ENF Solar H3 PRO 10-30kW Storage Inverter User Guide
- June 1, 2024
- ENF Solar
Table of Contents
ENF Solar H3 PRO 10-30kW Storage Inverter
| Product Specifications
- Model Options : 10-30kW Storage Inverter
- Cable Type : Micro-Breaker
- AC Wire Preparation : L1, L2, L3, N, PE
Product Usage Instructions
Installation Steps
- Choose the right location: Ensure proper distance from surrounding objects.
- Mark the position: Mark where the inverter will be installed.
- Installing the Bracket: Screw the expansion bolts and hammer the expansion tubes.
- DC Connector Separation: Use specified wrench tool and follow instructions for DC+ and DC- connectors.
Grid Wiring
Follow the steps to connect the GRID plug into three parts as instructed in
the manual.
Serial Port Connections
Connect the specified terminals on the inverter to corresponding ports. Follow
instructions for grounding wiring.
Inverter Start-Up
- Ensure stability: Confirm the inverter is fixed securely.
- Check wiring: Ensure all connections are completed.
- Meter connection: Verify proper connection of the meter.
- Battery connection: Ensure batteries are connected correctly.
- AC-EPS contactor: Connect if required.
- Turn on PV/DC switch: Switch on the breaker and battery breaker.
Frequently Asked Questions (FAQ)
-
Q: How do I know if the inverter is installed correctly?
A: You can verify the correct installation by checking the stability of the inverter, completion of all wirings, proper meter and battery connections, and ensuring the AC-EPS contactor is connected if needed. -
Q: What should I do if I encounter issues during start-up?
A: If you face any problems during start-up, double-check all connections and refer to the user manual for troubleshooting steps. Ensure safety measures are followed at all times.
Quick Installation Guide
- Packing List
Object | Quan | Descript | Object | Quan | Descript |
---|---|---|---|---|---|
A | 1 | Inverter | J | 1 | LAN/GPRS ( ponal) |
B | 1 | Bracket | K | 1 | Meter |
C | 12 | PV connector nl for H3-Pro) |
(6posie 6nega e)
| L| 1 Hexagonal screw M4*16
D
|
12
| PV pin contact for H3-Pro) (6posie 6nega e)|
M
|
4
|
E| 1| AC connectors-EPS| N| 4|
| 4| Expansion tubes & Expansion screws| | 1 Hexagonal screw
M5*10 grounding screw
G| 1| Earth terminal| P| 1|
H| 1| AC connectors-Grid| Q| 1|
I| 1| Quick install| R| 1| Mechanical Lock
Installation Steps
Please make sure the inverter will be installed with a proper distance as shown below.
Step1: Choose the right location
Step2: Mark the position
- Installation position recommendation.
- Use a spirit level to adjust the installation position.
Step3 : Drill the 6 holes with a 8 drill bit.
- Depth: at least 50mm Hammer the expansion tubes
- Installing the Bracket Screw the expansion bolts
Step4: Match the inverter with bracket
Lock the screws on the side Make sure the inverter is firmly attached.
DC Connection
- PV Connection
- Choose 4mm wire to connect the PV
- PV + uses such terminals
- Press the wire and terminal tightly with a wire clamp
- Insert pin into the male or female plug.
- Until hear a “click”
- Tighten the nut on the terminal
BAT Connection
- BAT cable is in the BMS package and is recommended.
- Connect the BAT of the inverter and the battery port of the BMS with a power cable.
- Communication with BMS, BMS communication line needs to be shorter than 10m Assemble the gland and screw the nut.
- Min. operating voltage of the BAT is 120V.
Unlock the DC connector:
- Use the specified wrench tool.
- When separating the DC+ connector, push the tool down from the top.
- When separating the DC- connector, push the tool down from the bottom.
- Separate the connectors by hand.
- Battery Wiring Turn off the DC switch.
- Choose 10mm’ wire to connect the battery.
- Trim 6mm of insulation from the wire end.
- Separate the DC connector (battery) as below.
- Insert striped cable into pin contact and ensure all conductor strands are captured in the pin contact.
- Crimp pin contact b g a crimping plier. Put the pin contact with striped cable into the corresponding crimping pliers and crimp the contact.
- Insert pin contact through the cable nut to assemble into back of the male or female plug. When out feel or hear a “click the pin contact assembly is seated correctly.
- Note:
Unlock the DC connector:
- Use the specified wrench tool.
- When separating the DC+ connector, push the tool down from the top.
- When separating the DC- connector, push the tool down from the bottom.
- Separate the connectors by hand.
AC Connection
Step1: Cable dimensions
Modell (kW)| 10.0| 12.0| 15.0| 20.0- 22.0|
24.9- 25.0| 29.9- 30.0
---|---|---|---|---|---|---
Cable ID)| 6.0-10.0mm²| 6.0-10.0mm²| 6.0-10.0mm²| 10.0-16.0mm²|
10.0-16.0mm²| 10.0-16.0mm²
Micro-Breaker| 40A| 40A| 50A| 63A| 63A| 80A
Modell (kW)| 10.0| 12.0| 15.0| 20.0- 22.0|
24.9- 25.0| 29.9- 30.0
Cable (EPS)| 6.0-10.0mm²| 6.0-10.0mm²| 6.0-10.0mm²| 10mm²| 10.0mm²| 10.0mm²
Micro-Breaker| 40A| 40A| 50A| 63A| 63A| 80A
Step2: Prepare AC wire as shown in the picture
L1/L2/L3: Brown/Red/Green or Yellow Wire
- N: Blue/Black Wire
- PE: Yellow & Green Wire
- Note: Please refer to local cable type and color for actual installation.
- A. EPS Connection
Disassemble the connector
-
Tighten the wire with a screwdriver, The torque of the crimp screw is 2.0$0.1N.m. Be sure to disconnect all power supplies before removing the protective end caps and wait 10 minutes before performing maintenance work.
-
Put the sealing body and yarn trapper into the main body, screw the lock nut into the main body, and the torque is (2.5 + / – 0.5N•m).
-
The female end of the wire is inserted into the male end of the line and accompanied by a click sound, and the installation is complete.
-
Use a screwdriver to align the unlock position and press and Hold the thread and pull it back to complete the separation of the male and female.
B. GRID Wiring
Separate the ON-GRID plug into three parts as below.
- Hold the middle part of the female insert, rotate the back shell to loosen it, and detach it from female inset.
- Remove the cable nut (with rubber insert) from the back shell.
- Slide the cable nut and then the back shell onto the cable.
- Push the threaded sleeve into the socket gotten up the cap on the terminal and the torque is (4-5N.m).
- Push the threaded sleeve to connection terminal until both are locked tightly on the inverter.
- Remove the GRID connector: Using the matching U-shaped unlocking tool, remove the external mechanical latch, swirl the swirl, and then pull it out.
Grounding Wiring
- Trim 6mm of insulation from the wire end.
- Insert striped cable into earth terminal and ensure all conductor strands are captured in the earth terminal.
- Crimp earth terminal b g a crimping plier. Put the earth terminal with striped cable into the corresponding crimping pliers and crimp the contact.
- Use the crimping pliers to press the ground cable into the ground terminal screw the ground screw with screwdriver as shown below.
Serial Port Connexons
Meter and RS485 should be connected to inverter by the connector illustrated in the figure below. All ports in connector should connect to the corresponding ports on inverter.
METER/CT/RS485 interface(20pin terminals)
Note: GND TVS, RY Ctri, these wiring terminals are tested in the factory, please do not connect them.
Note:
- Pin11 is the power supply+12V, and Pin10 is the corresponding GND used.
- The maximum load of the 12V power supply port cannot exceed 10W (instantaneous current cannot exceed 1A); Otherwise, it will damage the inverter.
COM interface (24pin terminals)
Note:
- Compatible Meter type: DTSU666 (CHINT).
- For other pin definitions, please refer to the user manual
- Communication A and B are marked on the side of the meter;
Note: reference only. Local wiring colors are based on local codes, the quick release diagrams are for
Inverter Start-Up
Please refer to the following steps to start up the inverter.
- Ensure the inverter fixed well.
- Make sure all wirings are completed.
- Make sure the meter is connected well.
- Make sure the battery is connected well.
- Make sure the AC-EPS contactor is connected well (if needed).
- Make sure the BMS buttons and battery switch are off.
- Turn on the PV/DC switch (for Hybrid version only), AC-GRID breaker, EPS breaker and battery breaker.
- If the main page shows “switch off”, please long press “V” bottom to quickly go to the START/STOP page and set it to start. (Enter the settings page, default password is ‘0000’). Note:
Add boot-up guide interface, the first boot-up need to select the safety regulations and set the time.
Inverter Switch Off
Please refer to the following steps to switch off the inverter.
- Enter the settings page, select START / STOP and set it to stop.
- Turn off the PV/DC switch (for Hybrid version only), AC breaker, EPS breaker and battery breaker.
- Wait 5 min before you open the upper lid (if in need of repair).
Note:
The inverter installation in complete. For battery installation, please
refer to battery quick installation guide.
- Please scan the QR Code and follow the steps below to download our latest multi-language
- User Manual/Quick Installation Guide: Scan the QR Code → Select your Language → Choose to download User Manual or Quick Installation Guide → Download
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>