radon or
other VOC’s, other contaminants such as iron or manganese must be removed
before the water supply enters the AIRaiderTM System. Installation of a
sediment filter is highly recommended as a pre-treatment of the water supply.
The filter should be routinely cleaned or replaced.
FAILURE TO REMOVE OTHER CONTAMINANTS INCLUDING SEDIMENT CAN REDUCE SYSTEM EFFECTIVENESS AND MAY RESULT IN SYSTEM DAMAGE , COMPONENT MALFUNCTION, PROPERTY DAMAGE, AND PERSONAL INJURY.
Installation Instructions
OVERVIEW
Now you are ready to begin the installation process. The eight steps to
properly install the AIRaiderTM System are listed below. Read all components
of each step prior to beginning the actual installation.
- System Location
- Readying the System for Installation
- Plumbing Hook-up
- Electrical Hook-up
- Vent Line Installation
- Remote Air Intake Installation
- System Start-up
- System Check
- Install Overflow Protection and Alarm Prior to Use.
It is recommended that a Flood Stop (P/N 28276, sold separately) be installed prior to use of this system to provide point of leak detection, whereby a motorized ball valve will automatically shut off the system and prevent potential overflows should debris clog a shut-off valve. A basement water alarm also should be installed to warn residents of water tank overflows. SAFETY TIP: Do Not undertake any step for which you are Not Qualified.
(Repressurization Systems not shown, sold separately on 321, 433 and 433-1)
System Location
When selecting the location for the AIRaiderTM System, five factors should be
among those considered:
- System Plumbing Hook-up. Find a location that will minimize the amount of plumbing necessary, this is typically in proximity to the well tank.
- Electrical Hook-up. Keep in mind the need for accessibility to a 20 Amp dedicated 120VAC power supply or 30 Amp dedicated 230VAC for 230V 433 Systems.
- Exhaust Line Venting. The location of the system must allow for outside venting of the system exhaust above the eave of the structure. The manufacturer requires that the exhaust pipe pitch back toward the system (see Section 2.6).
- Remote Air Intake. If the system must be installed in an area with questionable air quality (i.e. furnace room, garage, crawl space) then ducting from the air intake to a remote location having good air quality may be required.
- System Must Be Level. The system should not be located on a significant slope as this may impede system performance.
Place the system in the location acceptable to customer that maximizes the
ease of installation.
All Local and State codes as well as any applicable AARST, EPA and/or State
Radon standards must be adhered to when locating the AIRaiderTM (i.e. away
from electrical panel, furnace, exits, etc.).
Readying the AIRaiderTM for Installation
For 433 and 321 systems (433 Illustrated). This section does not apply to
Systems with integral pumps (433-S50 & 433-S50X Systems).
-
If using the Grundfos MQ3-45 Pump attach mounting bracket to wall as shown in Fig. 3 (page 8). Note bracket hole height is specific to the Grundfos MQ3-45. If using a different pump adjust bracket height as required to place pump suction pipe centerline at the system outlet centerline as specified in Fig. 3.
Note: Short horizontal pipe run from system outlet to pump inlet is optimal. If this pump location is impractical because of space constraints the pump may be located remotely at a higher location, but pump lift, pipe diameter, and equivalent pipe length must comply with limits specified in the pump installation instructions.
Do not mount pump lower than shown as removal of the pump for service may result in tank contents siphoning out onto the floor! -
Install the Suction Check Valve provided with the Grundfos MQ3 Pump into the pump inlet as shown in the pump installation instructions. This will prevent loss of pump prime and possible interruptions in the water supply to the house. Remove the priming plug from the pump and add the specified volume (See Pump Installation Instructions) of water to the pump. Either re-install the priming plug or install a ⅜” NPT x 2” long pipe nipple and attach a ¼” NPT Pressure Gauge with with ¼” x ⅜” FNPT Reducer to the pipe nipple (Fig. 2).
-
Sit the pump onto the mounting bracket and connect pump inlet to system outlet. The system outlet is provided with a ¾” Sharkbite Connection suitable for ¾” Nominal Copper Tube or Pex Tube; insertion length into Sharkbite Fitting is 1”. Additional fittings will be required to connect the tube to the 1” MNPT threaded connection on the MQ3-45 Pump. Fittings required may vary with pump used. Cut the tubing to the length required to align the pump base with the mounting holes in the pump mounting bracket. Bolt the pump to the mounting bracket.
-
With the System located as desired, install the pipe/tube from the pump discharge to the desired location of supply to house. At the house end a tee is required to accommodate supply to house and to System Bypass Connection. Fittings will be required to connect to the 1” MNPT threaded connection on the MQ3-45 Pump. Fittings required may vary with pump used. The optional Bladder Tank has a ¾” MNPT threaded connection. A tee will be required if the bladder tank is installed, otherwise an elbow may be used at the same location. To facilitate removal of pump for service, a quick disconnect (sharkbite as illustrated, or pipe union) is recommended on the pump side of the required System Outlet Valve (normally open ball valve).
-
Install pipe/tube from System inlet (Fig. 2) to the desired location of the supply from the well tank. At the supply end a tee is required to accommodate supply from the well and the system bypass connection. The system inlet is provided with a ¾” Sharkbite Elbow suitable for ¾” Nominal Copper Tube or Pex Tube, insertion length into Sharkbite Fitting is 1”. A System Inlet Valve (normally open ball valve) is required between the tee and Sharkbite Elbow.
-
Install the pipe/tube between the tees at the desired locations of the supply to house and the supply from well. A System Bypass Valve (Normally Closed Ball Valve) is required between the tees.
Plumbing Hook-up
All Plumbing should be performed in accordance with Local and State Codes by a
Qualified Plumber.
-
Shut off the water main valve located after the pressure tank.
-
Drain the water line.
-
Plumb the system into the water line after the pressure tank and all other water treatment equipment.
-
Plumb the water line from the existing pressure tank into the Inlet Tee.
-
Plumb the water line to the house into the Outlet Tee (Fig. 2, 4 or 5 depending on System and Pump).
A flow restrictor or gate valve in the water line to the house is required for balancing the system flow. A Bladder Tank , minimum capacity 5 gallons is required for 433-S50 Systems (20gal. min. for 433-S50X).
WARNING: Bladder Tank must be supported by hanger attached to wall or joist. -
Making sure the Bypass valve is open and Inlet and Outlet Valves are closed, slowly open the water main valve and check for leaks.
-
Slowly change bypass to the “service” configuration, Bypass valve closed, inlet and outlet valves open. Prime jet pump as per Manufacturers Instructions (See enclosed Jet Pump Manual) if not previously primed. Note that integral pump on 433-S75 and 433-S50 systems will self prime when the system tank is filled.
Electrical Hook-up
All Electrical Work should be performed in accordance with Local and State
Codes, and NFPA National Electrical Code, Standard #70 by a Qualified and
Licensed Electrician .
WARNING: Never perform electrical work while standing in water.
Do not attempt wiring on a live circuit.
WARNING: Power Supply Voltage must match the voltage marked on the System
Nameplate. Improper wiring may result in system damage.
-
Turn main power switch, located on the AIRaiderTM, to the “Off” position.
-
Connect the Jet Pump power cord to the Jet Pump. (Does not Apply to 433-S50 or 433-S50X Systems, pump is factory connected) Note the Jet Pump power cord from the AIRaiderTM is provided with an electrical receptacle. The Jet Pump may be connected either by connecting a suitable power lead with plug and plugging into the receptacle or by removing the receptacle from the Jet Pump power cord and connecting the power cord directly to the pump. Follow wiring instructions located in the enclosed Jet Pump Manual.
Warning: Never remove the Receptacle from the Jet Pump Power Cord without connecting the wires thus exposed to the jet pump, inside the Jet Pump Electrical Enclosure. Always secure the Jet Pump Enclosure Cover after making electrical connections. -
On 433-S50X units only the installer may need to disconnect the Armored Cable supplied in order to install the Pressure Switch. The Armored Cable may require trimming to the desired length before reconnecting. Connect per the wiring diagram Figure 8 Page 14.
-
Make sure all connections in the control panel are tight.
-
Bring in power to the control panel using the hole provided, either an appropriate strain relief bushing, or electrical conduit fitting(s), with correctly rated electrical wire or cable must be used in accordance with all applicable Electrical Codes.
-
Connect the power line to the control panel as shown in the applicable wiring diagram (See Figures 6, 7, 8, 9 – on pages 12-15).
-
Connect power line to power source *. The required Voltage is either 120V or 240V and is indicated by an “X” marked in the check box next to either the 120V or 240V marking on the nameplate. Follow all code requirements regarding wire and circuit breaker size.
- Manufacturer recommends that the AIRaiderTM System be directly wired to the panel on a dedicated circuit.
321ND and 433ND 115V – 1Ph-60Hz Power Supply
433-S50(X)ND and 321-S50X with ½HP Submersible Pump 115V-1PH-60Hz Power Supply
Vent Line Installation
Use only 2”, 3” or 4” Schedule 40 PVC or equivalent pipe for vent line. Follow
all applicable AARST, EPA, and/or State Standards for Radon or VOC venting.
-
Place the lid of the AIRaiderTM on to the tank and clamp into place using the Hex Head Screws and Washers provided.
-
Connect vent line toAIRaiderTM lid using the enclosed rubber coupling (See Fig. 10).
-
The vent line must be routed in a manner that allows the system to exhaust above the level of the roof (see Fig. 11).
Note: When “Freeze Up” is posssible a minimum pipe diameter of 3” is recommended (See Fig. 12). -
The vent line must be pitched back toward the system to prevent condensation build up.
-
Cement all fittings in a manner that ensures no leakage will occur. Be certain to use cement that is suitable for potable water applications.
-
Install weather cap on top of the vent line. This cap should not restrict air flow and must prevent rain, snow and other contaminants from entering the vent line.
Failure to install a proper vent line may cause contamination of the water, outgassing of contaminants into the building, and/or limit system performance.
- The Manufacturer has found that vent lines less than 250 equivalent linear feet do not cause a decrease in contaminant removal percentages.
90° Bend = 15 Equiv. Linear Ft ; 45° Bend = 7 Equiv. Linear Ft.
Install Air Filter (Fig. 11)
Install air filter provided using the PVC pipe and fittings provided (Fig 14).
Remote Air Intake (Fig. 12)
If a Remote Air Intake is required because of Air Quality or Quantity issues
then Use Only 1-¼” or larger Schedule 40 PVC or equivalent pipe for the air
intake line.
-
Connect air intake line to the blower using the proper reducer coupling.
-
Run the intake line from the pipe connection on the blower to the location selected for air intake.
Note: A rubber coupling or similar means to disconnect the intake line from the is recommended. -
Connect the Air Filter to the vent line using the proper reducer coupling.
If the air intake is located outside, the filter or intake must be mounted
high enough off the ground to prevent the drawing in of snow, water and other
contaminants. Do not locate the air intake in the vicinity of vents from
furnaces, barbecue grills, etc.
Note: In-Line Air Filters are also available from the Manufacturer.
System Start-Up
- Remove cover and lid and pour ¼ cup of chlorine into the first chamber.(This will disinfect the system.) Replace the lid making sure all screws are secure.
- Check that all plumbing and electrical connections have been properly completed.
- Slowly change bypass to the “service” configuration. Check for leaks.
- Turn power switch for AIRaiderTM to “On”. Solenoid Valves will now open allowing water into the system. The aeration process will also start. Check for leaks.
- Allow the AIRaiderTM to fill with water.
- On 433-S50 & 433-S50X Systems the submersible pump installed in the Aeration Tank will self prime when the rising water level lifts the pump float and the pump starts. Follow pump manufac-turer’s instructions to prime other external pumps.The normal operating range is nominally 40 PSI –60 PSI* but will vary(Pressure Switches on 433-S50 & 433-S50X factory set at 38 PSI – 55 PSI approx.).
Do Not Attempt to Adjust the Pressure on 433-S50 or 433-S50X Systems, as
this may result in the pump not shutting down as it attempts to reach too
high a set pressure. This problem may not occur immediately but can occur
later when a low voltage supply occurs due to high electrical demand or other
external factors. The factory pressure setting is deliberately less than
maximum to provide an allowance for a low voltage supply event. Continuous
operation of the pump when there is no water demand will overheat the system
causing the thermal overload to trip and consequent pump shut down.
Note: Priming process for the jet pump and pressure settings may vary with
repressurization system.
System Check
-
Run the system through a couple of cycles to ensure all components are working properly.
-
The blower timer is preset for 5 minutes delay. After the solenoid valves shut, check that the blower continues running for the preset number of minutes delay.
-
Open the tank and check the system.
a. Remove the tank lid.
b. Lower the water level in the tank by opening a bath tub tap, or similar, within the residence. The floats will fall with the water level. The minimum water level is reached when the lower float drops (except on 433-S50 & 433-S50X systems where minimum water level occurs when the middle float drops). There will be an audible click and the solenoids will open allowing the tank to start filling; the blower should also start running. The water level must rise regard less of how many taps are open within the residence. -
While the tank is filling lift the lower float (middle float on 433-S50 & 433-S50X), water in flow should stop and the blower will remain running (until the end of the preset delay). Release the lower float.
-
While the tank is still filling lift the upper float; water in flow should stop and the blower will remain running. Release the upper float. Pushing down the lower float on 433-S50
and 433-S50X Systems will shut off the pump.
e. Remember to shut off any open taps within the residence. -
Replace the lid and secure with the fasteners provided. With the System running check the lid for air leaks between lid gasket and tank. If leaks occur the fasteners should be tightened until leaks are eliminated.
-
Make sure you have properly labeled the system with the necessary installer information (i.e. company name, phone #, date installed, etc.) and you have left all system information with the home owner.
-
The AIRaiderTM System is now operational.
Recommended Installation Options: Overflow Protection and Alarm
- It is recommended that a Flood Stop (P/N 28276) be installed prior to use of this system to provide point of leak detection, whereby a motorized ball valve will automatically shut off the system and prevent potential overflows should debris clog a shut-off valve.
- It is recommended that a basement Water Alarm be installed to warn residents of water tank overflows or system leaks.
RETESTING AND MAINTENANCE
Retesting
After the AIRaiderTM installation, the installer should perform another water
analysis to ensure proper system performance. This sample should be performed
one week after the date of installation.
Sampling Procedure:
- Remove aerator from faucet or spigot, if applicable.
- Run water so that the AIRaiderTM operates for two cycles.
- Turn off water for 5 minutes.
- Turn water on and proceed with sampling as per the laboratory instructions.
Maintenance
Proper maintenance of the AIRaiderTM can prevent possible system failure and
provide years of trouble-free service.
Six Month Service (recommended)
The following procedures should be followed to maintain the AIRaiderTM:
- Check and/or clean the blower air intake filter.
- Check and/or clean any filters or strainer installed on the inlet line to the AIRaiderTM. In installations with particularly high levels of sediment, cleaning of filters may be required more frequently.
- Check and clean inlet screen on pump.
- Using a wet/dry vac, clean sediment from bottom of aeration tank if necessary.
- Clean (if necessary) tank and diffusers of all mineral buildup.
- Chlorinate tank and lines by pouring ¼ cup of chlorine into the first aeration chamber.
- Check all control panel connections and electrical components (blower, pump, timer, fuses, etc.) for proper operation.
Check float switches for proper operation.
-
Inspect vent line for possible obstructions.
-
Run system through two cycles to ensure good working order.
Annual Service (required)
The following procedures should be followed annually to maintain the
AIRaiderTM:
- Clean solenoids and switch coil locations.
- Check all hose connections.
- Check and/or clean the blower air intake filter.
- Check and/or clean any filters or strainer installed on the inlet line to the AIRaiderTM.
- Check and clean inlet screen on pump.
- Using a wet/dry vac, clean sediment from bottom of aeration tank if necessary.
- Clean (if necessary) tank and diffusers of all mineral build up.
- Chlorinate tank and lines by pouring ¼ cup of chlorine into the first aeration chamber.
- Check all control panel connections and electrical components (blower, pump, timer, fuses, etc.) for proper operation.
Check float switches for proper operation.
- Inspect vent line for possible obstructions.
- Run system through two cycles to ensure good working order.
- Perform Water Test.
**Recommended Additional Service***
- Every 3 years, replace all hoses.
- Every 3-5 years, replace the solenoid valves.
- During Annual Service
TROUBLESHOOTING
LIMITED WARRANTY
Subject to applicable consumer protection legislation, RadonAway warrants that the AIRaider™ will be free from defective materials and workmanship for the period of two (2) years from the date of purchase. Warranty is contingent on installation and system maintenance (including annual service requirement) in accordance with the provided System Installation and Instruction manu-al. This warranty does not apply where repairs or alterations have been made or attempt-ed by others; or the unit has been abused or misused. Warranty does not include damage in shipment unless the damage is due to the negligence of RadonAway. To make a claim under these limited warranties, you must return the defective item to RadonAway. All other warranties, expressed or written are not valid. RadonAway is not responsible for installation or removal cost associated with this warranty. In no case is RadonAway liable beyond repair or replacement of the defective product FOB RadonAway.
RADONAWAY SPECIFICALLY DISCLAIMS ANY WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE.
THERE ARE NO WARRANTIES WHICH EXTEND BEYOND THE DESCRIPTION ON THE FACE
HEREOF. THERE IS NO WARRANTY OF MERCHANTABILITY. ALL OTHER WARRANTIES,
EXPRESSED OR WRITTEN, ARE NOT VALID.
In order to obtain service under this warranty, the consumer must contact the
installer or dealer where the unit was purchased. The installer or dealer must
then contact Ra-donAway directly for a Return Merchandise Authorization (RMA)
number and ship-ping information. No returns can be accepted without an RMA.
RadonAway may re-quire the defective part(s) to be returned to place of
manufacture (freight pre-paid) to process the warranty claim. Defective
part(s) covered under this warranty will be replaced or repaired at the place
of manufacture and returned to the installer or dealer (freight pre-paid). In
replacing or repairing parts or products, RadonAway reserves the right to make
such changes in the details of design construction, arrangement or make
materials as shall in its judgment constitute an improvement over former
practice.
Record the following for your records:
Serial No.
Date Purchased:
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>