SUNSYNK SYNK-8K-SG04LP3 Three Phase Hybrid Inverter Instruction Manual

June 15, 2024
SUNSYNK

SYNK-8K-SG04LP3 Three Phase Hybrid Inverter

Product Information

Specifications

  • Model: SYNK-8K-SG04LP3 / SYNK-10K-SG04LP3 /
    SYNK-12K-SG04LP3

  • Manufacturer: Global Tech China Ltd

  • Address: 3 Floor, Wai Yip Industrial Building, 171 Wai Yip
    Street, Kwun Tong, Kowloon, Hong Kong

  • Contact: Tel: +852 2884 4318, Fax: +8522884 4816, Email:
    sales@sunsynk.com

  • Version: v.29 (03/28/23)

Product Usage Instructions

Safety

This device should only be used in accordance with the
instructions within this manual and in compliance with local,
regional, and national laws and regulations. Only allow this device
to be installed, operated, maintained, and repaired by other
person(s) who have read and understood this manual. Ensure the
manual is included with this device should it be passed to a third
party.

DO NOT allow minors, untrained personnel, or person(s) suffering
from a physical or mental impairment that would affect their
ability to follow this manual, install, maintain or repair this
device.

Any untrained personnel who might get near this device while it
is in operation MUST be informed that it is dangerous and
instructed carefully on how to avoid injury.

Product Introduction

The Three-Phase Hybrid Inverter is a high-power inverter
designed for use in residential and commercial applications. It
combines solar power generation, battery storage, and grid supply
capabilities to provide a reliable and efficient energy
solution.

System Overview

The system consists of the Three-Phase Hybrid Inverter, PV
modules, batteries, and various connection components. It allows
for the utilization of solar energy, battery storage, and grid
supply to power electrical loads.

Product Size

The size of the Three-Phase Hybrid Inverter depends on the
model:

  • SYNK-8K-SG04LP3: [Size]
  • SYNK-10K-SG04LP3: [Size]
  • SYNK-12K-SG04LP3: [Size]

Features

  • [Feature 1]
  • [Feature 2]
  • [Feature 3]

Basic System Architecture

The basic system architecture of the Three-Phase Hybrid Inverter
includes PV module input, battery input, grid input, and load
output. The inverter manages the power flow between these
components to optimize energy usage and ensure a stable power
supply.

Technical Specifications

Here are the technical specifications of the Three-Phase Hybrid
Inverter:

  • [Specification 1]
  • [Specification 2]
  • [Specification 3]

Installation

Parts List

Before starting the installation process, ensure that you have
all the necessary parts. The parts list for the Three-Phase Hybrid
Inverter installation includes:

  • [Part 1]
  • [Part 2]
  • [Part 3]

Selecting the Mounting Area

Choose a suitable location for mounting the Three-Phase Hybrid
Inverter. Consider factors such as proper ventilation,
accessibility, and protection from environmental elements. Ensure
that the mounting area meets the specified requirements in the
manual.

Mounting the Inverter

Follow these steps to mount the Three-Phase Hybrid Inverter:

  1. [Step 1]
  2. [Step 2]
  3. [Step 3]

Function Port Definition

The function ports of the Three-Phase Hybrid Inverter serve
different purposes. Refer to the manual for the detailed definition
and usage of each function port.

Battery Connection

To connect the battery to the Three-Phase Hybrid Inverter,
follow these steps:

  1. [Step 1]
  2. [Step 2]
  3. [Step 3]

Temperature Sensor Connection for Lead-Acid Battery

If you are using a lead-acid battery, connect the temperature
sensor as per the instructions provided in the manual.

Connecting the AC and Backup Load Connection

For connecting the AC and backup loads, refer to the manual for
detailed instructions.

Connecting the CT Coil

The CT coil is used for current measurement. Follow the manual
instructions to connect the CT coil properly.

Meter Connection

If you are using a CHNT meter, follow the system connection
instructions provided in the manual.

Earth Connection (MANDATORY)

Ensure proper earth connection for the Three-Phase Hybrid
Inverter. Failure to do so may result in electrical hazards. Follow
the manual instructions for earth connection.

PV Connection

For connecting PV modules to the inverter, follow these
steps:

  1. [Step 1]
  2. [Step 2]
  3. [Step 3]

PV Module Selection

When selecting PV modules, consider factors such as power
rating, voltage, and compatibility with the inverter. Refer to the
manual for guidelines on PV module selection.

PV Module Wiring

Follow the wiring instructions provided in the manual to connect
the PV modules to the inverter.

Wiring System for the Inverter

The inverter requires a proper wiring system to ensure safe and
efficient operation. Consult the manual for detailed instructions
on setting up the wiring system.

Wiring Diagram

Refer to the provided wiring diagram in the manual for a visual
representation of the wiring connections.

Typical Application Diagram of Diesel Generator

If you are using a diesel generator in conjunction with the
Three-Phase Hybrid Inverter, consult the manual for a typical
application diagram.

Three Phase Parallel Connection Diagram

If you need to connect multiple Three-Phase Hybrid Inverters in
parallel, refer to the parallel connection diagram provided in the
manual.

Operation

Display

The Three-Phase Hybrid Inverter features a display panel that
provides information about the system status and allows for
configuration settings. Familiarize yourself with the display and
its functions as described in the manual.

Switching ON/OFF

To switch the Three-Phase Hybrid Inverter ON/OFF, follow the
specified procedure outlined in the manual.

Home Page

The Home Page on the display provides an overview of the system
status and key information. Refer to the manual for a detailed
explanation of the Home Page features.

Status Page

The Status Page displays real-time information about the system
operation and performance. Consult the manual for a comprehensive
description of the Status Page.

System Flow Page

The System Flow Page illustrates the power flow within the
system. Review the manual to understand how to interpret and
utilize the information displayed on the System Flow Page.

Setup Page

The Setup Page allows for configuration settings of various
parameters. Follow the instructions in the manual to navigate and
modify settings on the Setup Page.

Set Time (Clock)

Set the time on the Three-Phase Hybrid Inverter’s clock
according to your local time zone. The manual provides instructions
on how to set the time accurately.

Set Company Name / Beeper / Auto dim

Customize the display settings by setting the company name,
enabling or disabling the beeper sound, and configuring auto
dimming features. Follow the manual instructions to adjust these
settings.

Factory Reset and Lock Code

If necessary, perform a factory reset on the Three-Phase Hybrid
Inverter to restore default settings. The manual also explains how
to set a lock code for security purposes.

Battery Setup Page

Access the Battery Setup Page to configure battery-related
settings. Consult the manual for detailed instructions on using the
Battery Setup Page.

Generator & Battery Page

The Generator & Battery Page provides options for
configuring the interaction between the generator and the battery.
Refer to the manual for guidance on using the Generator &
Battery Page.

Battery Discharge Page

Manage battery discharge settings using the Battery Discharge
Page. The manual explains how to adjust the discharge parameters
effectively.

Setting Up a Lithium Battery

If you are using a lithium battery, follow the instructions in
the manual to set up the Three-Phase Hybrid Inverter for
compatibility with lithium battery technology.

Program Charge & Discharge Times

Customize the charge and discharge times of the battery
according to your specific requirements. The manual provides
instructions on programming charge and discharge times.

Grid Supply Page

The Grid Supply Page allows for configuration settings related
to grid supply operations. Refer to the manual for guidance on
using the Grid Supply Page.

Advanced Settings for Paralleling Inverters

If you have multiple Three-

THREE-PHASE HYBRID INVERTER

INSTALLER MANUAL
SYNK-8K-SG04LP3 / SYNK-10K-SG04LP3 / SYNK-12K-SG04LP3
Global Tech China Ltd, 3 Floor, Wai Yip Industrial Building. 171 Wai Yip Street, Kwun Tong, Kowloon, Hong Kong. Tel: +852 2884 4318 Fax: +8522884 4816 www.sunsynk.com / sales@sunsynk.com

v.29 (03/28/23)

PLEASE RETAIN FOR FUTURE REFERENCE

PREFACE
This Installer Manual contains information for proper installation, operation, maintenance, and care of the Sunsynk Three-Phase Hybrid Inverter. A deep understanding of the instructions described in this document will help you get the most out of your new inverter. This document should be read thoroughly, and all the procedures described in this manual should be followed carefully. If you have questions or concerns about this product’s operation and maintenance, please get in touch with our customer support. All personnel involved in this machine’s installation, setup, operation, maintenance, and repair should read and understand this manual, mainly its safety instructions. Substandard performance and longevity, property damage, and personal injury may result from not knowing and following these instructions. In order to ensure long product life, Sunsynk recommends that you utilize the product and perform maintenance by correctly following the instructions described in this guide. The manufacturer’s warranty does not cover any damage resulting from the neglect of these instructions. Sunsynk assumes no liability for damage caused by the operation contrary to what is specified in this operating manual. All information in this User Guide is based on the latest product information available at the time of printing approval. Sunsynk reserves the right to make changes at any time without notice and without incurring any obligation. Please always keep this manual with the inverter as a reference for everyone using this product.
2 THREE PHASE HI 8~12kW | Installer Manual

Table of Contents

1.SAFETY

6

1.1.General Safety

6

1.2.Symbols

6

1.3.Safety Instructions

7

1.4.Disposal Remarks

7

2.PRODUCT INTRODUCTION

8

2.1.System Overview

8

2.2.Product Size

9

2.3.Features

10

2.4.Basic System Architecture

11

3.TECHNICAL SPECIFICATIONS

12

4.INSTALLATION

15

4.1.Parts List

15

4.2.Selecting the Mounting Area

16

4.3.Mounting the Inverter

17

4.4.Function Port Definition

19

4.5.Battery Connection

20

4.5.1.Temperature Sensor Connection for Lead-Acid Battery

21

4.5.2.Connecting the AC and Backup Load Connection

22

4.6.Connecting the CT Coil

24

4.7.Meter Connection

25

4.7.1.System Connection for the CHNT Meter

25

4.8.Earth Connection (MANDATORY)

25

4.9.PV Connection

27

4.9.1.PV Module Selection

27

4.9.2.PV Module Wiring

27

4.10.Wiring System for the Inverter

29

4.11.Wiring Diagram

32

4.12.Typical Application Diagram of Diesel Generator

33

4.13.Three Phase Parallel Connection Diagram

34

3 THREE PHASE HI 8~12kW | Installer Manual

5.OPERATION

35

5.1.Display

35

5.2.Switching ON/OFF

35

5.3.Home Page

36

5.4.Status Page

36

5.5.System Flow Page

37

5.6.Setup Page

38

5.7.Set Time (Clock)

39

5.8.Set Company Name / Beeper / Auto dim

39

5.9.Factory Reset and Lock Code

40

5.10.Battery Setup Page

41

5.11.Generator & Battery Page

42

5.12.Battery Discharge Page

44

5.13.Setting Up a Lithium Battery

46

5.14.Program Charge & Discharge Times

53

5.15.Grid Supply Page

55

5.16.Advanced Settings for Paralleling Inverters

56

5.17.Solar Power Generated

59

5.18.Grid Power

59

5.19.Advanced Settings for Wind Turbines

60

5.20.Advanced Settings for Auxiliary Load

61

5.21.Advanced Settings for Peak Shaving

63

5.22.Fault Codes

63

5.23.Operation Modes

66

5.23.1.MODE I: Basic

66

5.23.2.MODE II: With Generator

66

5.23.3.MODE III: With Smart-Load

67

5.23.4.MODE IV: AC Couple

67

6.COMMISSIONING

68

6.1.Start-Up / Shutdown Procedure

68

6.2.Information for Commissioning the Inverter

68

6.3.GDFI Fault

69

7.MAINTENANCE

69

APPENDIX A

70

4 THREE PHASE HI 8~12kW | Installer Manual

APPENDIX B

70

APPENDIX C

70

APPENDIX D

70

APPENDIX E

71

5 THREE PHASE HI 8~12kW | Installer Manual

1.SAFETY
1.1.General Safety
This device should only be used in accordance with the instructions within this manual and in compliance with local, regional, and national laws and regulations. Only allow this device to be installed, operated, maintained, and repaired by other person(s) who have read and understood this manual. Ensure the manual is included with this device should it be passed to a third party.
DO NOT allow minors, untrained personnel, or person(s) suffering from a physical or mental impairment that would affect their ability to follow this manual, install, maintain or repair this device.
Any untrained personnel who might get near this device while it is in operation MUST be informed that it is dangerous and instructed carefully on how to avoid injury.

1.2.Symbols

WARNING CAUTION PLEASE NOTE

This symbol indicates information that if ignored, could result in personal injury or even death due to incorrect handling. This symbol indicates information that if ignored, could result in personal injury or physical damage due to incorrect handling.
Indicates information that is considered important, but not hazard-related.

6 THREE PHASE HI 8~12kW | Installer Manual

1.3.Safety Instructions
WARNING HIGH LIFE RISK DUE TO FIRE OR ELECTROCUTION.
Sunsynk Three-Phase Hybrid Inverter can only be installed by a qualified licensed electrical contractor. This is not a DIY product.
Be sure to read this manual thoroughly before installation. Do not attempt to install the inverter by yourself. Installation work must be carried out in compliance
with national wiring standards and by suitably qualified personnel only. Do not turn on the power until all installation work is complete. Do not disassemble the inverter. If you need repair or maintenance, contact a professional service centre. Always use an individual power supply line protected by a circuit breaker and operating on all wires with a distance between contacts of at least 3mm for this unit. The unit must be correctly grounded, and the supply line must be equipped with a suitable breaker and RCD to protect people. Disconnect all wires/cables before performing any maintenance or cleaning to reduce the risk of electrical shock. The unit is not explosion-proof, so it should not be installed in an explosive atmosphere. Never touch electrical components immediately after the power supply has been turned off since the system can still have residual energy, so an electric shock may occur. Therefore, after turning off the power, always wait 5 minutes before touching electrical components. This unit contains no user-serviceable parts. Always consult an authorised contractor for repairs.
1.4.Disposal Remarks
DO NOT dispose this product with domestic waste! Electrical devices should be disposed of in accordance with regional directives on electronic and/ or electronic-waste disposal. In case of further questions, please consult your supplier. In some cases, the supplier can take care of proper disposal.
7 THREE PHASE HI 8~12kW | Installer Manual

2.PRODUCT INTRODUCTION
The Sunsynk Three-Phase Hybrid Inverter is a highly efficient power management tool that allows the user to hit those `parity’ targets by managing power-flow from multiple sources such as solar, mains power (grid) and generators, and then effectively storing and releasing power as and when utilities require.
2.1.System Overview

1. Inverter Indicators 2. LCD Display 3. Function Buttons 4. Power on/off button 5. DC switch 6. Parallel port

7. Meter-485 port 8. Battery input connectors 9. Function Port 10. Modbus Port 11. BMS Port 12. PV input with two MPPT

13. Grid 14. Load 15. Generator input 16. Wi-Fi Interface

8 THREE PHASE HI 8~12kW | Installer Manual

2.2.Product Size
9 THREE PHASE HI 8~12kW | Installer Manual

2.3.Features
INTERACTIVE Easy and straightforward to understand LCD display; Supporting Wi- Fi or GSM monitoring; Visual power flow screen; Built-in 2 strings for 1 MPP tracker and 1 string for 1 MPP tracker; Smart settable 3-stage MPPT charging for optimised battery performance; Auxiliary load function; Multi-inverter function: grid-tied and off-grid; COMPATIBLE Compatible with mains electrical grid voltages or power generators; Compatible with wind turbines; 230V/400V Three-phase Pure Sine-wave Inverter; It can power up both single-phase and 3-phase loads; Self-consumption and feed-in to the grid; Auto restart while AC is recovering; Maximum charging/discharging current of 190A (8kW), 210A (10kW), and 240A (12kW); DC and AC coupled to retrofit existing solar system; Compatible with a 48V low-voltage battery; CONFIGURABLE Fully programmable controller; Programmable supply priority for battery or grid; Programmable multiple operation modes: on-grid/off-grid & UPS; Configurable battery charging – current/voltage based on applications by LCD setting; Configurable AC / solar / generator charger priority by LCD setting; 6 time periods for battery charging/discharging; SECURE Overload/over-temperature/short-circuit protection; Smart battery charger design for optimised battery protection; Limiting function installed to prevent excess power overflow to the grid; Isolation transformer design; APPLICATIONS Marine (vessel power management); Power shedding (home/office/factory); UPS (fuel-saving systems); Remote locations with solar and wind generators; Building sites; Telecommunication;
10 THREE PHASE HI 8~12kW | Installer Manual

2.4.Basic System Architecture
The following diagram explains the basic application and architecture of this 3-Phase Inverter. It also includes the following devices to have a Complete running system. Generator or Utility PV modules Batteries Normal and smart loads Monitoring system Consult with your system integrator for other possible system architectures depending on your requirements. This inverter can power all kinds of appliances in the home or one environment, including motor-type appliances such as refrigerators and air conditioners.
11 THREE PHASE HI 8~12kW | Installer Manual

3.TECHNICAL SPECIFICATIONS

Model Product Type Enclosure Ambient Temperature Protection Level Charge Mode Battery Voltage Battery Current AC Input Voltage AC Input Frequency AC Input Rated Current Max. AC Input Current Max. AC Input Power Max. Apparent Output Power PV Input Voltage MPPT Input Voltage PV Input Current Max. PV Input Power Max. PV Isc Utility-Interactive AC Output Voltage AC Output Frequency AC Output Rated Current Max. AC Output Current Max. AC Output Power AC Output Rated Power AC Output Power Factor Max. AC Isc Battery Discharge Voltage Battery Discharge Current Battery Discharge Power Stand Alone AC Output Voltage AC Output Frequency AC Output Rated Current AC Output Rated Power Max. Continuous AC Pass-through Current Battery Discharge Voltage Max. Discharge Current
Compliance

SYNK-8K-SG04LP3 Hybrid Inverter IP65
-40~60ºC, >45ºC Derating Class I
48Vd.c (40Vd.c ~ 60Vd.c) 190Ad.c (max.)
3L/N/PE 220/380Va.c, 230/400Va.c 50/60Hz
12.1/11.6A 13.4/12.8A
8800W 8800VA 550Vd.c (160Vd.c ~ 800Vd.c) 200Vd.c ~ 650Vd.c 13Ad.c + 13Ad.c 10400W 17Ad.c + 17Ad.c
3L/N/PE 220/380Va.c, 230/400Va.c 50/60Hz
12.1/11.6A 13.4/12.8A
8800W 8000W 0.95 leading to 0.95 lagging 75Aa.c 40Vd.c ~ 60Vd.c 190Ad.c (max.) 8000W
3L/N/PE 220/380Va.c, 230/400Va.c 50/60Hz
12.1/11.6A 8000W
45Aa.c
40Vd.c ~ 60Vd.c 190A (max.)
VDE-AR-N 4105:1028-11; DINVDE V 0124-100:2020-06; IEC/ EN62109-1/2:2010; IEC/EN62109-1/2:2011

12 THREE PHASE HI 8~12kW | Installer Manual

Model Product Type Enclosure Ambient Temperature Protection Level Charge Mode Battery Voltage Battery Current AC Input Voltage AC Input Frequency AC Input Rated Current Max. AC Input Current Max. AC Input Power Max. Apparent Output Power PV Input Voltage MPPT Input Voltage PV Input Current Max. PV Input Power Max. PV Isc Utility-Interactive AC Output Voltage AC Output Frequency AC Output Rated Current Max. AC Output Current Max. AC Output Power AC Output Rated Power AC Output Power Factor Max. AC Isc Battery Discharge Voltage Battery Discharge Current Battery Discharge Power Stand Alone AC Output Voltage AC Output Frequency AC Output Rated Current AC Output Rated Power Max. Continuous AC Pass-through Current Peak Output Power Battery Discharge Voltage Max. Discharge Current
Compliance

SYNK-10K-SG04LP3 Hybrid Inverter IP65
-40~60ºC, >45ºC Derating Class I
48Vd.c (40Vd.c ~ 60Vd.c) 210Ad.c (max.)
3L/N/PE 220/380Va.c, 230/400Va.c 50/60Hz
15.2/14.5A 16.7/15.9A
11000W 11000VA 550Vd.c (160Vd.c ~ 800Vd.c) 200Vd.c ~ 650Vd.c 26Ad.c + 13Ad.c 13000W 34Ad.c + 17Ad.c
3L/N/PE 220/380Va.c, 230/400Va.c 50/60Hz
15.2/14.5A 16.7/15.9A
11000W 10000W 0.95 leading to 0.95 lagging 75Aa.c 40Vd.c ~ 60Vd.c 210Ad.c (max.) 10000W
3L/N/PE 220/380Va.c, 230/400Va.c 50/60Hz
15.2/14.5A 10000W
45Aa.c
20000W (10 seconds) 40Vd.c ~ 60Vd.c 210A (max.)
VDE-AR-N 4105:1028-11; DINVDE V 0124-100:2020-06; IEC/ EN62109-1/2:2010; IEC/EN62109-1/2:2011

13 THREE PHASE HI 8~12kW | Installer Manual

Model Product Type Enclosure Ambient Temperature Protection Level Charge Mode Battery Voltage Battery Current AC Input Voltage AC Input Frequency AC Input Rated Current Max. AC Input Current Max. AC Input Power Max. Apparent Output Power PV Input Voltage MPPT Input Voltage PV Input Current Max. PV Input Power Max. PV Isc Utility-Interactive AC Output Voltage AC Output Frequency AC Output Rated Current Max. AC Output Current Max. AC Output Power AC Output Rated Power AC Output Power Factor Max. AC Isc Battery Discharge Voltage Battery Discharge Current Battery Discharge Power Stand Alone AC Output Voltage AC Output Frequency AC Output Rated Current AC Output Rated Power Max. Continuous AC Pass-through Current Peak Output Power Battery Discharge Voltage Max. Discharge Current
Compliance

SYNK-12K-SG04LP3 Hybrid Inverter IP65
-40~60ºC, >45ºC Derating Class I
48Vd.c (40Vd.c ~ 60Vd.c) 240Ad.c (max.)
3L/N/PE 220/380Va.c, 230/400Va.c 50/60Hz
18.2/17.4A 20/19.1A 13200W 13200VA 550Vd.c (160Vd.c ~ 800Vd.c) 200Vd.c ~ 650Vd.c 26Ad.c + 13Ad.c 15600W 34Ad.c + 17Ad.c
3L/N/PE 220/380Va.c, 230/400Va.c 50/60Hz
18.2/17.4A 20/19.1A 13200W 12000W 0.95 leading to 0.95 lagging
75Aa.c 40Vd.c ~ 60Vd.c 240Ad.c (max.)
12000W
3L/N/PE 220/380Va.c, 230/400Va.c 50/60Hz
18.2/17.4A 12000W
45Aa.c
24000W (10 seconds) 40Vd.c ~ 60Vd.c 240A (max.)
VDE-AR-N 4105:1028-11; DINVDE V 0124-100:2020-06; IEC/ EN62109-1/2:2010; IEC/EN62109-1/2:2011

14 THREE PHASE HI 8~12kW | Installer Manual

4.INSTALLATION
4.1.Parts List
Check the equipment before installation. Please make sure nothing is damaged in the package. You should have received the items in the following package:

Hybrid Inverter x1

Wall Mounting Bracket x1

Stainless steel anti-collision bolt M8x80 x4

Parallel communication cable x1

L-type Hexagon wrench x1

Battery Temperature Sensor x1

User manual x1

Wi-Fi-Plug x1 (Optional)

Meter x1 (Optional)

Sensor Clamp x3
15 THREE PHASE HI 8~12kW | Installer Manual

4.2.Selecting the Mounting Area
For proper heat dissipation, allow a clearance of approximately 500mm to the side, 500mm above and below the unit, and 1000mm to the front of the unit.
500mm
500mm DO NOT install the inverter in the following areas: Areas with high salt content, such as the marine environment. It will deteriorate the metal parts and
possibly lead to water/dampness penetrating the unit. Areas filled with mineral oil or containing splashed oil or steam, such as those found in kitchens. It will
deteriorate plastic parts of the unit, causing those parts to fail or allowing water/damp to penetrate the unit. Areas that generate substances that adversely affect the equipment, such as sulphuric gas, chlorine gas, acid, or alkali. These can cause the copper pipes and brazed joints to corrode and fail to conduct electricity reliably. Areas that can cause combustible gas to leak, which contains suspended carbon-fibre or flammable dust, or volatile inflammable such as paint thinner or gasoline. Areas where there may be gas leaks and where gas may settle around the unit as this is a fire risk. Areas where animals may urinate on the unit or ammonia may be generated. High altitude areas (over 4000 metres above sea level). Environments where precipitation or humidity is above 95% Areas where the air circulation is too low. ALSO CONSIDER: Installing the indoor unit, outdoor unit, power supply cable, transmission cable, and remote control cable at least 1 metre away from any television or radio receiver. This will prevent TV reception interference or
16 THREE PHASE HI 8~12kW | Installer Manual

radio noise. This will prevent radio signal interference from external units that might interfere with the Wi-Fi or GSM monitoring. If children under 10 years old may approach the unit, take preventive measures so they cannot reach and touch the unit. Install the indoor unit on the wall where the floor height is higher than 1600mm. Before connecting all wires, please take the metal cover off, removing the screws as shown below:
4.3.Mounting the Inverter
Select installation locations that are adequate to support the weight of the converter. Install this inverter at eye level to allow the LCD to be read anytime. To ensure optimal operation, an appropriate ambient temperature is between -25 and 60°C. Be sure to keep other objects and surfaces, as shown in the figure to guarantee sufficient heat
dissipation and have enough space to remove wires. For proper air circulation to dissipate heat, allow a clearance of approximately 50cm to the side.
WARNING Risk of injury (Heavy Object).
Remember that this inverter is heavy (45kg), so users must carefully handle the unit during installation, especially when mounting or removing it from a wall.
Choose the recommended drill head(as shown below) to drill 4 holes on the wall, 82-90mm deep. 1. Use a proper hammer to fit the expansion bolt into the holes. 2. Carry the inverter and hold it, ensure the hanger aims at the expansion bolt, and fix the inverter on
the wall. 3. Fasten the screw head of the expansion bolt to finish the mounting.
17 THREE PHASE HI 8~12kW | Installer Manual

18 THREE PHASE HI 8~12kW | Installer Manual

4.4.Function Port Definition
Inverter
Dry contact output. When the inverter is in off-grid mode and the signal “Island mode” is checked, the dry contact will switch on.
reserved. RSD (7,8): When battery is connected and the inverter is in “ON” status, it will provide 12Vdc.
19 THREE PHASE HI 8~12kW | Installer Manual

4.5.Battery Connection

For safe operation and compliance, an individual DC overcurrent protector or disconnection device is required to connect the battery and the inverter. Users are recommended to utilise a suitable fuse and DC isolator (see next page). Switching devices may not be required in some applications, but overcurrent protectors must be used. Please refer to the typical amperage in the table below for the required fuse or circuit breaker size.

Model 8kW 10kW 12kW

Wire Size 1AWG 10 AWG 10 AWG

Cable (mm2 ) 50 50 50

Torque value (max.) 24.5N.m 24.5N.m 24.5N.m

Please follow the below steps to implement battery connection:
1. Please choose a suitable battery cable (appropriate rating) with the correct connector to attach to the battery terminals.
2. Use a suitable screwdriver that matches the bolt size to unscrew the bolts to fit the battery connectors. Then tighten the bolts with the connectors in place with a torque of 24.5N.m in a clockwise direction.
3. Make sure the polarity is correct at both the battery and inverter terminals.

29.54mm

30mm

30mm

Battery connector screw size: M10.

CAUTION
Reverse Polarity. Before making the final DC connection or closing DC breaker/disconnect, be sure positive (+) must be connected to the positive (+) and negative (-) must be connected to the negative (-). A reverse polarity connection on the battery will damage the inverter.

CAUTION
All wiring/connecting must be performed by qualified personnel. In addition, connecting the battery with a suitable cable is essential for safe and efficient operation of the system
20 THREE PHASE HI 8~12kW | Installer Manual

4.5.1.Temperature Sensor Connection for Lead-Acid Battery
Without a remote temperature sensor, lead-acid batteries may undercharge or overcharge depending on the ambient temperature of the installation environment. This may result in a fire hazard.
PLEASE NOTE
Depending on the battery type, the inverter should be capable of controlling the battery BMS. Therefore, you need to set the protocol of the BMS on both the battery and the inverter. When using more than one battery, the first battery will be the master, and the other batteries will be the slaves. Please, check the battery manufacturer’s specifications for proper operation. To verify if the battery is communicating, access the Li-BMS menu as detailed in section 5.13, ‘Setting Up a Lithium Battery’, and check whether the values are realistic. It is important that the charge and discharge limits on that page match the numbers expected for the number of connected batteries. 21 THREE PHASE HI 8~12kW | Installer Manual

4.5.2.Connecting the AC and Backup Load Connection
Before connecting to the main grid, please install a separate AC Breaker (MCB) between the inverter and the grid. In addition, it is recommended the installation of an AC Breaker between the backup load and inverter. This will ensure the inverter can be disconnected safely during maintenance and fully protect the system from over-current. The recommended AC Breaker is 20A for 8kW, 32A for 10kW and 32A for 12kW. There are three terminal blocks marked as GRID, LOAD, and GEN. Please do not confuse input and output connections.

GEN/AUX GRID LOAD

Generator connection. This works like a conventional grid-tied inverter. It is both an input and output
connection for non-essential load and supply. Connection of essential loads such as lighting, security systems, and Internet

Model 8/10/12kW

Wire Size 10 AWG

Cable (mm2 ) 6

Torque value (max.) 1.2N.m

CAUTION
All wiring and cable sizes must comply with your particular country’s wiring regulations and Codes of Practices. Ensure that suitable disconnection devices and RCDs are fitted.
Please follow the steps below to implement GRID, LOAD, and GEN port connections: 1. Before making GRID, LOAD, and GEN port connections, make sure to turn off the AC breaker or
disconnector first. 2. Remove a 10mm sleeve from each wire, unscrew the bolts, insert the cables according to the polarities
indicated on the terminal block and tighten the terminal screws. Ensure the connection is complete.

3. Then, insert AC output wires according to the polarities indicated on the terminal block and tighten the terminal. Make sure to connect corresponding N wires and PE wires to related terminals as well.
4. Ensure the wires are securely connected.
22 THREE PHASE HI 8~12kW | Installer Manual

5. Check that the AC power source is isolated before attempting to connect it to the inverter. Insert AC output wires according to the polarities indicated on the terminal block and tighten the terminal screws. Be sure to connect the corresponding N wires and PE wires to the correct terminals and ensure the wires are securely connected.
CAUTION
Ensure the AC power source is disconnected before attempting to wire it to the unit.
PLEASE NOTE
Appliances such as air conditioners require 2-3 minutes to restart as they need enough time to balance refrigerant gas inside the circuit. Suppose a power shortage occurs and recovery is made in a short time. In that case, it will cause damage to your connected appliances. In order to prevent this kind of damage, please check with the manufacturer of the air conditioner to confirm if the unit is equipped with a time-delay function before installation. If it does not have that function, the inverter will trigger an `overload’ fault and cut off the output to protect your appliance. This may cause damage to the air conditioner. Please ensure you use suitable protection devices. Switchgear and fuses must follow the local wiring standards. A figure of the complete system is presented below.
23 THREE PHASE HI 8~12kW | Installer Manual

4.6.Connecting the CT Coil
The CT coil is one of the most important parts of the Sunsynk inverter. This device reduces the power of the inverter to prevent feeding power to the grid. This feature is also known as “Zero Export”. 1. Fit the coil (sensor) around the live cable on the main fuse feeding the building and run the cable back to
the inverter. If using an external meter, you can extend the cable for more than 10 metres. Plese consult the meter manual on distance. 2. Connect the other end of the CT coil to the inverter terminals.
PLEASE NOTE
When the inverter is in the off-grid state, the N line needs to be connected to the earth. 24 THREE PHASE HI 8~12kW | Installer Manual

4.7.Meter Connection 4.7.1.System Connection for the CHNT Meter
CHNT meter
4.8.Earth Connection (MANDATORY)
An Earth Cable shall be connected to the earth plate on the grid size in order to prevent electric shock if the original protective conductor fails.
25 THREE PHASE HI 8~12kW | Installer Manual

All neutrals can be linked together to maintain the neutral bond. When a Neural Earth bond is required for an Off-grid’ operation, then it has to be removed onGrid-Tied’ operation.
If an Earth Bond is required between neutral and earth and your system is a hybrid system, then you can have a permanent earth wire since this can cause faults with an RCD before the inverter. Since the inverter is a true hybrid, then the bond must only be made when the inverter is operating in Islanding Mode. To accommodate this, Sunsynk provides an AC output, which is connected to the A/T/S connections whenever the inverter is running on Island Mode. Therefore, you can simply connect the coil of an AC relay to the ATS 240 connections. Next, you need to select Signal Island Mode on the battery charge menu (click on the gear icon -> battery icon), as shown in the figure below.
PLEASE NOTE
The grid power may still be present, but the inverter is not draining power from it since the unit is working in `Island Mode’.
You can verify if there is a voltage when the inverter is disconnected from the grid by using a simple multimeter.
26 THREE PHASE HI 8~12kW | Installer Manual

4.9.PV Connection
Before connecting to PV panels, install a separate DC circuit breaker between the inverter and PV modules. In addition, we request users install PV junction boxes with surge protection to protect the system from a lightning strike. To avoid any malfunction, do not connect any PV modules with possible current leakage to the inverter. For example, grounded PV modules will cause current leakage to the inverter. In order to reduce risk of injury, please use the recommended cable sizes as shown below:

Model 8/10/12kW

Wire Size 12 AWG

Cable (mm2 ) 4

4.9.1.PV Module Selection

When selecting the PV modules, you should consider the following parameters:

  1. Open-Circuit Voltage (Voc) of PV modules does not exceed the maximum PV array Voc. 2. Open-Circuit Voltage (Voc) of PV modules should be higher than the minimum start voltage of the
    inverter.

Inverter Model PV Input Voltage PV Array MPPT Voltage Range No. of MPP Trackers No. of Strings per MPP Tracker

8kW 1+1

4.9.2.PV Module Wiring

1. Switch the Grid Supply Main Switch (AC) OFF. 2. Switch the DC isolator OFF. 3. Assemble PV input connector to the inverter.

10kW 550V (140V~1000V)
200V~650V 2
2+1

12kW
2+1

DC+ male connector (MC4)

DC+ female connector (MC4)

27 THREE PHASE HI 8~12kW | Installer Manual

CAUTION
Before connection, please ensure the polarity of the output voltage of the PV array matches the DC+ and DC- symbols.

WARNING
Please do not connect the PV array’s positive and negative poles to the ground. This can seriously damage the inverter.
Before connecting the inverter, please make sure the PV array open-circuit voltage is within the maximum limit of the inverter.

Please utilise an approved DC cable for the PV system.

Cable type Industry generic PV cable (model: PV1-F)

Range

Cross section (mm) Recommended value

4.0~6.0 (12~10 AWG)

4.0 (12 AWG)

The correct steps in assembling the DC connector are explained below: 1. Strip 7mm of the plastic coating off the DC wire and disassemble the connector cap nut.

2. Crimp metal terminals with crimping pliers.
3. Insert the contact pin into the connector housing until it locks into place. Then screw the cap nut onto the connector housing. Torque to 2.5-3 N.m.
28 THREE PHASE HI 8~12kW | Installer Manual

4. Finally, insert the DC connector into the positive and negative input of the inverter.
PLEASE NOTE
When sunlight falls on the solar panel, it will generate a voltage. A high voltage generated by panels in a series configuration may cause danger to life. Therefore, before connecting the DC-Input line, the solar panel’s surface should be shielded from the sun’s rays by some opaque material, and the DC switch should be off. This will prevent a high voltage from flowing to the inverter, thereby causing risk to persons conducting installation or maintenance.
4.10.Wiring System for the Inverter
The following diagram is an example of an application where the neutral connects with the PV in a distribution box. For countries such as Australia, New Zealand, South Africa, etc., please follow local wiring regulations!
29 THREE PHASE HI 8~12kW | Installer Manual

30 THREE PHASE HI 8~12kW | Installer Manual

31 THREE PHASE HI 8~12kW | Installer Manual

4.11.Wiring Diagram
32 THREE PHASE HI 8~12kW | Installer Manual

4.12.Typical Application Diagram of Diesel Generator
33 THREE PHASE HI 8~12kW | Installer Manual

4.13.Three Phase Parallel Connection Diagram

01

02

03

34 THREE PHASE HI 8~12kW | Installer Manual

5.OPERATION 5.1.Display

DC AC Normal Alarm

LED indicator Green LED solid light Green LED solid light Green LED solid light Red LED solid light

Meaning PV connection normal Grid connection normal Inverter functioning normally
Fault

Function Key Esc Up
Down Enter

Description To exit the previous mode Increase the value of a setting Decrease the value of a setting Confirm setting change (If not pressed each time the setting will not
be saved)

5.2.Switching ON/OFF
Once the inverter has been correctly installed and the batteries have been connected, press the ON/OFF button (located on the left side of the case) to activate the system. When the system is connected without a battery but connected with either PV or grid and the ON/OFF button is switched off, the LCD will still illuminate (display will show off). In this condition, when switching on the ON/OFF button and selecting `No Battery’, the system can still work.

35 THREE PHASE HI 8~12kW | Installer Manual

5.3.Home Page
Press the Esc button any page to access the home page:

85%

SOLAR/TURBINE

AC load

0.0 0.0 kWh kWh

0.0 kWh

0.0 0.0 kWh kWh

0.0 kWh

BATTERY IN/OUT

MPPT.

GRID.

Battery

Grid

1. Customer name 2. Access the settings menu page 3. Access solar history 4. Access system status page 5. Access system status page 6. Access grid history 7. Access system flow page

What this page displays:
Total daily power into the battery (kWh). Total daily power out of the battery (kWh). SOC (State of charge of the battery) (%). Total daily solar power produced in (kWh). Total hourly usage of the generator (Time). Total daily power sold to the grid (kWh). Total daily power bought from the grid (kWh). Real-time solar power in (kW). Real-time load power in (kW).
5.4.Status Page

Real-time battery charge power in (kW). Real-time grid power in (kW). Serial number. Time date. Fault condition. Access stats pages. Access the status page. Access the fault diagnostic page.

To access the Status page, click on the BATTERY or AC LOAD dial on the Home page.

36 THREE PHASE HI 8~12kW | Installer Manual

What this page displays:
Total solar power produced. MPPT 1 power/voltage/current. MPPT 2 power/voltage/current. Grid power. Grid frequency. Grid voltage. Grid current. Inverter power. Inverter frequency.

Inverter voltage. Inverter current. Load power. Load voltage. Battery power charge/discharge. Battery SOC. Battery voltage. Battery current. Battery temperature.

Solar Column: Shows total PV (Solar) power at the top and then details of each of the two MPPT’s below L1 & L2 voltage.
Grid Column: Shows grid total power, frequency, voltage, and current. When selling power to the grid, the power is negative. When consuming from the grid, the power is positive. If the sign of the grid and HM (home) powers are not the same when the PV is disconnected and the inverter is only taking energy from the grid and using the CT connected to Limit-2, then please reverse the polarity of the CT coil. Important: See Section 4.6 (`Connecting the CT coil’).
Inverter Column: Showing inverter total power, frequency, L1, L2, voltage, current, and power.
Load Column: Showing total load power, load voltage, and power on L1 and L2.
Battery Column: Shows total power from the battery, battery SOC, battery voltage, battery current (negative means charge, positive means discharge) battery temperature (shows zero if the battery temperature sensor is not connected). DC transformer temperature and AC heatsink temperature (When the temperature reaches 90°C, it will display in red, and the performance of the inverter will start deteriorating when it reaches 110°C. Subsequently, the inverter will shut down to allow it to cool and reduce its temperature.
5.5.System Flow Page

Access by clicking on the bar chart on the Home Page.
To better understand the functioning of your system, take a look at the figure at right:
1. The PV modules charge the batteries.
2. When the batteries reach a specific level (programmable), the battery power is fed into the inverter.
3. The inverter can then supply power to the grid (export or no export), load, and auxiliary or smart load.
4. CT coil controls the export power.

37 THREE PHASE HI 8~12kW | Installer Manual

What this page displays:
The system flow. MPPTs power.

Battery status. Power distribution to load or grid.

5.6.Setup Page
To access Settings, click on the gear icon on the right top of the navigation menu.
What this page displays: Serial number. Software version. Time, Date, and MCU.
What you can do from this page: Access the Basic Setup Page (press the BASIC icon). Access the Battery Setup Page (press the BATTERY icon). 38 THREE PHASE HI 8~12kW | Installer Manual

Access the Grid Setup Page (press the GRID icon). Access the real-time programmable timer/system mode (press the SYSTEM MODE icon). Access the advanced settings such as Paralleling and Wind Turbine (press the ADVANCE icon). Access the auxiliary load/smart load settings (press the AUX LOAD icon) Access the fault code register (press the FAULT CODES icon). Set up Li BMS (press the LI BMS icon).

5.7.Set Time (Clock)

To set time, click on the BASIC icon and then on `Time’

How to set up:

What this page displays:
Time. Date. AM/PM.
What you can do from this page:
Adjust / set time. Adjust / set date. Adjust / set AM/PM.

Touch the screen on the box you wish to change. Change the number (increase/decrease) using the UP and DOWN buttons. Press OK to set the changes.

5.8.Set Company Name / Beeper / Auto dim

To set company name click on the BASIC icon and then on `Display’.

What this page displays: Beeper status (ON/OFF). Installers names.
What you can do from this page: Set up your company name. Switch the beeper ON or OFF. Set the LCD backlight to auto dim.

39 THREE PHASE HI 8~12kW | Installer Manual

85%

SOLAR/TURBINE

AC load

0.0 0.0 kWh kWh

0.0 kWh

0.0 0.0 kWh kWh

0.0 kWh

BATTERY IN/OUT

MPPT.

GRID.

Battery

Grid

How to change the name:
Change the letters in each box by moving the arrows up and down and then select OK. This will change the name on the home screen.

How to set the auto dim:
Set a number in the auto dim box to dim the LCD after a number of seconds.
How to turn the beep on or off: Mark or unmark the beep box and the press OK to configure it as you prefer.

5.9.Factory Reset and Lock Code
To access the Settings, click on the gear icon on the right top of the navigation menu.

What this page displays: Reset status. Whehter the lock code’ is used or not. What you can do from this page: Reset the inverter to the factory settings. System diagnostics. Change or set thelock code’.
Factory Reset: Reset all parameters of the inverter Lock out all changes: Enable this menu to set parameters before the unit is locked and cannot be reset. *Before performing a successful Factory Reset’ and locking the systems, the user must enter a password to allow the setting to take place. The password forFactory Reset’ is 9999 and for lockout is 7777.
40 THREE PHASE HI 8~12kW | Installer Manual

System self-check: Allows the user to conduct a system diagnosis. Test mode (only for engineers): For engineers to conduct tests.
5.10.Battery Setup Page
To configure battery settings, click on the BATTERY icon and then on Batt type’. What this page displays: Battery capacity in (Ah) ­ For non-BMS-batteries the range allowed is 0-2000Ah, while for lithium-ion, the inverter will use the capacity value of the BMS. Max battery charge current (Amps). Max battery discharge current (Amps) should be 20% of the Ah rating for AGM only. For Lithium, please refer to the battery manufacturer’s documentation. Note: This is a global max. Discharge current for bothgrid-tied’ and `backup’ modes of operation. If the current exceeds this value, the inverter will shut down with an overload fault. TEMPCO settings – The temperature coefficient is the error introduced by a change in temperature. What you can do from this page: Use battery voltage for all settings (V). Use battery SOC for all settings (%). No battery: tick this box if no battery is connected to the system.
41 THREE PHASE HI 8~12kW | Installer Manual

BMS setting. Active battery – This feature will help recover a battery that is 100% discharged by slowly changing from
the solar array. Until the battery reaches a point where it can change normally.
5.11.Generator & Battery Page
To configure battery charging settings, click on the BATTERY icon and then on Batt Charge’. What this page displays: Generator start voltage/SOC %. Grid power start voltage/SOC %. Float V is the voltage at which a battery is maintained after being fully charged. Absorption V the level of charge that can be applied without overheating the battery. Float V for an AGM battery is 55.20V. Absorption V is for an AGM battery is 57.60V. Equalization V for an AGM battery is 58.80V. Equalizing charge/overcharge to remove sulphate crystals that build-up on the plates over time on lead-acid batteries. What you can do from this page: TickGen Charge’ to charge the batteries from the gen I/P. Tick Grid Charge’ to charge the batteries from the grid I/P. TickGen Signal’ signal to auto-switch a relay box. Tick `Grid Signal’ signal to auto-switch a relay box.
42 THREE PHASE HI 8~12kW | Installer Manual

PLEASE NOTE
Do not alter these settings too often on the same battery, as it may damage the battery.

Gen Charge: Uses the GEN input of the system to charge the battery bank from an attached generator. Gen Signal: Normally open (NO) relay that closes when the Gen Start signal state is active. Gen Max Run Time: This indicates the longest time the generator can run in one day. When the maximum running time is reached, the generator will be turned off. `24H’ means the generator will run continuously. Gen Down Time: This indicates the delay-time of the generator to shut down after it has reached the running time. Grid Charge: It indicates that the grid will charge the battery. Grid Signal: This indicates when the grid should no longer charge the battery.

Recommended battery settings:

Battery Type AGM (or PCC) Gel Wet Lithium

Absorption Stage 14.2V (57.6V) 14.1V (56.4V) 14.7V (59.0V)

Float Stage

Voltage (every 30 days 3hr)

13.4V (53.6V)

14.2V (57.6V)

13.5V (54.0V)

13.7V (55.0V)

14.7V (59.0V)

Follow its BMS voltage parameters

Using a generator with a Sunsynk inverter:
A generator can either be connected to the Grid side or to the Gen connection. When connected to the Grid Input, the inverter will consider the power coming from the generator as Grid Supply’. Users should ensure this power goes to the LOAD only and should not be exported to other outlets, as this will damage the generator. An advantage of connecting the generator to the Grid Input is that it can be paralleled, whereas the GEN/ AUX input cannot be paralleled. That means the inverter will extract what power it requires fromGrid Supply’ to charge its batteries.
If the generator is connected to the inverter and a generating signal exists, the inverter will switch 100% of the load to the generator and then slowly increase the charging currents to the batteries. Therefore, the generator must be able to supply both the charge current and the total load current.
The generator can be controlled via a relay with a set of dry-contacts to enable remote control. The current on the contacts is limited to approximately 1Amp 12V.
Below is a simple reference circuit of an auto-start system that can autostart generators on a boat. (Sunsynk will be releasing a new OS E406 ( Auto-Start ) for better generator control).

43 THREE PHASE HI 8~12kW | Installer Manual

Generator Auto Start
5.12.Battery Discharge Page
To configure inverter’s shutdown settings, click on the BATTERY icon and then on `Shut Down’.
44 THREE PHASE HI 8~12kW | Installer Manual

What this page displays: Inverter shutdown voltage set as either a voltage or %. Inverter low battery warning set as either a voltage or %. Restart voltage set as either a voltage or %.
What you can do from this page: Adjust battery shut down (voltage or %) Adjust low battery warning (voltage or %) Adjust restart (voltage or %)
PLEASE NOTE
Activating Shutdown causes the inverter to enter standby-mode. It does not entirely shut down the inverter. Total shutdown occurs at voltages below 19V.
The voltage displayed on the Sunsynk Parity Inverter will vary depending on whether the inverter is charging or discharging the batteries.
Since the batteries are 48V, the figure on the left is x4: Fully Charged 50.54V (Discharge Mode) Fully Charged 58.50V (Charge Mode) 75% Charged 49.60V (Discharge Mode) 75% Charged 54.80V (Charge Mode) 25% Charged 48.00V (Discharge Mode) 25% Charged 50.80V (Charge Mode) Completely Discharged 47.50V Setting the cut-off higher is better for the batteries.
45 THREE PHASE HI 8~12kW | Installer Manual

The batteries recommended for use with the Sunsynk systems are AGM Lead Acid or Lithium Battery Banks. (AGM’ means Absorbed Glass Matt construction that allows the electrolyte to be suspended new the plate’s active material. In theory, this enhances both the discharge and recharging efficiency. AGM batteries are very heavy as a result). State of Charge Bulk: The bulk charge is the first stage of a battery’s charging process, where the charger identifies the battery and its needs and then applies a high voltage to do the bulk of the charging. It involves about 80% of the recharge. The properly sized charger will give the battery as much current as it will accept up to charger capacity (25% of battery capacity in Amp hours). Absorption: To fully charge a battery, a period of charging at a relatively high voltage is needed. This period of the charging process is called absorption. This occurs when the charging of a battery has reached 80% of its capacity. The remaining charge equals 20% approximately. It makes the charger hold the voltage at the charger’s absorption voltage (between 14.1 VDC and 14.8 VDC, depending on charger set points) and decreases the current until the battery is fully charged. Float: The charging voltage is reduced to between 13.0 VDC and 13.8 VDC and held constant, while the current is reduced to less than 1% of battery capacity. This mode can be used to maintain a fully charged battery indefinitely. Equalisation: This is essentially a controlled overcharge that occurs at the end of the Bulk mode and the absorption phase and is called theequalisation voltage’. However, technically, this phase has another function. Higher capacity wet (flooded) batteries sometimes benefit from this procedure, particularly the physically tall batteries. The electrolyte in a wet battery can stratify over time if not cycled occasionally. In equalisation, the voltage is brought up above the typical peak charging voltage well into the gassing stage and maintained for a fixed (but limited) period. This stirs up the chemistry in the entire battery, equalising’ the strength of the electrolyte and knocking off any loose sulphating that may be on the battery plates. 5.13.Setting Up a Lithium Battery To set up a lithium-ion battery, click on the BATTERY icon and visit theBatt Type’ column.
What this page displays:
This information will only display if the Lithium’ option is selected under Batt Type’. The type of communion protocol. Approved batteries. 46 THREE PHASE HI 8~12kW | Installer Manual

What you can do from this page:
Set up you Lithium-ion battery.
After installing a lithium battery, check the communications page by clicking on the `Li BMS’ icon to see if the BMS information is visible. Suppose some information is not displayed correctly (it should look like the diagram below), then there will be a communication error.

Therefore, if a communication error occurs: 1. Check that your data cable is the correct type. 2. Check that the data cable is plugged into the correct sockets. Usually, RS485 is employed, but some
battery manufacturers use others.

PLEASE NOTE
With some types of lithium batteries, the BMS cannot be controlled by the Sunsynk inverter. In this case, treat the battery as a lead-acid type and set the charging and discharging protocol following the battery manufacturer’s specifications.

It is crucial to refer to the manuals that manufacturers produce for their batteries. That way, the chance of errors occurring during installation is significantly reduced. Below is a list of batteries that have been examined, tested, and approved by Sunsynk.

Brand DYNESS SolarMD SHOTO

Model
B4850 POWERBOXF
SS4074 SS4037 SS202 SDC-Box5(5.12KWH)

48V Storage Inverter

RS485 or CAN
CAN
CAN CAN

Inverter Setup
0 0 0 0 0 0

Notes
To be used with V2 Logger http://solarmd.co.za/inverter-compatibility-solarmd/ sunsynk-and-solar-md/

47 THREE PHASE HI 8~12kW | Installer Manual

Brand
PYLON
HUBBLE SACRED SUN UZ ENERGY
GenixGreen Sunwoda APIUM
VISION Group Alpha Ess

Model
US2000B
US3000
US2000C
US3000C
UP5000
US5000
Force L1
Force L2
AM-2 5.5KW SSIF2P15S48100C
FCIFP48100A SSIFP48100A
L051100-A L051100-A1 L051100-B L051100-D
ESS-5120 ESS-10240 ESS-BOX2 ESS-BOX3 ESS-BOX4 ES-BOX2 ES-BOX5 ES-BOX12 H4850M
SunESS Atrix AP-5 APR-5
V-LFP51.2V100Ah-5KW VLFP51.2V200Ah-5KW
M4856-P SMILE BAT

48V Storage Inverter

RS485 or CAN
CAN RS485 CAN RS485 CAN RS485 CAN RS485 CAN RS485 CAN RS485 CAN RS485 CAN RS485 CAN RS485 RS485 RS485 CAN CAN CAN CAN RS485 RS485 RS485 RS485 RS485 RS485 RS485 RS485 CAN CAN CAN CAN CAN CAN CAN CAN CAN

Inverter Setup

Notes

0

12

0

12

0

12

0

12

0

12

0

12

0

12

0

12

0

1

1

Cut Line 3, 6, 8

1

0

0

0

0

6

6

6

6

6

6

6

6

0

0

0

0

0

13

13

0

0

48 THREE PHASE HI 8~12kW | Installer Manual

Brand
GSL ENERGY
TOPBAND Weco
DOWELL Giter
CF Energy Batterich/ Greenrich
BYD
Narada
Deye AOBOET Wattsonic KODAK Fox ess
PYTES Energy
BST

Model
GSL051100A-B-GBP2 GSL051200A-B-GBP2 GSL051280A-B-GBP2
ZnP48100ESA1 GSL-51-100 GSL-51-200
TB51100F-T110 TB51120-T110
4K4 LV 5K3 LV IPACK C3.3 IPACK C6.5 IPACK C10 G2500-48V G5040-48V CFE2400 CFE5100 CFE5100S

48V Storage Inverter

RS485 or CAN
CAN CAN CAN CAN CAN CAN CAN CAN CAN CAN CAN CAN CAN CAN CAN CAN CAN CAN

Inverter Setup
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Notes

UP3686

CAN

0

BYD Battery-Box LV Flex Lite

CAN

0

48NPFC80 48NPFC100 48NPFC150
48NPFC200

RS485

16

RJ45 Pin 1: GND

RS485

16

RJ45 Pin 2: RS485_A RJ45 Pin 3: RS485_B

RS485

16

RJ45 Pins 4, 5, 6, 7, 8: No

Connection

Single-phase Hybrid

RS485

16

Inverter Comm version is E41E Single-phase

Hybrid Inverter Comm

version is 1001 – E016

SUNB-5.0-G01-48-PC

SE-G5.1 PRO/AI-W5.1/

CAN

0

RW-M6.1

Uhome-LFP 5000 Uhome-LFP 2400 Li-LV battery series
FL5.2 LD-48100P

CAN

0

CAN

0

RS485

14

CAN

0

RS485

1

E-BOX 48100R

CAN

0

MD48-100 MD48-50

CAN

0

CAN

0

49 THREE PHASE HI 8~12kW | Installer Manual

Brand Highstart Rosen Solar
Energy
ZRGP
BALANCELL
UFO
DMEGC
Robuste
Soluna
REVOV PAND CLiS (Zhongneng Lithium Battery Technology Taizhou Co., Ltd.) LBSA Freedomwon GSO Sunketess Vestwoods Green Solutions Inc. nRuiT Energy

Model
HSD4870 LFP48V200AH LFP51.2V200AH ZR-FC48100-1630J1 ZR-FS4850-16OSJ1 ZR- FS48100-16OSJ1
ZR-PBX1 P26 P27
U-P48200-7 U-P48100-7 U-P48150-1 L01-48100 L02-48200
LR48100 LR48200 4K Pack 5K Pack EOS-5K Pack
R100 Powerfree Rack Powerfree Cube
Enerhi-M Series
LBSA 51.2V/100Ah Freedomwon Lite Com-
mercial 52V and LV Models GBP48 LFP5000 VT Series VE Series
HOME E10
PowerPorter 5.0/9.0/10.0/12.0/15.0

48V Storage Inverter

RS485 or CAN
CAN CAN CAN CAN CAN CAN CAN CAN CAN CAN CAN CAN CAN CAN CAN CAN CAN CAN CAN CAN CAN CAN

Inverter Setup
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

CAN

0

CAN

0

CAN

0

CAN

0

CAN

0

CAN

0

CAN

0

CAN

0

CAN

0

Notes

50 THREE PHASE HI 8~12kW | Installer Manual

Brand
COOLI
Far East Battery
VOLTA
LEMAX EVO
Yoshopo GEN2 BNP
Shanghai Green
Tech Co.,Ltd. Unipower LD Felicity
BSL
Enersol

Model
CLR5KWH CLW5KWH CLR10KWH CLW10KWH CLH10KWH ESS10240

48V Storage Inverter

RS485 or CAN
CAN CAN CAN CAN CAN CAN

FEB LV Series

CAN

VOLTA STAGE1

CAN

VOLTA STAGE2 VOLTA STAGE3

CAN

CAN

VOLTA STAGE4

CAN

LM-JW-51.2V100Ah LM-JW-51.2V200Ah

CAN

CAN

EVO 5.7KWH 48V-120Ah

CAN

BB-LFP-100Ah-P

CAN

Gen2 P48200-7 Gen2 P48100-7

CAN

CAN

Gen2 P48150-1

CAN

51.2V 100Ah

CAN

GTEM-48V2500

RS485

UPI.FP4845

RS485

LD-100P210J

RS485

LPBF Series

RS485

LPBA-OL Series

RS485

LPBA-IL Series

RS485

B-LFP51.2V 100Ah

B-FLP51.2V 125Ah

B-LFP48-130E 51.2V 130Ah
B-LFP48-160E 51.2V 160Ah

CAN

B-LFP51.2V 200Ah Powerwall

lithium 48-100

CAN

Inverter Setup
0 0 0 0 0 0
0
0 0 0 0 0 0 0 0 0 0 0 0
12
15 17 12 12 12

Notes

Float voltage 54.5V

Absorption V 55.00V

Disable equalisation 0

0

Days

Shutdown 20%

Low Batt 35%

Restart 50%

BMS cable ­ straight RJ45

cable ( no need to change

0

pin outs on cable)

Dip Switch settings is 1000 ( for single battery)

51 THREE PHASE HI 8~12kW | Installer Manual

Brand

Model BN52V-280-14.5K HC

48V Storage Inverter

BN52V-560-29K HC

Blue Nova HC

BN52V-840-43.6K HC

BN52V-1120-58.2K HC

BN52V-1400-72.8K HC

Blue Nova

BN52V-840-43.6K BR

Rack Series

BN52V-1120-58.2K BR

Blue Nova

RacPower BN52-100-5.2K BP

Rackpower RacPower BN52-100-5.2K DU

RS485 or CAN
CAN
CAN
CAN CAN CAN CAN CAN CAN
CAN

Inverter Setup

Notes

0

Can be used with or without BMAC

https://www.bluenova.

0

co.za/wp-content/uploads/2015/11/BN-User-

Manual-HC_v102.pdf

0

0

CANH = Pin 7

0

CANL = Pin 8

0

BlueNova-BMAC-Manu-

0

al-v4.pdf

0

0

PLEASE NOTE
When communications between the battery and inverter do not exist, do not overcharge your battery bank (current or voltage). Many lithium batteries are limited to 100A, some are lower, and some are higher. Ensure that voltage and current specifications provided by the battery manufacturer are followed.
If you are using lead acid batteries, then follow the equation of C x 0.25, which means that the maximum charge or discharge you can apply to a battery is a quarter of the AH rating of the overall battery array. E.g: A 200Ah battery array composed of 4 x 200Ah batteries in series has a maximum discharge of only 50Ah (200 x 0.25 = 50)
Also, ensure the cable is thick enough to support the current and that the connected fuses are of the correct rating per the battery manufacturers’ recommendations.

