FRANSOUL 10x8ft Outdoor Storage Shed User Guide

June 17, 2024
FRANSOUL

10x8ft Outdoor Storage Shed

STOP
Missing Parts, Questions on Assembly?
Email me: [email protected]
Do not return to dealer they are not equipped to handle your requests.
We will reply to you within 1 business day.

PLAN AHEAD
Before beginning installation, check local building codes regarding footings, location and other requirements.
Study and understand this instruction. Important information and helpful tips will make your installation easier and more enjoyable.
Tools and Materials: There are some basic tools and materials you will need for the installation. Decide which method of anchoring and the type of foundation you wish to use in order
to form a complete list of the materials you will need.

BEFORE YOU BEGIN
Assembly Instruction: Instructions are supplied in this manual and contain all appropriate information for your installation. Review all instructions before you begin, and during assembly, follow the step sequence carefully for correct results.
Parts List: Check to be sure that you have all the necessary parts and quantities in your package. These are packaged within the carton. Note that extra fasteners have been supplied for your convenience.
Explosion Diagram: All parts except screws and bolts are shown in this diagram, review all parts before you begin.
Familiarize yourself with the hardware and fasteners for easier use during installation.

SAFETY PRECAUTIONS…

Safety precautions MUST be followed at all times throughout the construction of your building!

Care must be taken when handling various pieces of your building since many contain sharp edges. Please wear work gloves, eye protection and long sleeves when assembling or performing any maintenance on your building.

Keep children and pets away from the worksite during construction and until the building is completely assembled. This will help avoid distractions and any accidents which may occur.

NEVER concentrate your weight on the roof of the building. When using a step ladder make sure that it is fully open and on even ground before climbing on it.

Practice caution with the tools being used in the assembly of this building. Be especially familiar with the operation of all power tools.

Do NOT attempt to assemble your building on a windy day. The large panels can catch the wind like a “sail”, causing them to be whipped around making construction difficult and unsafe.
Do NOT attempt to assemble your building before double checking that you have all the parts indicated in the parts lists as well as all hardware Any building left partially assembled may be seriously damaged by even light winds.

ASSEMBLY TIPS & TOOLS

Watch the Weather Closely: Be sure the day you choose to install your building is dry and calm.
Do NOT attempt to assemble your building on a windy day. Be careful on wet or muddy ground.
Use Teamwork: Two or more people are required to assemble your building. One person can hold the parts or panels in place while the other person fastens them together and handles the tools. This makes the process of assembling your building faster and safer.
Tools and Materials: Here is a list of some basic tools and materials you will need to assemble your building. Decide which method of anchoring and the type of base you will use to make a complete list of the materials you will need.

  • Work Gloves

  • Safety Glasses

  • Step Ladder

  • No. 2 Phillips Screwdriver (Magnetic Tip Preferred)

  • Utility Knife or Scissors

  • Pliers

  • Carpenter’s Level

  • Tape Measure

  • Power Drill (Cordless, Variable Speed)

  • Nut Driver or Wrench

  • Square

  • String (for squaring the frame)

  • Awl (to align holes)

  • Lumber and/or Concrete

  • Hammer and Nails

  • Spade or Shovel

  • Hand Saw or Power Saw

How to Select and Prepare Your Building Site: Before you start to assemble your building, you will want to decide on a good location. The best location is a level area with good drainage.

  • Allow enough working space so it is not difficult to move parts into position for assembly. Be sure there will be enough space at the entrance for the doors to completely open. Also, there needs to be enough space outside the building to be able to fasten the panel screws from the outside.
  • Before assembling any parts, your base should be constructed and an anchoring system should be ready to use.

Attention: The top plate can be installed in order or reverse order. If there is a deviation between the top plate and the top frame installation hole, it is generally caused by the diagonal size deviation of the frame beam. The diagonal distance of the frame beam can be measured and adjusted.

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals