weka Flat Roof Double Carport Instruction Manual

June 4, 2024
weka

weka logo

Teil 2
Instruction Manual
weka Flat Roof Double Carport

Flat Roof Double Carport

Carports

INSTALLATION, OPERATING, AND MAINTENANCE INSTRUCTIONS

Dear customer, thank you for having chosen a weka product.
Please read these instructions carefully, so as to avoid incorrect installation or damage to the product.
IMPORTANT: Please check the consignment against the pack list to ensure that your weka product has arrived safely and with all components included.

Do keep the pack list together with your receipt until the warranty period has expired, as it enables you to identify parts.
This makes it easier for us to deal with any queries or complaints you might have.
Please note that item numbers in the pack list do not correspond to the item number in this document.
If you sell the product, please hand the installation instructions, the pack list, and any other relevant documents over to the new owner.
These instructions and our products are subject to technical changes without prior notice. Your product might differ slightly from that shown in the illustrations.

Safety information

Foundation
The ground under the weka – product or patio roof must be level and firm.
If you wish to install your weka product near slopes or on top of a basement, please consult a local builder for advice.
Risk of collapse!

Space requirements
The space required for your weka product depends on its size. As the product should be accessible from all sides for regular inspection, keep a clearance of approx. 1.0 to 1.5 m around the product.

Safety instructions and warnings
To prevent accidents during assembly and installation, keep children away from the site.
Children under the age of 14 must at all times keep a distance of a minimum of 3 m from the installation site.
Observe all applicable accident prevention regulations.
For more information, please contact your builder.
To access the roof, always use load-distributing planks.
If you need to carry out work on the roof, use proper equipment (ladders, scaffolding, fall arresters) as required under the
applicable accident prevention regulations.
For detailed instructions, contact your local builder or safety authority. Always work in teams of at least two people!
For the packing of the timber elements and installation, we strongly recommend that you wear safety footwear and protective gloves. When drilling and cutting timber, always wear safety goggles.
Unless specified otherwise in the product data sheet or in static strength calculations, the roof must be cleared in the event of a snow load of 0.68kN/m², which corresponds to approx. 34 cm of snow.

Instructions for installation and use

Transport and storage
The product is shipped on pallets.
After unpacking and checking the consignment according to the pack list, store the components as follows:

Protect untreated timber against

weka Flat Roof Double Carport - Fig

Consequences of incorrect storage:
– Cracks
– Warping and buckling
– Rot and mold growth

Store the timber so that it is protected agains the elements and ensure adequate ventilation!
Timber is a natural product. Differences in color, knotholes and minor cracks are normal and do not impair the strength of the elements.
Extreme weather conditions, such as prolonged hot periods, can cause cracks in the timber caused by shrinkage. These have however no negative effect on the quality of the product but are a natural phenomenon. In many cases, these cracks close again when the weather changes. Shrinkage cracks that are in the direction of the grain of the timber have no effect on the strength of the material.

Packaging
Do not dispose of the packaging through normal household waste! To protect the environment, separate the paper, cardboard, and plastic packaging and dispose of these materials through recycling.
Wood protection
The product is made from untreated timber. The material must therefore be regularly treated with wood protection. For effective wood protection treatment, please consult a specialist dealer.
The responsibility for proper wood protection lies with the customer.
If the timber is not properly protected, the warranty shall be voided.
Please observe the relevant clauses in our warranty terms and conditions.
If you wish to have your product installed by a weka installation team, ensure that all wood preservation work is completed prior to the arrival of the team.

To be observed prior to installation!
Before erecting the construction, contact the local planning authorities to find out whether you need planning permission for your carport on the patio roof.
Check whether the foundation contains power cables or water pipes and locate them.

Preparation
For correct installation, the proper embedding of the H-shaped post anchors in the concrete foundation is indispensable. The post anchors are available as accessories from weka.
The foundation plan is available from your specialist dealer!
The required roof pitch of a minimum of 1% (sloping towards the back of the construction) is produced by adjusting the height of the post anchors.
Alternatively, shorten the posts accordingly.
After leveling the ground, measure the foundation (height, width, length) and prepare it for installation.
To facilitate the exact positioning and alignment of the anchors, mark the post positions on the lath and secure the anchors with screw clamps to the lath.
Then position the anchors in the holes in the foundation, keeping a minimum distance of 2 cm between the upper edge of the foundation and the upper brace.
Fill the holes with B25 concrete and let the foundation cure for a minimum of 3 days.
Where timber elements are placed directly on the foundation (e.g. rear walls, equipment rooms, etc.), install a damping course (e.g. roofing felt) between the foundation and the timber to prevent rising dampness.
The damp-proofing material is not included in the scope of supply.
To prevent wind damage, secure the floor joists and the vertical posts to the foundation, using concrete anchors or steel brackets and heavy-duty screw anchors. The anchoring materials are not included in the scope of delivery.

Patio roofs
Depending on the wall construction of the main building, choose a suitable method to secure the base or coupling stringer to the wall. This construction must be made with fixtures that are suitable as regards the static strength requirements and the wall construction (see technical data of fixtures). Permissible V=1.77kN/m. The fixtures to secure the timber elements to the wall of the existing building are not included in the scope of delivery.
To be observed during installation!
For the installation of your weka product, you must work in teams of a minimum of 2 people.
All screw connections must be pre-drilled to prevent damage to the timber elements!
This symbol in the instruction document reminds you to pre-drill:

To ensure perpendicularity, measure the diagonals and correct the position until the measured values are the same.