52 THREE PHASE HI 8~12kW | Installer Manual

5.14.Program Charge & Discharge Times
To set Charge’ andDischarge’ times, click on the System Mode’ icon after clicking on the gear icon. What this page displays: A setting to prevent the inverter exporting power to the grid –Zero Export’. The ability to limit power supply to only the household loads – Solar Export’. Set the power limits to supply only the loads connected to the LOAD port –Priority to Load Only’. What you can do from this page: Set a real time to start and stop charging or discharging the battery. Choose to charge the battery from the grid or generator. Limit export power to the grid. Set the unit to charge the battery from the grid or generator ticking Grid’ orGen’ and set what times this
needs to occur. Set the time to discharge the unit to the load or export to the grid by unticking Grid’ andGen’.
Concerning the detailed next figures: 1. Tick this box to not export power back to the grid (the CT coil will detect power flowing back to the grid
and will reduce the power of the inverter only to supply the local load). 2. Tick this box if you wish to export your solar power back to the grid. 3. Tick this box if you only want to supply power to the load side of the inverter. 4. Zero Export Power’ is the amount of power flowing from the grid to the inverter. Set this value to ’20 – 100W’ to instruct the inverter to always take the prescribed amount of power from the grid to minimise the tripping of sensitive pre-paid electricity meters ifReverse Power Detection’ occurs. 5. This controls the maximum overall power, both to the Load’ andGrid’ ports combined. It is set to Low if an over-current’ fault occurs. 6. Tick this box if you wish to set the solar panels to give power to theLoad’. If you untick this box, the solar will send power to charge the batteries.
53 THREE PHASE HI 8~12kW | Installer Manual

Example: This example shows the battery being charged up to 100% by both the Grid and Solar PV from 8 a.m. to 11 a.m. and then being able to supply up to 4kW of battery-power to the essential’ loads from theLoad’ Port until the battery SOC drops to 50%.
IMPORTANT – When charging the batteries from the Grid or Generator, please ensure you have set the correct battery-charging settings on the battery charge as shown in Section 4.10 Battery Setup’ Home Page. If theUse Timer’ function is activated then the inverter will use the battery power according to your settings when the Grid is present. If this function is not set, the batteries WILL ONLY be used for backup when there is no utility grid power. 54 THREE PHASE HI 8~12kW | Installer Manual

Example: The power produced is supplying the Non-Essential Load’ while the inverter is set at a maximum power of 8kW (Max Sell Power). The inverter is connected to the grid, but no export is performed. The unit allows small amounts of power to flow from the Grid (100W Zero Export Power) to prevent any back-flow. In this example, the solar PV is prioritised to supply the Load first and then subsequently, charge the battery. 5.15.Grid Supply Page On the Settings Menu, click on the GRID icon. What this page displays: Grid frequency setting. Grid type (normally 230V three-phase). What you can do from this page: Change the grid’s frequency setting (normally 50 Hz) Set the Maximum Grid Input Voltage (Grid Vol High’) Set the Minimum Grid Input Voltage (Grid Vol Low’) Set the Maximum Grid Frequency (Grid Hz High’) Set the Minimum Grid Frequency (`Grid Hz Low) 55 THREE PHASE HI 8~12kW | Installer Manual

Select the correct Grid Type in your local area; otherwise, the machine will not work or be damaged. Select the correct Grid Frequency in your local area.
5.16.Advanced Settings for Paralleling Inverters
To configure multi-inverter settings, click on the ADVANCE icon.
What this page displays: If the inverter operates as a master or a slave. Modbus Device ID ­ `Modbus SN’ that must be unique for each inverter connected to the bus/wire. What you can do from this page: Set the inverter as a master or slave per bus/wire. Set the phase in which the inverter will be paralleled. Set the Modbus SN for paralleling. The Sunsynk inverter can be wired standalone, or it can be connected in parallel when more power is required. The maximum number of inverters that can be paralleled in a three-phase utility grid is 10. In the case where 10 inverters are operating in parallel, one will operate as the Master and the other ones as Slaves. For stability, all the batteries need to be connected in parallel. A minimum cable size of 50mm is recommended, with fuse isolators for each inverter. Each invert will require a fuse isolator with surge protection, and each group circuit will require an RCD. If the batteries are supplying power to the main load during the outage, then a change over switch will also be required, or a split load can be used. The CT coils used to limit export power must only be connected to the Master. Therefore, if six inverters
are paralleled, three CT coils will be required. Connect a RJ45 communication cable between each inverter; the order is not important since both
sockets are the same, so there is no IN or OUT. 56 THREE PHASE HI 8~12kW | Installer Manual

Each phase must only have one Master and the others set to slave. Each inverter must have a unique Modbus number. The maximum length of the communication cables is 2 meters (do not exceed this value) All batteries must be connected in parallel, and the MPPTs must be kept separate. IMPORTANT: When configuring inverters in parallel, it is important to first check firmware
versions to be the same on all inverters. It is strongly recommended to request firmware updates on all inverters to the latest and the exact same firmware version. IMPORTANT: All inverters in a parallel system must have their isolating load breaker before it goes to the parallel breaker to ensure while programming that the load outputs are isolated from each other. Only once confirmed that all inverters are programmed correctly in parallel, the isolating breakers can be switched on, which then feed to the main load output breaker that feeds the loads.
PLEASE NOTE
The cables have two ends, one to be specifically connected to the BMS and another one to be connected to the inverter, do not change it. If the communication is not working correctly between inverters, then errors will appear on display. In this case, please check all settings and data cables.
57 THREE PHASE HI 8~12kW | Installer Manual

PLEASE NOTE
All inverters in a parallel system must have their own isolating load breaker before it goes to the parallel breaker to ensure while programming that the load outputs are isolated from each other.
The grid input can also be connected in parallel. You cannot connect the Aux/Gen port in parallel because this causes a conflict between the
generator’s frequency and the grid’s frequency.
Some common questions that occur when paralleling inverters:
Q1: What is the sequence to install/connect/commission? First of all, leave the main supplies off. Next, connect all communication cables, set up all LCDs and then, last of all, turn on the main supplies.
Q2: What are the indications that the communication and the system are ok or not? Parallel errors will be shown as fault F46 on the display.
Q3: What are the consequences of not setting one inverter in a parallel mode? It can damage the inverter.
Q4: What are the consequences of having more than one Master Inverter or having no inverter set as `Master’? It can damage the inverter. There are cases in which it is possible to have more than one master. For example, as aforementioned, six inverters paralleled in a three phase utility grid (three masters).
Q5: What are the consequences for setting A, B, or C phases wrong while in parallel mode? It can damage the inverter. Recommend checking the phase rotation with a meter before switching on.
Q6: What are the consequences of factory resetting, power cycling, or firmware updating one inverter in a parallel system? It can damage the inverter. Inverters needs to be isolated from each other before factory reset or firmware update.
Q7: What consequences for changing ALL/ANY settings while operating in parallel mode? It can damage the inverter and fault F46 will be indicated on the display.
If you need further help please refer to the Sunsynk website where you will find training videos and Frequently Asked Questions www.sunsynk.com. Firmware prior installation is important to be updated and all inverters in parallel or three phase system must be the same.
58 THREE PHASE HI 8~12kW | Installer Manual

5.17.Solar Power Generated
This page shows the daily, monthly, yearly, and total solar power produced. Access this page by clicking on the `Solar/Turbine’ icon on the Home Page.

5.18.Grid Power
This page shows the Daily / Monthly / Yearly and total grid power export or consumed. Access this page by clicking on the `Solar/Turbine’ icon on the home page.

59 THREE PHASE HI 8~12kW | Installer Manual

TOTAL

5.19.Advanced Settings for Wind Turbines
To configure wind turbine settings, click on the ADVANCE icon.

What this page displays: If one or both of the MPPTs are connected to a wind turbine. What you can do from this page: Select the MPPT to be used as a turbine input. The table below shows the maximum current depending on the voltage of the wind turbine.

PLEASE NOTE
DO NOT use a wind turbine that exceeds 400V.
Use a self-breaking wind turbine. Once the batteries are fully charged and the inverter is not exporting any power, the load can drop. This can cause the turbine to speed up dramatically, which can be very dangerous and usually happens suddenly. Thus, it is essential to use a self-breaking turbine.

Voltage (V) 150 200 250 300 400

Max. Current (A) 23.33 17.50 14.00 11.67 8.75

Power (W) 3500 3500 3500 3500 3500

60 THREE PHASE HI 8~12kW | Installer Manual

Most wind turbines are three-phase PM type. Therefore, either a wind turbine controller or a direct connection to the MPPT via a simple protection circuit will be required.
Dump Load or Diversion Load is an important part of an off-grid power system. When the battery ( Battery Bank ) is fully charged, and the water turbine / wind turbine / solar PV module is still generating, a dump load is a useful device to send spare electricity to. This can be done by using a switch on a smart load option or by utilising a wind turbine controller with a built-in dump load. Also, a hot water tank controlled via a smart-load can act as a good `dump-load’ however, in very windy conditions it may be necessary to shunt the output.
5.20.Advanced Settings for Auxiliary Load
To configure Auxiliary Load (previously known as “smart load”) settings, click on the AUX LOAD icon. What this page displays: Use of the Gen (Aux) input or output. What you can do from this page: Set up a generator input. Set up an auxiliary (smart) load. Set up Peak Power Shaving. Use an additional inverter or micro inverter. A nice feature of this page is that when the batteries are full and the inverter is still producing power from the solar PV or turbine, it is possible to direct the power generated to another load such as a water heater.
61 THREE PHASE HI 8~12kW | Installer Manual

Aux Load off Battery % or Voltage Aux Load on Battery % or Voltage Solar Power Gen Input Aux Load Output
For Micro inverter Input
Zero Export Gen Peak Shaving

Battery level when the Aux load switches off Battery level when the Aux load switches on. Power limiter to the maximum power allowed to the Aux load.
Tick this box if using a Generator. Tick this box if using an Aux or Smart Load. Tick this box if intending to connect a supplementary inverter or
micro inverter (Max. 4kW). Tick this box to stop exporting power produced by the Aux Load.
Tick this box to use peak power shaving.

62 THREE PHASE HI 8~12kW | Installer Manual

5.21.Advanced Settings for Peak Shaving
To configure Peak Power Shaving function, click on the AUX LOAD icon.icon. What this page displays: Generator peak shaving is ON or OFF. Peak Power Shaving value. What you can do from this page: Switch on the generator and/or grid peak
power saving and set the power shaving value. Peak Shaving: This is a technique used to reduce electrical power consumption during periods of maximum demand on the utility grid. This enables the user to save substantial amounts of money due to the expensive peak power charges.
5.22.Fault Codes
To check the fault codes click on the FAULT CODES icon on the settings menu.
63 THREE PHASE HI 8~12kW | Installer Manual

If any of the fault messages listed in the following table appear on your inverter and the fault has not been removed after re-starting, please contact your local vendor or service centre. The following information is required: 1. Inverter serial number. 2. Distributor or service centre of the inverter. 3. On-grid Power Generation Date. 4. The problem description (including the fault code and indicator status displayed on the LCD) with as much detail as possible. 5. Owner’s contact information.

Error Code

Description

F13

Working Mode Change

F18

AC over current fault or hardware

F20

DC over current fault of the hardware

F23

AC leakage current is trans over current

F24

DC insulation impedance failure

F26

The bus bar is unbalanced

F35

No at: grid

F42

AC line low voltage

F47

AC over frequency

Solutions Inverter work mode changed 1.Reset the inverter. 2.Seek help from Sunsynk. AC Slide over current fault. 1.Check if the backup load power is within the range of the inverter. 2.Restart, and check if it is normal. DC Over current fault 1.Check if PV module and battery connections. 2.Reset the system. Leakage current fault 1.Check the PV module and inverter cables. 2.You may have a faulty PV panel (earth short) 3.Restart inverter PV isolation resistance is too low 1.Check if the connection of PV panels and inverter are firmly connected. 2.Check if the earth bond cable on inverters is connected to the ground. 1.Please wait 5 minutes to see if it returns to normal. 2. Fully reset the inverter. Grid voltage fault 1.Check if the voltage is in the range of standard voltage in specification this can be adjusted via the grid set up page. 2.Check if grid cables are correctly connected. Grid voltage fault 1.Check if the voltage is in the range of standard voltage in specification this can be adjusted via the grid set up page. 2.Check if grid cables are correctly connected. Grid frequency out of range 1.Check if the frequency is in the range of specification 2.You may need to adjust the frequency on the grid set up page.

64 THREE PHASE HI 8~12kW | Installer Manual

Error Code

Description

Battery low voltage

Solutions

1. Check if the battery voltage is too low.

2. If the battery voltage is too low use the PV or grid to

F48

DC bus bar voltage is too low charge the battery.

3. Check the battery BMS

Important: Especially with Lithium batteries, ensure that the batteries Max. discharge current or power specification is the same or higher than the inverter specification.

Heat Sink temp is too high

F64

Heat sink high-temperature failure

1.Check if the working environment temperature is too high.

2.Turn off the inverter for 30 minutes and restart.

Fault Information
F01 F02 F03 F04 F05 F06 F07 F08 F09 F10 F11 F12 F13 F14 F15 F16 F17 F18 F19 F20 F21 F22 F23 F24 F25 F26 F27 F28 F29 F30 F31 F32

Instruction
DC_Inversed_Failure DC_Insulation_Failure
GFDI_Failure GFDI_Ground_Failure EEPROM_Read_Failure EEPROM_Write_Failure
GFDI_Fuse_Failure GFDI_Relay_Failure
IGBT_Failure AuxPowerBoard_Failure AC_MainContactor_Failure AC_SlaveContactor_Failure Working_Mode_change
DC_OverCurr_Failure AC_OverCurr_Failure
GFCI_Failure Tz_COM_OC_Fault Tz_Ac_OverCurr_Fault
Tz_Integ_Fault Tz_Dc_OverCurr_Fault
Tz_GFDI_OC_Fault Tz_EmergStop_Fault
Tz_GFCI_OC_Fault DC_Insulation_Fault DC_Feedback_Fault BusUnbalance_Fault DC_Insulation_ISO_Fault DCIOver_M1_Fault AC_AirSwitch_Fault AC_MainContactor_Fault AC_SlaveContactor_Fault DCIOver_M2_FaulT

65 THREE PHASE HI 8~12kW | Installer Manual

Fault Information
F33 F34 F35 F36 F37 F38 F39 F40 F41 F42 F43 F44 F45 F46 F47 F48 F49 F50 F51 F52 F53 F54 F55 F56 F57 F58 F59 F60 F61 F62 F63 F64

Instruction
AC_OverCurr_Fault AC_Overload_Fault AC_NoUtility_Fault AC_GridPhaseSeque_Fault AC_Volt_Unbalance_Fault AC_Curr_Unbalance_Fault INT_AC_OverCurr_Fault INT_DC_OverCurr_Fault AC_WU_OverVolt_Fault AC_WU_UnderVolt_Fault AC_VW_OverVolt_Fault AC_VW_UnderVolt_Fault AC_UV_OverVolt_Fault AC_UV_UnderVolt_Fault AC_OverFreq_Fault AC_UnderFreq_Fault AC_U_GridCurr_DcHigh_Fault AC_V_GridCurr_DcHigh_Fault AC_W_GridCurr_DcHigh_Fault AC_A_InductCurr_DcHigh_Fault AC_B_InductCurr_DcHigh_Fault AC_C_InductCurr_DcHigh_Fault DC_VoltHigh_Fault DC_VoltLow_Fault AC_BackFeed_Fault AC_U_GridCurr_High_Fault AC_V_GridCurr_High_Fault AC_W_GridCurr_High_Fault AC_A_InductCurr_High_Fault AC_B_InductCurr_High_Fault
ARC_Fault Heatsink_HighTemp_Fault

PLEASE NOTE
The 3-Phase Hybrid Inverter is designed for grid-connected operation. The inverters meet the main standards concerning safety and electromagnetic compatibility.
Before leaving the factory, all inverters undergo rigorous testing to ensure the inverter can operate reliably, as presented in Chapter 3, `Technical Specifications’. If you need further help please refer to the Sunsynk website where you will find training videos and frequently asked questions www.sunsynk.com.
5.23.Operation Modes 5.23.1.MODE I: Basic
5.23.2.MODE II: With Generator
66 THREE PHASE HI 8~12kW | Installer Manual

5.23.3.MODE III: With Smart-Load 5.23.4.MODE IV: AC Couple
67 THREE PHASE HI 8~12kW | Installer Manual

6.COMMISSIONING 6.1.Start-Up / Shutdown Procedure
The inverter must be installed by a qualified / licensed electrical engineer in accordance with the country’s wiring regulations. Before switching on, the installation engineer must have completed the Earth Bond, RCD and earth leakage tests, checked that the solar panel Voc voltage does not exceed 480V and checked the battery voltage. Power ON Sequence: 1. Switch on AC 2. Press Start Button 3. Switch on Battery and battery breaker 4. Switch on the DC (PV Isolator)
Shutdown Sequence: 1. Switch off AC 2. Press the start button 3. Switch off the battery and the battery breaker 4. Switch off the DC (PV isolator)
6.2.Information for Commissioning the Inverter
After you have successfully powered up the inverter, it must be programmed and set up as per the programming feature above.
68 THREE PHASE HI 8~12kW | Installer Manual

Check each bond on the solar panels

Check the VOC does not exceed 480V

Ensure both MPPTs are balanced

Measure the supply voltage check it matches the settings of the inverter

If it falls out of the setting range it will cause the inverse shut down and alarm

See Grid Setup page

Check the battery charge and discharge is within
the C rating of the battery. Too high will damage the
battery

Check the battery BMS is communicating with the
inverter

This is the heart of the system this controller
everything
This is for paralleling systems, and wind turbine

Ensure you are familiar with this, if you fully under-
stand the controller you will fully appreciate the capabilities of there inverter
If paralleling inverters in 3 Phase check you phase rotation before switching on the AC Load, in 3 Phase
the output voltage will increase across phase to
400V

See section `Program Charge / Discharge Times’
If using a wind turbine please ensure you have
the correct limiting resistor, caps and rectifier

Familiarize yourself with common fault codes

6.3.GDFI Fault
Before the inverter connects to the Grid, it will detect the impedance (effective resistance) of the solar PV + to Ground, and the impedance of the solar PV – to ground. If any of the impedance values are less than 33k, the inverter will not connect to the Grid and will report an error F24 on its LCD.
7.MAINTENANCE
The inverter is low maintenance. However, it is important that at least twice a year (for dusty environments this may need to be carried out weekly) all the cooling fans, air ducts are cleaned and dust free. Check if there are no fault codes and Lithium battery communication is correct. Weekly cleaning statement: Suggest micromesh filters as an available option, micro ants here are a real problem.
69 THREE PHASE HI 8~12kW | Installer Manual

APPENDIX A
Protocol CAN
RS485

Description Pin 1: CAN-H Pin 5: CAN-L Pin 2, 3, 4, 6, 7, 8: NC Pin 1: RS485B Pin 2: RS485A Pin 3, 6: GND Pin 7: RS485A Pin 8: RS485B Pin 4, 5: NC

APPENDIX B
Inverters sold in Australia will be set to the Default Australian standards.
APPENDIX C
The Sunsynk Single-Phase Hybrid Inverter inverter is compatible with the SolarMan app, via a Wi-Fi or GSM data logger (See SolarMan instruction manual).
APPENDIX D
If an external Residual Current Device (RCD) is used it should be of Type A/AC with a tripping current of 30mA or higher.
Use of RCDs Residual Current Devices (RCDs): An RCD dedicated for an Inverter Energy System (IES) may be used to meet the mechanical cable protection requirements of AS/NZS3000 for the cable from the switchboard to the IES. 70 THREE PHASE HI 8~12kW | Installer Manual

If an RCD is installed the engineer must: 1. Disconnect all live conductors (including both active and neutral conductors) and 2. Be of the type specified in the inverter manufacturer’s instructions or as labelled on the inverter. We recommend the use of an RCD on all circuits and sub-circuits connected to the Sunsynk Inverter. Below is the specifications for a Residual Current Breaker with Over-current Protection (RCBO)

Earth-leakage protection class Earth-leakage sensitivity Curve code Network type Poles description
Earth-leakage protection time delay
APPENDIX E

Type A 30mA
C AC 2P Instantaneous

The Sunsynk inverter can be connected to the internet, but you need to add a data logger to do this. The inverter is compatible with Solar Man data- loggers, which you can obtain from us with your distributor 1. LAN-Type Data Logger 2. Wi-Fi-Type Data Logger 3. GSM-Type Data Logger To setup the Internet connection for the Data Logger, please refer to the App User instructions. The Data Logger should be connected to the bottom of the inverter via the connection socket marked WIFI. For more information, training videos, software upgrades, help line, forum please refer to http://www.sunsynk.com – Tech Support (Do not forget to register first on the website).

Sunsynk

@energysolutions

sunsynkofficial

71 THREE PHASE HI 8~12kW | Installer Manual

Email us: sales@sunsynk.com Call us UK: +44 151 832 4300 VAT Number: 175669460 UK Address: Sunsynk, 17 Turnstone Business Park, Mulberry Avenue. Widnes, Cheshire, WA8 0WN.

Ltd

Powered by

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals