G2 Post and Pier Mounted Outdoor Fixtures Instruction Manual

June 13, 2024
G2

Instruction Manual

Installation Instructions

For Post and Pier Mounted Outdoor Fixtures
CAUTION:
FAILURE TO INSTALL THIS FIXTURE PROPERLY MAY RESULT IN SERIOUS PERSONAL INJURY OR DEATH AND PROPERTY DAMAGE. We recommend installation by a licensed electrician.
This product must be installed in accordance with applicable installation code(s), by a person familiar with the construction and operation of the product and the hazards involved.*
Caution: Do not exceed maximum wattage noted on fixture. Use only recommended bulbs with fixture.

Component Parts
Note: Fixture, Post and Cover Cap each sold separately.
A J Bolts – Included with optional post/pier mount
B Fixture post – optional and sold separately
C Washers (4) – Included with optional post/pier mount
D Split washers (4) – Included with optional post/pier mount
E 5/16 nuts (4) – Included with optional post/pier mount
F Cover Cap – optional and sold separately
G Fixture
H Set screw
I Glass
J Rubber Strip
K Fixture Collar

G2 Post and Pier Mounted Outdoor Fixtures - Component
PartsThis illustration represents a typical fixture and may not match every style.

To Install
Caution: Be sure power is off at the main breaker box prior to installation.

Site Preparation

  1. Run appropriate wiring to the site of the fixture, leaving enough excess wire to reach the top of the post, plus 12 inches.
  2. Pour flat and level concrete base with wiring emerging at the center. Insert J bolts (A) so approximately 1″ of the bolts are exposed above the concrete. Position J bolts according to the supplied template. Allow concrete to cure before installing fixture.

Installation
Note:
Post may be cut to length as desired before installation begins.

  1. Position post over J bolts allowing supply wire to run up though the post and secure using washers (C), split washers (D) and nuts (E).

  2. Place optional cover cap (sold separately) (F) over post to conceal mounting hardware.

  3. Connect fixture wires to supply wires using appropriate wire connectors (not provided), black to black, white to white and bare copper or green to bare copper or green. If fixture is wired with twin lead lamp cord, connect smooth side of fixture wire to black and ridged side to white.

  4. Install the rubber strip (J) centered on each inside wall of the fixture collar.

  5. Place fixture (G) onto post carefully tucking all wiring down into post and making sure no wires are pinched between the post and the fixture. Secure with set screw (H).

  6. Install 150-watt max type A light bulb and glass (I).
    Note: The glass tube is mouth blown. Minor irregularities, including being slightly out of round, are normal. It may be necessary to turn the glass in relation to the fixture to achieve a good fit.

  7. Restore electricity to breaker.

  • Hubbardton Forge will not be liable for injury or damage caused by improper installation, lamping or use of this fixture.

For Post Mounted Outdoor Fixtures

Use this template to position J bolts and wireway in concrete slab prior to installing outdoor post mounted lighting fixture.

G2 Post and Pier Mounted Outdoor Fixtures - Outdoor
Fixtures If you need further assistance, or find that you are missing any parts, please contact the dealer from which you purchased this product. We hope you enjoy your fixture!

Hand-Forged, Vermont-Made Lighting and Accessories
P.O. Box 827, 154 Route 30 South, Castleton, Vermont 05735
14823 Rev B

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

G2 User Manuals

Related Manuals