bryant PH5SAN5 Single Stage Heat Pump Instruction Manual
- May 15, 2024
- bryant
Table of Contents
bryant PH5SAN5 Single Stage Heat Pump
SAFETY CONSIDERATIONS
IMPORTANT: This appliance shall only be installed by EPA qualified personnel having appropriate certification. This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental capabilities or lack of experience and knowledge, unless they have been given supervision or instruction concerning use of the appliance by a person responsible for their safety Improper installation, adjustment, alteration, service, maintenance, or use can cause explosion, fire, electrical shock, or other conditions which may cause death, personal injury, or property damage. Consult a qualified installer, service agency, or your distributor or branch for information or assistance. The qualified installer or agency must use factory–authorized kits or accessories when modifying this product. Refer to the individual instructions packaged with the kits or accessories when installing.
Follow all safety codes. Wear safety glasses, protective clothing, and work gloves. Use quenching cloth for brazing operations. Have a dry powder or CO2 fire extinguisher available. Read these instructions thoroughly and follow all warnings or cautions included in literature and attached to the unit. Consult local building codes and current editions of the National Electrical Code (NEC) NFPA 70. In Canada, refer to current editions of the Canadian electrical code CSA 22.1.
Proper tools should be used that are designed for the refrigerant of the unit being installed. For A2L refrigerants, non-sparking tools are required. A refrigerant detector should be used prior to and during the installation process to check for leaks. Open flames or other ignition sources should not be present except during brazing. Brazing should only take place on refrigerant tubes that are open to the atmosphere or have been properly evacuated.
Recognize safety information. This is the safety–alert symbol . When you see this symbol on the unit and in instructions or manuals, be alert to the potential for personal injury.
Understand these signal words; DANGER, WARNING, and CAUTION. These words are
used with the safety–alert symbol.
DANGER identifies the most serious hazards which will result in severe
personal injury or death.
WARNING signifies hazards which could result in personal injury or death.
CAUTION is used to identify unsafe practices which may result in minor
personal injury or product and property damage. NOTE is used to highlight
suggestions which will result in enhanced installation, reliability, or
operation.
COWSAR HZB-15N Portable Nugget Ice Maker
Failure to follow this warning could result in personal injury or death.
Before installing, modifying, or servicing system, main electrical disconnect
switch must be in the OFF position. There may be more than one disconnect
switch. Lock out and tag switch with a suitable warning label.
EXPLOSION HAZARD
Failure to follow this warning could result in death, serious personal
injury, and/or property damage.
Never use air or any gas containing oxygen for leak testing or operating
refrigerant compressors. Never allow compressor suction pressure to operate in
a vacuum with service valves closed. See service manual for pump-down
instructions.
GENERAL
NOTE: In some cases noise in the living area has been traced to gas pulsations from improper installation of equipment.
- Maximum allowed elevation is 10,000 feet (3000 meters) above sea level.
- Locate unit away from windows, patios, decks, etc. where unit operation sound may disturb customer.
- Ensure that vapor and liquid tube diameters are appropriate for unit capacity.
- Run refrigerant tubes with no bends with centerline bend radius less than 2.5 times the external pipe diameter..
- Leave some slack between structure and unit to absorb vibration.
- When passing refrigerant tubes through the wall, seal opening with RTV or other pliable silicon–based caulk (see Fig. 1).
- Avoid direct tubing contact with water pipes, duct work, floor joists, wall studs, floors, and walls.
- Do not suspend refrigerant tubing from joists and studs with a rigid wire or strap which comes in direct contact with tubing (see Fig. 1).
- Ensure that tubing insulation is pliable and completely surrounds vapor tube.
- When necessary, use hanger straps which are 1 in. (25 mm) wide and conform to shape of tubing insulation (see Fig. 1).
- Isolate hanger straps from insulation by using metal sleeves bent to conform to shape of insulation.
- Provision shall be made for expansion and contraction of long runs of piping.
- Piping and fittings shall be protected as far as possible against adverse environmental effects. For example, the accumulation of dirt and debris.
- Piping should be installed to reduce the likelihood of hydraulic shock damaging the system.
- Certified piping and components must be used in order to protect against corrosion.
- Flexible pipe elements shall be protected against mechanical damage, excessive stress by torsion, or other forces. They should be checked for mechanical damage annually.
- Piping material, routing, and installation shall include protection from physical damage in operation and service, and be in compliance with the national and local codes and standards of the installation site.
- When setting up refrigerant piping, precautions shall be taken to avoid excessive vibration or pulsation.
Fig. 1 – Connecting Tubing Installation
Refrigerant Tubing Connection Outdoor
IMPORTANT: Maximum liquid–line size is 3/8–in. OD for all residential applications including long line. Refer to Residential Piping and Long Line Guideline for further information.
