Reettic RCTG106E Set of 2 Nightstand with Charging Station Instructions

June 14, 2024
Reettic

Reettic RCTG106E Set of 2 Nightstands with Charging Station

General Guidelines

  • Please read the following instruction carefully and use the product accordingly.

  • Please keep this manual and hand it over when you transfer the product.

  • This summary may not include every detail of all variations and considered steps. Please contact us when further information and help are needed.
    Notes

  • The product must be assembled and used in accordance with the provisions of the manual.

  • There may be some odour after unpacking the parcel, please put this item in a ventilated place for a few days and the odour will dissipate.

  • If there are any defective or missing parts after unpacking, please cease assembly and get in contact with us immediately. Please assemble this item on a soft surface.

  • During assembly, align all the screws with the corresponding pre-drilled holes first and then tighten the screws one by one.

  • Periodically inspect screw tightness while the product is in use. If necessary, retighten to ensure structural integrity.

  • Please remove all items on the product before moving.

  • The total max. static load capacity of this item is 50 kg (110 lb), that of the drawer is 15 kg (33 lb). Please do not place overweight items on the product.
    Warnings

  • During the assembly process, keep any small parts out of the reach of children. It may be fatal if swallowed or inhaled.

  • To avoid the potential dangers of suffocation, please keep all parts and packaging (films, plastic bags and foam, etc.) away from babies and children.

  • Do not stand or sit on the product.

  • Never touch with sharp objects or corrosive chemicals, which may damage the surface of the item.

  • Do not expose product to direct sunlight or rain; and do not put it in a humid place.

PARTS

Reettic -RCTG106E- Set -of- 2 -Nightstand -with -Charging -Station-
FIG-1Reettic -RCTG106E- Set -of-
2 -Nightstand -with -Charging -Station- FIG-2Reettic -RCTG106E- Set -of- 2 -Nightstand -with -Charging
-Station- FIG-3

Tools Required

  • Bolt
  • connection piece
  • Adjust connecting piece direction until it is properly lined up with the hole
  • Insert bolt when connecting piece direction is properly line up

Reettic -RCTG106E- Set -of- 2 -Nightstand -with -Charging -Station-
FIG-9

what in the box

Reettic -RCTG106E- Set -of- 2 -Nightstand -with
-Charging -Station- FIG-10.

INSTALLATION

Reettic -RCTG106E- Set -of- 2 -Nightstand -with -Charging -Station-
FIG-11 Reettic -RCTG106E- Set
-of- 2 -Nightstand -with -Charging -Station- FIG-12 Reettic -RCTG106E- Set -of- 2 -Nightstand -with
-Charging -Station- FIG-13 Reettic -RCTG106E- Set -of- 2 -Nightstand -with -Charging -Station-
FIG-14 Reettic -RCTG106E- Set
-of- 2 -Nightstand -with -Charging -Station- FIG-15 Reettic -RCTG106E- Set -of- 2 -Nightstand -with
-Charging -Station- FIG-16 Reettic -RCTG106E- Set -of- 2 -Nightstand -with -Charging -Station-
FIG-17 Reettic -RCTG106E- Set
-of- 2 -Nightstand -with -Charging -Station- FIG-18 Reettic -RCTG106E- Set -of- 2 -Nightstand -with
-Charging -Station- FIG-19 Reettic -RCTG106E- Set -of- 2 -Nightstand -with -Charging -Station-
FIG-20 Reettic -RCTG106E- Set
-of- 2 -Nightstand -with -Charging -Station- FIG-21

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals