ECOFLOW Porcelain Be Dry Pedestal Instruction Manual
- June 13, 2024
- ECOFLOW
Table of Contents
Porcelain Pasadero Pedestal
Installation Instructions
FLOOR TEMP LATE
FT-PAS.201021
Porcelain Be Dry Pedestal
Mounting Bracket Location.
Brackets supplied. Please check the location before mounting the bracket as
the pedestal is man made.
PLACE PAPER EDGE ALONG WALL
Mounting Bracket Location.
Brackets supplied. Please check the location before mounting the bracket as
the pedestal is man made.
NOTE Porcelain Pedestal = approx. 210mm from the wall to the centre of
the chute.
Overall footprint of pedestal = 445mm x 300mm.
FRONT OF PORCELAIN PASADERO
Items provided
• Pedestal, seat and lid
• Sullage hose
• Metal clamp
• Floor template| • T-piece
• 2x mounting brackets
• 2x anchors
• 2x metal washers| • 2x mounting bracket screws
• 2x mounting pedestal screws
• 2x plastic washers
• 2x screw caps
---|---|---
Tools required
• Jigsaw
• Power drill
• Masonry and brad point drill bits
• Hole-saw drill bit ø5cm| • Short flathead screwdriver
• Philips screwdriver
• Measuring tape
• Sticky tape| • Marker
• Silicone/caulk gun
---|---|---
Steps
- Find the best location and position for the pedestal using the Porcelain Pasadero Floor Template provided, then tape the template down. Cut out the hole for the waste chute with a jigsaw. Insert the waste chute into the hole. Place the composting chamber without its lid under the chute to see if the chute needs to be shortened. If so, mark it then cut it with a jigsaw. (This step is demonstrated in Ecoflo’s Porcelain Palisade Pedestal Installation Video)
- Cut out the smaller hole shown on the floor template for the sullage hose using a hole-saw or jigsaw.
- Place the mounting brackets within their matching locations on the floor template making sure they line up with the holes on the sides of the pedestal. Drill holes through the brackets into the floor for the anchors. Remove the floor template, insert the anchors, screw down the mounting bracket screws and metal washers until brackets are secured (refer to figure 1).
- Hook the metal clamp around one end of the sullage hose.
- Connect the same hose end to the urine-diverting hole within the pedestal.
- Using a flathead screwdriver, tighten the clamp until the connection is firm and secure.
- Insert the rest of the hose down the small floor hole.
- Bring the pedestal into position over the waste chute and mounting brackets. Silicone may be applied around the base of the pedestal to add cushion and support on uneven surfaces.
- Drill the mounting pedestal screws with the plastic washers through the holes on the sides of the pedestal into the mounting brackets. Tighten with a manual screwdriver as using a drill could damage the porcelain. Place the screw caps over the mounting pedestal screws (refer to Figure 1).
- Attach the seat and lid to the pedestal by the connection points.
- The sullage hose can be lead all the way into the absorption trench or into a collection bottle (not provided). Or, it can be connected to the composting chamber’s excess liquid hose using a T-piece (provided). Refer to diagrams on the next page.
Operation
- Always be seated when using a urine separating toilet. Standing could cause urine to splash out of the pedestal.
- Pour a cup of water into the urine bowl after each use, or weekly with boiling/hot water.
- Close the toilet lid after each use.
Urine Diverter Hose Outlet Options
-
Option 1:
Urine diverter hose →Absorption trench -
Option 2:
Urine diverter hose →Collection bottle (not provided) -
Option 3:
Urine diverter hose → Chamber excess liquid hose (using T-piece provided) → Absorption trench
©Ecoflo Wastewater Management
IMECO-002.010222
Documents / Resources
|
ECOFLOW Porcelain Be Dry
Pedestal
[pdf] Instruction Manual
Porcelain Be dry Pedestal, Porcelain, Be dry Pedestal, dry Pedestal, Pedestal
---|---
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>