Roof panels
Prior to installation, store the panels under a roof or keep them covered so that they are protected from direct sunlight!
White foil has proven particularly suitable for this purpose. If several panels are stacked one on top of the other, they might become deformed or discolored due to excess heat.
The panels must be installed at a temperature between +5°C and 30°C.
To ensure that the roof is tight, seal the panels with silicon (not included in the scope of delivery).
To secure the roof panels, pre-drill them with a 10 mm drill!
With two-colored roof panels, the dark side must be the bottom side.
Do not fully tighten the screws as the panels need to settle.
Important: Do not install a false floor or thermal insulation under the roof panels, as this would impair proper ventilation!
To prevent heat build-up under transparent roof panels, paint the upper side of the stringers with white dispersion or clad them in aluminum foil (not included in the scope of delivery). Heat build-up can cause cracks in the panels.

IMPORTANT! When installing additional partition walls, storage rooms, or wall coverings at a later stage, always ensure that air circulation under the roof panels is not in any way restricted, as this could result in heat build- up and damage to the roof panels.
Above all walls, keep a gap of a minimum of 20 cm to the wall panels.

Roof boarding
Where the roof is clad with tongued and grooved boards, do not push the boards together too tightly, as the boards will swell slightly when exposed to moisture,
The roofing felt supplied with your product provides some protection against the elements but is not suitable as a permanent roof cover. To make your construction weatherproof, you must install a second layer (e.g. bitumen felt or shingles).
Otherwise, your weka product will be damaged over time.

Note
Regularly check all screws and re-tighten them, if necessary. This product consists mainly of solid timber elements. As timber is a natural product, it might shrink, so screw connections become loose.
Tools
The following tools are required on-site prior to installation.

weka Flat Roof Double Carport - Tools

Abbreviations / symbols:

50 (60) – The dimensions in brackets are the foundation dimensions (in cm) for a three-sided carport, using weka partitions or storage rooms (accessories).

RW – Rear wall

weka Flat Roof Double Carport - Rear wall

Warranty terms of weka Holzbau GmbH
We guarantee the function of our products for 5 years from the date of delivery, subject to the conditions laid down below. Our warranty covers only the wooden parts of our products (hereafter referred to as the weka product). Within the warranty period, we will replace missing or defective parts of the weka product. The warranty extends only to the free-of-charge replacement of the respective faulty or defective wooden part. The warranty does not cover any consequential or additional costs, in particular no delivery and installation or modification costs.

The warranty is void in case of:

  • failure to follow the assembly instructions,
  • changes (additions or modifications) made to the product diverging from the assembly instructions,
  • load limits (e.g. snow load, etc.) having been exceeded, the weka product having been installed on an incorrect foundation or floor plate, etc., in particular in cases of violation of the rules of architecture, insufficient or inadequate care/maintenance (wood preservation, coating, etc.) wind speeds stronger than force 7 (moderate gales), natural catastrophes or brute force has caused the damage to the weka product, the deficiency consists in changes that are typical for wood, such as discoloration, formation of cracks, warping, shrinking, swelling or similar normal effects on the material “wood”.

Warranty claims must be accompanied by the original packing slip and the original sales receipt and must be submitted within the warranty period in writing or by fax or e-mail.  A further prerequisite for a claim is immediate notification of the defect or damage in the form of pictures and a written description of the defect.

Address all warranty claims to:
weka Holzbau GmbH
17034 Neubrandenburg, Germany
Johannesstrasse 16
Fax: +49(0)395/42908-83
e-mail: [email protected]

Term and conditions for installation by weka team
If you wish to have your product installed by an installation team of weka Holzbau GmbH, the following terms and conditions apply:
The term “installation” refers to the proper assembly and erection of the supplied parts and their installation on site, not including wood preservation and coating, or the supply and installation of accessories.
Installation does not include electrical connections.
All installation materials must be available at the site.
Ensure that all product parts are within 10 to 15 m of the actual installation site and do not need to be carried to another floor, as such work is not included in the quoted price for the installation. The foundation for your construction must have the necessary load-bearing capacity and be horizontal and level.
The following standard applies DIN 18202 “Tolerances in building construction”, table 3, row 3; maximum height difference between two furthest points of approx. 10 to 11  mm.
All preparatory work must be completed according to best practice and prior to the weka team arriving on site. The foundation/floors prepared by you must be suitable for the installation of your product.
We wish you many years of pleasure with your weka product!

Foundation plan Carport
External carport dimensions cut
1% gradient C25/30 concrete
Screw frost-free base
9 x 9atud H anchor
Plan We reserve the rig ht b make technical alterations.
 load-bearing foundation Figures h brackets for a 3-sided solid carport for

additional Installation of walls and storage room from weka accessory sets
Vertical co v e r/ hipped Cover

weka Holzbau GmbH,
Johannesstr. 16
D-17034 Neubrandenburg
Tel. : +49 (0)395 42908-0
Fax : +49 (0)395 42908-83
Mail: [email protected]
Web: www.weka-holzbau.com
MA Art.-Nr.: 800.0286.20.41

Techn. Änderungen vorbehalten!
Alle Maßangaben sind ca. Maße.
Copyright HRB 3662

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

weka User Manuals

Related Manuals