IMPORTANT: Always install the factory–supplied liquid–line filter drier.
If replacing the filter drier, refer to Product Replacement Parts List for appropriate part number. Obtain replacement filter driers from your distributor or branch.
INSTALLATION
IMPORTANT: Effective January 1, 2023, all split system and packaged heat pumps must be installed pursuant to applicable regional efficiency standards issued by the Department of Energy.
CUT HAZARD
Failure to follow this caution may result in personal injury. Sheet metal parts may have sharp edges or burrs. Use care and wear appropriate protective clothing and gloves when handling parts.
Check Equipment and Job Site
Unpack Unit
Move to final location. Remove carton taking care not to damage unit.
Inspect Equipment
File claim with shipping company prior to installation if shipment is damaged or incomplete. Locate unit rating plate on unit corner panel. It contains information needed to properly install unit. Check rating plate to be sure unit matches job specifications.
Install on a Solid, Level Mounting Pad
If conditions or local codes require the unit be attached to pad, tie down
bolts should be used and fastened through knockouts provided in unit base pan.
Refer to unit mounting pattern in Fig. 2 to determine base pan size and
knockout hole location.
For hurricane tie downs, contact distributor for details and PE Certification
(Professional Engineer), if required.
On rooftop applications, mount on level platform or frame. Place unit above a
load–bearing wall and isolate unit and tubing set from structure. Arrange
supporting members to adequately support unit and minimize transmission of
vibration to building. Consult local codes governing rooftop applications.
Roof mounted units exposed to winds above 5 mph may require wind baffles.
Consult the Application Guideline and Service Manual – Residential Split
System Air Conditioners and Heat Pumps for wind baffle construction.
Unit must be level to within ±2° (±3/8 in/ft,±9.5 mm/m) per compressor
manufacturer specifications.
Clearance Requirements
When installing, allow sufficient space for airflow clearance, wiring, refrigerant piping, and service. Allow 24 in. (610 mm) clearance to service end of unit and 48 in. (1219 mm) above unit. For proper airflow, a 6–in. (152 mm) clearance on 1 side of unit and 12–in. (305 mm) on all remaining sides must be maintained. Maintain a distance of 24 in. (610 mm) between units or 18 in. (457 mm) if no overhang within 12 ft. (4 m). Position so water, snow, or ice from roof or eaves cannot fall directly on unit.
NOTE: 18” (457 mm) clearance option described above is approved for outdoor units with wire grille coil guard only. Units with louver panels require 24” (610 mm) between units. On rooftop applications, locate unit at least 6 in. (152 mm) above roof surface.
UNIT BASE PAN Dimension in. (mm)| TIEDOWN KNOCKOUT LOCATIONS in.
(mm)
---|---
A| B| C
31–1/2 X 31–1/2 (800 X 800)| 9–1/8 (231.8)| 6–9/16 (166.7)| 24–11/16 (627.1)
35 X 35 (889 X 889)| 9–1/8 (231.8)| 6–9/16 (166.7)| 28–7/16 (722.3)
Operating Ambient
The minimum outdoor operating ambient in cooling mode without accessory is 55°F (13°C).
Check Defrost Thermostat
PERSONAL INJURY AND ENVIRONMENTAL HAZARD
Failure to follow this warning could result in personal injury or death.
Do not use means to accelerate the defrosting process or to clean, other than
those recommended by the manufacturer.
The appliance shall be stored in a room without continuously operating
ignition sources (for example: open flames, an operating gas appliance or an
operating electric heater.
Do not pierce or burn.
Be aware that refrigerants do not contain an odor.
Check defrost thermostat to ensure it is properly located and securely
attached. There is a liquid header with a distributor and feeder tube going
into outdoor coil. At the end of the one of the feeder tubes, there is a 3/8
in. O.D. stub tube approximately 2 in. (50.8 mm) long (see Fig. 3). The
defrost thermostat should be located on stub tube. Note that there is only one
stub tube used with liquid header, and on most units it is the bottom circuit.
Fig. 3 – Defrost Thermostat Location
Elevate Unit
UNIT OPERATION HAZARD
Failure to follow this caution may result in equipment damage or improper
operation.
Do not allow water and/or ice to build up in base pan.
Elevate unit per local climate and code requirements to provide clearance above estimated snowfall level and ensure adequate drainage of unit.
Table 1 – Accessory Usage
Accessory| REQUIRED FOR LOW–AMBIENT COOLING APPLICATIONS (Below 55°F /
12.8°C)| **REQUIRED FOR LONG LINE APPLICATIONS *| REQUIRED FOR SEA
COAST APPLICATIONS (Within 2 miles / 3.22 km)**
---|---|---|---
Accumulator| Standard| Standard| Standard
Ball Bearing Fan Motor| Yes†| No| No
Compressor Start Assist Capacitor and Relay| Yes| Yes| No
Crankcase Heater| Yes| Yes| No
Evaporator Freeze Thermostat| Yes| No| No
Hard Shutoff TXV| Yes| Yes| No
Isolation Relay| Yes| No| No
Liquid Line Solenoid Valve| No| See Long–Line Application Guideline| No
Motor Master® Control or Low Ambient Switch| Yes‡| No| No
Support Feet| Recommended| No| Recommended
- For tubing line sets between 80 and 200 ft. (24.38 and 60.96 m) and/or 20 ft. (6.09 m) vertical differential, refer to Residential Piping and Long Line Guideline
- Additional requirement for Low–Ambient Controller (full modulation feature) Motor Master® Control.
- In units equipped with ECM OD motor, motor needs to be replaced per unit accessory guide to work properly. This motor kit comes with a new defrost board that also needs to be installed. Unit will not meet AHRI rated efficiency once motor and control board are replaced to use this accessory.
Make Piping Connections
PERSONAL INJURY AND ENVIRONMENTAL HAZARD
Failure to follow this warning could result in personal injury or death.
Relieve pressure and recover all refrigerant before system repair or final
unit disposal.
Use all service ports and open all flow–control devices, including solenoid
valves.
Federal regulations require that refrigerant is not vented into the
atmosphere. Recover during system repair or final unit disposal.
UNIT DAMAGE HAZARD
Failure to follow this caution may result in equipment damage or improper
operation.
If ANY refrigerant tubing is buried, provide a 6–in (152 mm) vertical rise at
service valve. Refrigerant tubing lengths up to 36–in (914 mm). may be buried
without further special consideration. Do not bury lines longer than 36 in
(914 mm).
Outdoor units may be connected to indoor section using accessory tubing
package or field–supplied refrigerant grade tubing of correct size and
condition.
Rated tubing diameters shown in Table 2 are recommended up to 80 ft. (24 m).
See Product Data for acceptable alternate vapor diameters and associated
capacity losses.
For tubing requirements beyond 80 ft, substantial capacity and performance
losses can occur. Following the recommendations in the Residential Piping and
Long Line Guideline will reduce these losses. Refer to Table 1 for accessory
requirements.
There are no buried–line applications greater than 36 in. (914 mm) If
refrigerant tubes or indoor coil are exposed to atmosphere, they must be
evacuated to 500 microns to eliminate contamination and moisture in the
system.
Refrigerant pipe should be installed with the minimum length possible and
practical for the application. Piping should be protected from physical damage
in operation and in service and be in compliance with national and local codes
such as ASRHAE 15, ASHRAE 15.2, IAPMO Uniform Mechanical Code, ICC
International Mechanical Code, or CSA B52. When piping is installed through
studs in a wall, steel plates should be used for protection with a minimum
thickness of 16 gage. All field joints shall be accessible for inspection
prior to being covered or enclosed.
Outdoor Unit Connected To Factory Approved R-454B Indoor Unit
When outdoor unit is connected to factory–approved R-454B indoor unit, outdoor
unit contains approximate system refrigerant charge for operation with AHRI
rated indoor unit when connected by 15 ft. (5 m) of field–supplied or factory
accessory tubing and factory supplied filter drier. For all sizes, adjust
charge by adding or removing 0.6 oz/ft of 3/8 liquid line above or below 15
ft. (5 m) respectively.. Some indoor units require additional subcooling to
achieve optimal heating performance.
Connect vapor and liquid tubes to fittings on vapor and liquid service valves
(see Table 2). Use refrigerant grade tubing.
Table 2 – Refrigerant Connections and Recommended Liquid and Vapor Tube Diameters (In.)
UNIT SIZE | LIQUID | **RATED VAPOR *** |
---|---|---|
Connection Diameter | Tube Diameter | Connection Diameter |
Tube Diameter
18, 24| 3/8| 3/8| 5/8| 5/8
30, 36| 3/8| 3/8| 3/4| 3/4
42, 48| 3/8| 3/8| 7/8| 7/8
60| 3/8| 3/8| 7/8| 1–1/8
- Units are rated with 25 ft. (7.6 m) of linseed. See Product Data sheet for performance data when using different size and length linseeds.
Notes:
- Do not apply capillary tube indoor coils to these units.
- For Tubing Set lengths between 80 and 200 ft. (24.38 and 60.96 m) horizontal or 20 ft. (6.09 m) vertical differential 250 ft. (76.2 m) Total Equivalent Length, refer to the Residential Piping and Long Line Guideline – Air Conditioners and Heat Pumps using R-454B refrigerant.
- For alternate liquid line options, see Product Data or Residential Piping and Long Line Application Guideline
Service Valves
Service valves are closed and plugged from the factory. Outdoor units are shipped with a refrigerant charge sealed in the unit. Leave the service valves closed until all other refrigerant system work is complete or the charge will be lost. Leave the plugs in place until line set tubing is ready to be inserted.
Heat pumps require a piston metering device in the liquid service valve for proper heating operation. Piston is shipped in the piston body of the liquid service valve, temporarily held in place with a plastic cap. Do not remove the plastic cap until line set tubing is ready to be installed. Refer to Fig. 4 and follow these steps for piston installation:
- Remove plastic cap holding piston in piston body of liquid service valve.
- Check that piston size (stamped on side of piston) matches with number listed on unit rating plate. Return piston to piston body of liquid service valve (either direction).
- Find plastic bag taped to unit containing copper adapter tube, brass nut, and plastic washer.
- Install plastic washer in the seat inside piston body.
- Fit brass nut onto adapter tube and install tube onto liquid service valve. Tighten nut finger tight, then wrench additional ½ turn only [15-ft lbs (20.3 N-m)]. Over tightening may damage the plastic washer and service valve’s piston body.
Fig. 4 – Liquid Service Valve with Heating Piston and Adapter Tube
Brazing Connections
BURN HAZARD
Failure to follow this caution may result in personal injury.
Components will be HOT after brazing. Wear appropriate personal protective
equipment and allow to cool before handling parts and equipment.
If using brazing connections, use a properly sized sedge tool to create a
sedge (bell) on one of the two copper tubes being connected.
Alternatively, a copper coupling can be used which will require two braze
joints instead of one.
Clean line set tube ends with emery cloth or steel brush. Remove any grit or
debris.
Connect vapor tube to fitting on outdoor unit vapor service valves (see Table
2). Connect liquid tubing to adapter tube on liquid service valve. Use
refrigerant grade tubing.
UNIT DAMAGE HAZARD
Failure to follow this caution may result in equipment damage or improper
operation.
Service valves must be wrapped in a heat–sinking material such as a wet cloth
while brazing.
Apply heat absorbing paste or heat sink product between service valve and joint. Wrap service valves with a heat sinking material such as a wet cloth.
After wrapping service valve with a wet cloth, tubing set can be brazed to
service valve using either silver bearing or non–silver bearing brazing
material. Do not use soft solder (materials which melt below 800°F/427°C).
Braze joints using a Sil-Foes or Phis-copper alloy. Consult local code
requirements.
Some outdoor units contain a mechanical fitting at the liquid distributor.
This connection is not field serviceable and should not be disturbed.
For Liquid Service Valve – Braze linseed to adapter tube BEFORE bolting
adapter to valve. This helps prevent overheating and damage to plastic washer
or o-ring.
For Vapor Service Valve – remove valve core from Schrader port on Service
Valve BEFORE brazing. This helps prevent overheating and damage to valve seals
(refer to Fig. 5). Replace valve core when brazing is completed.
FIRE HAZARD
Failure to following this warning could result in personal injury, death
and/or property damage.
Refrigerant and oil mixture could ignite and burn as it escapes and contacts
brazing torch. Make sure the refrigerant charge is properly removed from both
the high and low sides of the system before brazing any component or lines.
Mechanical Line Set Connections
If using mechanical or crimp-type line set connections, follow crimp tool
manufacturer’s instructions.
NOTE: Should the use of mechanical fittings cause failure of the fittings
or failure of the equipment, such would not be covered under the equipment
limited warranty.
Install Liquid Line Filter Drier Indoor
UNIT DAMAGE HAZARD
Failure to follow this caution may result in equipment damage or improper
operation
Installation of filter drier in liquid line is required.
Filter drier must be wrapped in a heat-sinking material such as a wet cloth
while brazing.
Refer to Fig. 6 and install filter drier as follows:
- Braze 5 in. (127 mm) liquid tube to the indoor coil.
- Wrap filter drier with damp cloth.
- Braze filter drier to 5 in. (127 mm) long liquid tube from step 1.
- Connect and braze liquid refrigerant tube to the filter drier.
Fig. 6 – Liquid Line Filter Drier
Mandatory Requirements
Pressure Proof Check
Refrigerant tubes and indoor coil should be pressure tested with an inert gas such as nitrogen. Pressurize the system with the inert gas to the Low Side Test Pressure listed on the outdoor unit rating plate
- Perform a pressure check of the unit with a nitrogen charge of about 200psi.
- The nitrogen holding charge must NOT decrease in pressure for 1 hour, as indicated by the test gauge. The measuring test gauge resolution not exceeding 5% of the holding charge.
Final Tubing Check
IMPORTANT: Check to be certain factory tubing on both indoor and outdoor unit has not shifted during shipment. Ensure tubes are not rubbing against each other or any sheet metal. Pay close attention to feeder tubes, makings sure wire ties on feeder tubes are secure and tight.
Pressure Test Tubing and Indoor Coil
Refrigerant tubes and indoor coil should be pressure tested with an inert gas such as nitrogen. Pressurize the system with the inert gas to the Low Side Test Pressure listed on the outdoor unit rating plate
EXPLOSION HAZARD
Failure to follow this warning could result in death, serious personal injury,
and/or property damage.
Never exceed the test pressures listed on the rating plate when pressure
testing an outdoor unit.
Leak Check
The deep vacuum method requires a vacuum pump capable of pulling a vacuum of 500 microns and a vacuum gage capable of accurately measuring this vacuum depth. The deep vacuum method is the most positive way of assuring a system is free of air and liquid water. A tight dry system will hold a vacuum of 1000 microns after approximately 7 minutes. (See Fig. 7.)
Fig. 7 – Deep Vacuum Graph
FIRE HAZARD
Failure to following this warning could result in personal injury, death
and/or property damage.
DO NOT USE FLAMES OR IGNITION SOURCES TO LEAK CHECK.
Vacuum unit to 500 microns. When isolating the unit from the pump, the
pressure shall not rise above 1500 microns in 10 minutes.
Evacuate Refrigerant Tubing and Indoor Coil
UNIT DAMAGE HAZARD
Failure to follow this caution may result in equipment damage or
improper operation.
Never use the system compressor as a vacuum pump
Refrigerant tubes and indoor coil should be evacuated using the recommended deep vacuum method of 500 microns. The alternate triple evacuation method may be used (see triple evacuation procedure in service manual). Always break a vacuum with dry nitrogen.
Make Electrical Connections
ELECTRICAL SHOCK HAZARD
Failure to follow this warning could result in personal injury or death. Do
not supply power to unit with compressor terminal box cover removed.
Be sure field wiring complies with local and national fire, safety, and
electrical codes, and voltage to system is within limits shown on unit rating
plate. Contact local power company for correction of improper voltage. See
unit rating plate for recommended circuit protection device.
NOTE: Operation of unit on improper line voltage constitutes abuse and
could affect unit reliability. See unit rating plate. Do not install unit in
system where voltage may fluctuate above or below permissible limits.
NOTE: Use copper wire only between disconnect switch and unit.
NOTE: Install branch circuit disconnect of adequate size per NEC to
handle unit starting current. Locate disconnect within sight from and readily
accessible from unit, per Section 440–14 of NEC. Refer to Product Data for
breaker sizing.
Route Ground and Power Wires
Remove access panel to gain access to unit wiring. Extend wires from disconnect through power wiring hole provided and into unit control box.
Connect Ground and Power Wires
ELECTRICAL SHOCK HAZARD
Failure to follow this warning could result in personal injury or death.
The unit cabinet must have an uninterrupted or unbroken ground to minimize
personal injury if an electrical fault should occur. The ground may consist of
electrical wire or metal conduit when installed in accordance with national
and local electrical codes.
This appliance incorporates an earth connection for safety purposes only.
Connect ground wire to ground connection in control box for safety. Connect
power wiring to contactor as shown in Fig. 8.
A94025 Fig. 8 – Line Connections
In 3-phase units, a small circuit board is factory installed to monitor line
voltage (see Fig. 9). A small LED will flash if a phase problem exists. See
code descriptions on monitor.
If LED is flashing, disconnect power to unit and interchange 2 field-wiring
leads on unit contactor.
Fig. 9 – 3–Phase Monitor Control (Applies to 3–Phase Units Only)
Table 3 – 3-Phase Monitor LED Indicators
LED | STATUS |
---|---|
OFF | No call for compressor operation |
FLASHING | Reversed phase |
ON | Normal |
UNIT DAMAGE HAZARD
Failure to follow this caution may result in equipment damage or
improper operation.
Ensure compressor rotation is correct.
- 3-phase scroll compressors are rotation sensitive.
- A flash LED on phase monitor indicates reverse rotation. (See Table 3). This will not allow contractor to be energized.
- Disconnect power to unit and interchange 2 field-wiring leads on unit contactor
Connect Control Wiring
Route 24v control wires through control wiring grommet and connect leads to
control wiring. See Thermostat Installation Instructions for wiring specific
unit combinations. (See Fig. 10.) Use No. 18 AWG color–coded, insulated (35°C
minimum) wire. If thermostat is located more than 100 ft (31 m) from unit, as
measured along the control voltage wires, use No. 16 AWG color–coded wire to
avoid excessive voltage drop.
All wiring must be NEC Class 2 and must be separated from incoming power
leads.
Use furnace transformer, fan coil transformer, or accessory transformer for
control power, 24v/40va minimum.
NOTE: Use of available 24v accessories may exceed the minimum 40va power
requirement. Determine total transformer loading and increase the transformer
capacity or split the load with an accessory transformer as required.
NOTE: Factory Authorized Dissipation System must be installed with the
indoor unit.
Fig. 10 – Generic Wiring Diagram (See tstat Installation Instructions for
specific unit combinations)
Final Wiring Check
IMPORTANT: Check factory wiring and field wire connections to ensure terminations are secured properly. Check wire routing to ensure wires are not in contact with tubing, sheet metal, etc.
Compressor Crankcase Heater
When equipped with a crankcase heater, furnish power to heater a minimum of 24 hr before starting unit. To furnish power to heater only, set thermostat to OFF and close electrical disconnect to outdoor unit. A crankcase heater is required if refrigerant tubing is longer than 80 ft (24 m), or when outdoor unit is 20 ft (6m) below indoor unit. Refer to the Residential Piping and Long Line Guideline and Service Manual.
Install Electrical Accessories
PERSONAL INJURY AND/OR PROPERTY DAMAGE HAZARD
Failure to follow this warning could result in personal injury and/or property
damage. For continued performance, reliability, and safety, the only approved
accessories and replacement parts are those specified by the equipment
manufacturer. The use of non-manufacturer approved parts and accessories could
invalidate the equipment limited warranty and result in fire risk, equipment
malfunction, and failure. Please review the manufacturer’s literature and
replacement parts catalogs available from your equipment supplier.
Start–Up
PERSONAL INJURY HAZARD
Failure to follow this caution may result in personal injury. Wear safety
glasses, protective clothing, and gloves when handling refrigerant and observe
the following:
- Front seating service valves are equipped with Schrader valves
ENVIRONMENTAL HAZARD
Failure to follow this caution may result in environmental damage.
Federal regulations require that you do not vent refrigerant to the
atmosphere. Recover during system repair or final unit disposal
UNIT OPERATION AND SAFETY HAZARD
Failure to follow this caution may result in personal injury, equipment damage
or improper operation.
- Do not overcharge system with refrigerant.
- Do not operate unit in a vacuum or at negative pressure.
- Do not disable low pressure switch in scroll compressor applications.
- Compressor dome temperatures may be hot
Follow these steps to properly start up system:
PERSONAL INJURY HAZARD
Failure to follow this warning could result in personal injury or death.
Do not use power tools to open and close service valves
Power tools can cause valve stem to suddenly be ejected from the valve body
followed by a high pressure refrigerant leak.
- After system is evacuated, fully open liquid and vapor service valves.
- Unit is shipped with valve stem(s) front seated (closed) and caps installed. Replace stem caps after system is opened to refrigerant flow (back seated). Replace caps finger–tight and tighten with wrench an additional 1/12 turn.
- Close electrical disconnects to energize system.
- Set room thermostat at desired temperature. Be sure set point is below indoor ambient temperature for cooling mode operation.
- Set room thermostat to HEAT or COOL and fan control to ON or AUTO mode, as desired. Operate unit for 15 minutes. Check system refrigerant charge.
Sequence of Operation
Turn on power to indoor and outdoor units. Transformer is energized.
Cooling
On a call for cooling, thermostat makes circuits R–O and R–Y, and R–G.
Circuit R–O energizes reversing valve, switching it to cooling position.
Circuit R–Y energizes contactor, starting outdoor fan motor and compressor
circuit. R–G energizes indoor unit blower relay, starting indoor blower motor
on high speed.
When thermostat is satisfied, its contacts open, de–energizing contactor and
blower relay. Compressor and motors should stop.
If indoor unit is equipped with a time–delay relay circuit, the indoor blower
will run an additional 90 seconds to increase system efficiency.
Heating
On a call for heating, thermostat makes circuits R–Y and R–G. Circuit R–Y
energizes contactor, starting outdoor fan motor and compressor. Circuit R–G
energizes indoor blower relay, starting blower motor on high speed.
Should temperature continue to fall, R–W2 is made through second– stage room
thermostat. Circuit R–W2 energizes a relay, bringing on first bank of
supplemental electric heat and providing electrical potential to second heater
relay (if used). If outdoor temperature falls below setting of outdoor
thermostat (field installed option), contacts close to complete circuit and
bring on second bank of supplemental electric heat. When thermostat is
satisfied, its contacts open, de–energizing contactor and relay. All heaters
and motors should stop.
Quiet Shift-2
Quiet Shift-2 is a field selectable defrost mode (factory set to OFF), which
will reduce the occasional noise that could be heard at the start of defrost
cycle and restarting of heating cycle. It is selected by placing DIP switch 3
on defrost board in the ON position.
When Quiet Shift-2 switch is placed in ON position, and defrost is initiated,
the following sequence of operation will occur:
- The compressor will be de–energized for approximately 1 minute, then the reversing valve will be energized. A few seconds later, the compressor will be re-energized and the normal defrost cycle starts. Once defrost termination conditions have been met, the following sequence will occur:
- The compressor will be de-energized for approximately 1 minute, then the reversing valve will be de-energized. A few seconds later, the compressor will be re-energized and the normal heating cycle starts.
Defrost
The defrost control is a time/temperature control which includes a field
selectable time period between defrost cycles (30, 60, 90, or 120). The time
period is selected using DIP switches located on the board. The setting is
initial period only then varies with defrost length.
The defrost thermostat senses coil temperature throughout the heating cycle.
When the coil temperature reaches the defrost thermostat setting of
approximately 32°F (0°C), it will close, which energizes the DFT terminal and
begins the defrost timing sequence. The timer runs only when the defrost
thermostat is closed and the contactor is energized.
Defrost mode is identical to cooling mode except that outdoor fan motor stops
and second-stage heat is turned on to continue warming conditioned spaces.
Defrost Speedup
Quiet Shift-2 Models
To initiate a forced defrost, speedup pins (J1) must be shorted with a flat head screwdriver for 5 seconds and RELEASED. If the defrost thermostat is open, a short defrost cycle will be observed (actual length depends on Quiet Shift-2 switch position). When Quiet Shift-2 is off, only a short 30 second defrost cycle is observed. With Quiet Shift-2 ON, the speedup sequence is approximately 3 minutes; 1 minute compressor off period followed by 30 seconds of defrost with compressor operation. When returning to heating mode, the compressor will turn off for an additional minute.
If the defrost thermostat is closed, a complete defrost cycle is initiated. If the Quiet Shift-2 switch is turned on, the compressor will be turned off for two 1-minute intervals as explained previously.
If Quiet Shift 2 is enabled, the variable defrost intervals will be disabled to provide options where using a specific setting is desired. In this case the 30, 60, 90, or 120 setting will not change unless the dipswitch is changed, and power is cycled.
NOTE: Forcing a defrost will reset the defrost interval to the DIP switch setting before resuming variable length intervals based on defrost cycle lengths.
Check Charge
Factory charge amount and desired subcooling are shown on unit rating plate. Additional subcooling may be required to achieve optimal heating performance based on the installed indoor unit.. Care should be taken to ensure proper refrigerant is used for charging. Refer to outdoor unit rating plate to determine proper refrigerant. Refrigerant cylinders used for charging should be kept in an appropriate position and grounded to earth before charging. Hose length should be kept to a minimum. Care should be taken to not overcharge the system. Charging method is shown on information plate inside unit. For TXV, use subcooling method. For piston, use superheat method. To properly check or adjust charge, conditions must be favorable for subcooling or superheat charging. Favorable conditions exist when the outdoor temperature is between 70°F and 100°F (21.1°C and 37.8°C), and the indoor temperature is between 70°F and 80°F (21.1°C and 26.7°C). Follow the procedure below:
Unit is factory charged for 15ft (5 m) of linseed. Adjust charge by adding or removing 0.6 oz/ft (.018 kg/m) of 3/8 liquid line above or below 15ft (5 m) respectively.
For standard refrigerant line lengths (80 ft/24 m or less), allow system to operate in cooling mode at least 15 minutes. If conditions are favorable, check system charge by super heat method for fixed metering device and subcooling method for TXV. If any adjustment is necessary, adjust charge slowly and allow system to operate for 15 minutes to stabilize before declaring a properly charged system.
If the indoor temperature is above 80°F (26.7°C), and the outdoor temperature is in the favorable range, adjust system charge by weight based on line length and allow the indoor temperature to drop to 80°F (26.7°C) before attempting to check system charge by subcooling method as described above.
If the indoor temperature is below 70°F (21.1°C), or the outdoor temperature is not in the favorable range, adjust charge for line set length above or below 15ft (5 m) only. Charge level should then be appropriate for the system to achieve rated capacity. The charge level could then be checked at another time when the both indoor and outdoor temperatures are in a more favorable range.
NOTE: If line length is beyond 80 ft (24 m) or greater than 20 ft (6 m) vertical separation, See Residential Piping and Long Line Guideline for special charging requirements.
Final charge should be recorded on the outdoor unit charging label with permanent and legible writing. Total refrigerant charge is factory charge plus any added charge. Verify that the indoor space served by the indoor unit, including spaces connected by ductwork, exceed the minimum room size as listed on the outdoor unit charging label. Refer to Table 4.
Table 4 – Minimum Room Area Charging Table
Total System Charge (lbs.) | Minimum Floor Area (sq. ft.) |
---|---|
4 | 61 |
5 | 76 |
6 | 91 |
7 | 106 |
8 | 122 |
9 | 137 |
10 | 152 |
11 | 167 |
12 | 182 |
13 | 198 |
14 | 213 |
15 | 228 |
16 | 243 |
17 | 258 |
18 | 274 |
19 | 289 |
20 | 304 |
21 | 319 |
22 | 335 |
23 | 350 |
24 | 365 |
25 | 380 |
Units with Cooling Mode TXV
Units installed with cooling mode TXV require charging by the subcooling method.
- Operate unit a minimum of 15 minutes before checking charge.
- Measure liquid service valve pressure by attaching an accurate gage to service port.
- Measure liquid line temperature by attaching an accurate thermistor type or electronic thermometer to liquid line near outdoor coil.
- Refer to unit rating plate for required subcooling temperature.
- Refer to Table 5. Find the point where required subcooling temperature intersects measured liquid service valve pressure.
- To obtain required subcooling temperature at a specific liquid line pressure, add refrigerant if liquid line temperature is higher than indicated or reclaim refrigerant if temperature is lower. Allow a tolerance of ±3°F (±1.7°C).
Heating Check Chart Procedure
To check system operation during heating cycle, refer to the Heating Check Chart on outdoor unit. This chart indicates whether a correct relationship exists between system operating pressure and air temperature entering indoor and outdoor units. If pressure and temperature do not match on chart, system refrigerant charge may not be correct. Do not use chart to adjust refrigerant charge
Table 5 – Required Liquid Line Temperature
Liquid (PSIG)
Pressure at Service Valve
| Required Subcooling Temperature °F
---|---
6| 8| 10| 12| 14| 16
238| 78| 76| 74| 72| 70| 68
245| 80| 78| 76| 74| 72| 70
252| 82| 80| 78| 76| 74| 72
260| 84| 82| 80| 78| 76| 74
268| 86| 84| 82| 80| 78| 76
276| 88| 86| 84| 82| 80| 78
284| 90| 88| 86| 84| 82| 80
292| 92| 90| 88| 86| 84| 82
301| 94| 92| 90| 88| 86| 84
309| 96| 94| 92| 90| 88| 86
318| 98| 96| 94| 92| 90| 88
327| 100| 98| 96| 94| 92| 90
336| 102| 100| 98| 96| 94| 92
346| 104| 102| 100| 98| 96| 94
355| 106| 104| 102| 100| 98| 96
365| 108| 106| 104| 102| 100| 98
Table 5 – Required Liquid Line Temperature
375 | 110 | 108 | 106 | 104 | 102 | 100 |
---|---|---|---|---|---|---|
385 | 112 | 110 | 108 | 106 | 104 | 102 |
396 | 114 | 112 | 110 | 108 | 106 | 104 |
406 | 116 | 114 | 112 | 110 | 108 | 106 |
417 | 118 | 116 | 114 | 112 | 110 | 108 |
428 | 120 | 118 | 116 | 114 | 112 | 110 |
439 | 122 | 120 | 118 | 116 | 114 | 112 |
450 | 124 | 122 | 120 | 118 | 116 | 114 |
FINAL CHECKS
IMPORTANT: Before leaving job, be sure to do the following:
- Ensure that all wiring is routed away from tubing and sheet met ledges to prevent rub–through or wire pinching.
- Ensure that all wiring and tubing is secure in unit before adding panels and covers. Securely fasten all panels and covers.
- Tighten service valve stem caps to 1/12–turn past finger tight.
- Leave Owner’s Manual with owner. Explain system operation and periodic maintenance requirements outlined in manual.
- Fill out Dealer Installation Checklist and place in customer file.
Repairing Refrigerant Circuit
When breaking into the refrigerant circuit to make repairs, or for any other purpose, the following procedures shall be used.
- Safely remove the refrigerant using a recovery pump certified for flammable refrigerants.
- Purge the refrigerant circuit with nitrogen gas.
- Evacuate the refrigerant circuit to 1500 microns.
- Break vacuum with a nitrogen purge of the refrigerant circuit ensuring that the outlet of the vacuum pump is not near a potential ignition source.
- Open the circuit by cutting or brazing.
Care and Maintenance
For continuing high performance and to minimize possible equipment failure,
periodic maintenance must be performed on this equipment.
Frequency of maintenance may vary depending upon geographic areas, such as
coastal applications. See Users Manual for information.
© 2023 Carrier. All rights reserved.
Edition Date : 12/23
Catalog No : PH5SAN5-01SI
A Proud Member of the Carrier Family Manufacturer reserves the right to
change, at any time, specifications and designs without notice and without
obligations.
Documents / Resources
|
bryant PH5SAN5 Single Stage Heat
Pump
[pdf] Instruction Manual
PH5SAN5 Single Stage Heat Pump, PH5SAN5, Single Stage Heat Pump, Stage Heat
Pump, Heat Pump
---|---
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>