DANCOVER PA153015 Bioclimatic Pergola Gazebo San Pablo Instruction Manual

June 4, 2024
DANCOVER

DANCOVER logo PA153015 Bioclimatic Pergola Gazebo San Pablo
Instruction Manual

Manual Instruction
Pergola
3x3m, 3x4m, 4x4m

DANCOVER PA153015 Bioclimatic Pergola Gazebo San Pablo

Spare parts list

Label
No| Part description| Drawing| Qty
---|---|---|---
A| Column| | 4
B1| Beam (Left)| | 1
B3| Beam (Right)| | 1
C| Front and rear beams| | 2
D| Middle beam| | 1
E| Flap| | 3×3=44
3×4=60
4×4=60
F| Column bottom plate| | 4
G| Column cover
plate| | 4
H| Connectors for middle
beams| | 2
I| Hinge ring| | 2
J| Hand crank| | 2
Label
No.| Part description| Drawing| Qty
---|---|---|---
K1| Countersunk head screw| | 40+2
| Pan’s head screw| | 20+2
K3| Flat washer| | 8+2
K4| Screw I nut| | 2
L| Woodworking screw+  plastic expansion pipe +Flat washer| | 16
M| Glass glue| | 1
N| Plastic jam| | 3×3=88 3×4=120 4×4=120
0| Corner support| | 8
K5| Self-drilling screw ST  .2×25| | 32
Please Note: 0 and K5 is optional…, if you do need to install them, please refer to the last page first.

  1. Install the bottom plate F on column A, and tighten the screw K1; complete 4 sets in sequence.
    DANCOVER PA153015 Bioclimatic Pergola Gazebo San Pablo - Figure
1

  2. Match the connector H with one side of middle beam D, then tighten the screw K1; then complete the other side.

  3. Put two hinge rings I into the gearbox drive shaft on the beam D, fix the screw + nut K4

  4. Place the column and beam as shown in the figure, and note that the drain port of the column faces the same side;

  5. The two ends of one front and rear beam C are respectively placed on the corner connectors on the column, and the screws K1 are tightened;
    DANCOVER PA153015 Bioclimatic Pergola Gazebo San Pablo - Figure
6

  6. The left and right beams B1/B2 are connectors on the column, and respectively placed on the corner the screws K1 are tightened;
    DANCOVER PA153015 Bioclimatic Pergola Gazebo San Pablo - Figure
7

  7. Insert ends of the other front and rear beams C into the corner connectors on the column, and tighten the screws K1;
    DANCOVER PA153015 Bioclimatic Pergola Gazebo San Pablo - Figure
8

  8. The 4-column cover plates G are respectively mounted on the corner connectors of the column and the beam, and the screws K2 are tightened in turn;
    DANCOVER PA153015 Bioclimatic Pergola Gazebo San Pablo - Figure
9

  9. Adjust the position of the four columns so that they are perpendicular to the ground.
    Meanwhile, the width of the top of each two columns should be measured in accordance with the width of the bottom of each two columns. Then use a marker pen to mark 16 holes on the ground, which should correspond to the holes in the botton plate.
    DANCOVER PA153015 Bioclimatic Pergola Gazebo San Pablo - Figure
10

  10. Remove the product from the mark and drill holes at 16-mark positions on the ground with a percussion drill.
    DANCOVER PA153015 Bioclimatic Pergola Gazebo San Pablo - Figure
11

  11. Place the plastic expansion pipe in the bottom hole of the column; then move the product back to the hole drilled, align holes of the column bottom plates with the hole  drilled on the ground; then set L1 into the woodworking screw L, and fix it with the ground separately.
    DANCOVER PA153015 Bioclimatic Pergola Gazebo San Pablo - Figure
12

  12. Coat the glass glue M evenly on the drain of the column and joints of the beams.
    DANCOVER PA153015 Bioclimatic Pergola Gazebo San Pablo - Figure
13

  13. Place the middle beam D on the front and rear beams C.

  14. Insert 6pcs flap (E) first (4 pieces at gearbox side and 2pcs on another side) on the end of the brackets on both sides of the beams (B1-D and B2-D), and press down on the slat as shown in the sketch below to secure it.
    DANCOVER PA153015 Bioclimatic Pergola Gazebo San Pablo - Figure
15

  15. First, fix screw K2 with gasket K3 and align it with a hole below beam D, then the same to beam C. Insert the other flap in turn.
    DANCOVER PA153015 Bioclimatic Pergola Gazebo San Pablo - Figure
16

  16. Adjust according to the below steps if the pergola can`t close completely
    DANCOVER PA153015 Bioclimatic Pergola Gazebo San Pablo - Figure
17

  17. Insert plastic jam N into two sides of each flap.
    DANCOVER PA153015 Bioclimatic Pergola Gazebo San Pablo - Figure
182. Turn on the flap to half position, and insert the plastic jam N into the hole of two ends of each flap in turn.

  18. Put the hand crank J on, and turn to open/close the flap; installation completed.
    DANCOVER PA153015 Bioclimatic Pergola Gazebo San Pablo - Figure
19Install corner support (Optional)
    Align the corner support O with the bottom edge of beam B1, fix it with self- drilling screw K5, and install the remaining corner support in turn.
    DANCOVER PA153015 Bioclimatic Pergola Gazebo San Pablo - Figure
20

DANCOVER logo Contact information


https://www.dancovershop.com/fr/nous-contacter.aspx| https://www.dancovershop.com/de/impressum.aspx
https://www.dancovershop.com/chde/impressum.aspx| https://www.dancovershop.com/uk/contact-us.aspx
https://www.dancovershop.com/at/impressum.aspx| https://www.dancovershop.com/befr/nous-contacter.aspx

For more information please visit: www.dancovershop.com

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

DANCOVER User Manuals

Related Manuals