SOLAHART370V1 Single Phase PV Systems Installation Guide
- June 12, 2024
- Solahart
Table of Contents
Single-Phase PV Systems
SunCell Modules
SOLAHART370V1
Installation Manual
Introduction
We appreciate for your trust and confidence towards the photovoltaic (PV)
module products from Solahart.
Please read all instructions and the electrical and mechanical requirements in
this manual carefully before installation. Specialized skills are required for
installing and operating PV modules, and only professionals are capable to
perform this task. All safety precautions in this manual shall be strictly
observed during installation, and the manual shall be properly kept for
further reference. The installer must inform the end customer (or consumer)
accordingly.
1.1 Purpose
This document provides detailed instructions and safety precautions regarding
the installation, electrical connection, and maintenance of following Solahart
SunCell PV modules : SOLAHART370V1
1.2 Scope of liability
No warranty expressed or implied is made with regard to any information in
this manual because how this manual is complied with is beyond the control of
Solahart. Solahart shall not be liable for any form of loss, including but not
limited to loss, damage, casualty or additional cost caused by improper
installation, operation, use and maintenance of PV modules and systems.
Solahart reserves the right to update this manual without prior notice.
Regulations
The mechanical installation and electrical connection of PV systems should be performed in accordance with local laws, regulations and corresponding international and domestic standards including electrical codes, building codes and electrical connection requirements. Such requirements may vary from different mounting location, e.g. rooftop system and floating systems. Requirements may also vary with system voltage and for DC/AC applications. Please contact local authorities for detailed governing regulations. In Australia installations should be in accordance to AS/NZS 3000 and AS/NZS 5033.
Safety Precautions
- Solahart SunCell modules are designed to meet the requirements of IEC61215 and IEC61730, and they have been qualified for Application Class A (equivalent to Safety Class II requirements). Modules can be applied to publicly accessible systems operating at greater than 50V DC or 240W.
- The module design complies with IEC61730 and UL61730 standards and meets Class C fire rating (IEC61730), type 4 fire rating (UL61730).
!WARNING
Read and understand all safety instructions before installing, wiring,
handling, and/or maintaining PV modules. PV modules generate direct current
electricity when they are exposed to sunlight or other light sources. Whether
the module is connected or not, direct contact with the live part of the
module such as the wiring terminal may cause personal injury or even death.
3.1 General safety
- Before installation, please contact the relevant local authority to make sure the installation permit and installation inspection requirements can meet the local requirements. The installation process should comply with the safety rules applicable to all components in the system, including cables, terminals, charging monitors, batteries, inverters, etc.
- Installation and maintenance must be completed by professionally qualified engineers. During the installation, wear safety helmets, insulating gloves, safety shoes and use insulating tools to avoid the direct contact with a DC voltage of 30V or even higher.
- When installing or operating PV modules on rainy days or dewy mornings, take appropriate protective measures to prevent moisture from penetrating the connectors. Unauthorized personnel are prohibited from approaching the installation area or PV module storage area.
- It is forbidden to install or use damaged PV modules.
- It is forbidden to repair PV modules by unauthorized personnel, including but not limited to replacing any part of PV modules (such as diodes, junction boxes, connectors, etc.).
- It is forbidden to plug in connectors of different types and models.
- It is forbidden to expose PV modules to the following substances: grease or organic ester compounds (e.g. DOP, plasticizers), aromatics, phenols, ketones, halogenated substances, mineral oil, alkanes (e.g. gasoline, cleaning lubricants, electronic resurrection agents), alcohol, , adhesive sheets that can generate oxime gas and potting glue (only for connectors, such as KE200, CX-200/chemlok, etc.), TBP (plasticizer), detergent, etc., to avoid chemical damage and affect the electrical safety performance of PV modules.
- Photovoltaic module installation is prohibited on windy days.
- Avoid focusing sunlight on PV modules.
- It is forbidden to place PV modules near equipment or where flammable gas may be generated.
- It is forbidden to install PV modules on movable platform, excepting tracking systems.
- It is forbidden to disassemble and move any part of the PV module; if the connector of the PV module is wet, do not perform any actions to avoid the risk of electric shock.
- It is forbidden to connect or disconnect the PV module when there is electrical current or external electrical current.
- The cover of the junction box should always be kept closed.
- Avoid partial shading of PV modules for a long period of time, otherwise the temperature of the shaded module may rise due to hot spot effect, burning the module and causing fire hazard in severe cases.
- For PV modules used in deserts or windy and sandy areas, it is recommended to use connector dust caps before installation or take other measures to prevent sand and dust from entering the connectors, otherwise it may cause insertion problems or electrical safety hazards.
3.2 Operation safety measures
- Avoid package damaging and falling during transportation and storage. Ensure the packing cases are well ventilated, water-proof and dry. After the arrival, carefully open the outer package and prevent scratches and bumps of PV modules. When stacking PV modules, strictly follow the stacking requirements in chapter 4.3.
- Avoid impact or scratches on any part of the PV module, otherwise the reliability and safety of the PV module will be affected; standing or walking on the PV module is prohibited; at the same time, in order to avoid glass damage, it is forbidden to apply excessive load or distorted PV modules.
- Do not install or carry PV modules by one person. It is forbidden to pick up, drag, or move PV modules by grabbing the junction box (including the box body, cables, and connectors); when placing a PV module on a flat surface, it must be operated carefully and be aware of bumps in the corners.
- When installing or repairing the PV system, do not wear any metal accessories to avoid the risk of electric shock; if it is installed far above the ground, please wear a seat belt.
- When operating PV modules in the sun, please use insulated tools, and wear rubber gloves and protective clothing. At the same time, in order to avoid the risk of arc and electric shock, do not directly touch the junction box and the end of the output cable (connector) with bare hands.
- For electrical connection, choose a dry and weak- light morning or evening; or use opaque materials to completely cover the surface of the PV modules to prevent current generation.
- A certain distance between the PV module and the installation surface should be kept to prevent the installation surface from touching the junction box.
- When installing on the roof, comply with the fire protection requirements of the building. It is recommended to install PV modules on a fireproof and insulated roof covering, and ensure adequate ventilation between the PV modules and the installation surface. In order to ensure the fire rating on the roof, the minimum distance between the frame of the PV module and the roof surface is 10cm.
- The connector must be fully mated when wiring. If the cable is too long, it is recommended to fix the cable to the rack system with a UV-resistant nylon cable tie. When fixing the cable to the rack, the bending radius of the cable should not be less than 48mm.
- Avoid directly exposing cables and connectors to sunlight. Please use anti-UV cables.
- Do not disconnect the electrical connection when there is a load.
- It is strictly forbidden to try to disassemble the PV module, and it is strictly prohibited to remove the nameplate of the PV module or other parts on the PV module; it is strictly forbidden to paint or apply any adhesive on the surface of the PV module.
- It is strictly forbidden to drill holes in the frame of the PV module.
- It is strictly forbidden to scratch the anodized layer on the surface of the aluminum alloy frame, except when it is connected to the ground. Scratches may cause corrosion of the frame, affecting the frame’s load-bearing capacity and long-term reliability.
- If the PV module glass or other packaging materials are damaged, please wear personal protective equipment to separate the PV module from the site or the circuit. It is strictly forbidden to touch wet PV modules, unless you are wearing electric shock protection equipment that meets the requirements.
- When professionals replace or repair PV modules, do not damage the surrounding PV modules or their support structures.
- When cleaning PV modules, you must follow the cleaning requirements of PV modules.
- The connectors must be kept dry and clean to ensure that they are in good working condition. Do not insert other metal objects into the connector or make electrical connections in any other way.
Handling and unpacking
- If the PV module is not in use, please do not open the product packaging. The goods should be stored in a dark, dry and ventilated place. If the PV modules are stored in an uncontrollable environment, the storage time must be less than 3 months when the outer packaging of the PV modules is kept intact.
- It is recommended to unpack an appropriate number of PV modules per day according to the project progress, and the unpacked PV modules should be installed within a day. If unpacking too many PV modules and being stacked on the ground, in severe weather such as heavy rain and typhoons, the PV modules may be immersed in water for a long time affecting the reliability of the product or be scraped away.
4.1 Transport
- During the transportation of the PV modules to the project site, they must be packed in the packaging box provided by Solahart, and they should be stored in the original packaging box before installation. Please protect the packaging from damage.
- It is necessary to ensure the safety when unloading PV modules, especially when hoisting roof projects. It is forbidden to use lifting straps directly on the pallet for hoisting. The PV modules should be placed in a protective device and then hoisted to the roof to prevent the packing box from deforming and bumping against the wall during the hoisting process.
!Special instructions
Due to the limitation of the height of the container, when the PV modules are
removed from the container, the distance between the upper surface of the
forklift tines and the ground should be less than 80mm, otherwise collisions
may easily occur, which may damage PV modules.
4.2 Unpack
When unpacking, you need to tear the stretch film first, then use a knife to
cut the binding tape, and remove the packing box cover.
If the inner packaging is fixed with anti-falling tape, two people in a group
should hold the frame with both hands in the same direction to take out one
piece of PV module each time. Take out the PV module by tearing a piece of
fixing glue, and do not remove the fixing tape at one time to prevent the
whole PV module from tipping. Unpacking should follow the steps of tearing off
one piece of the fixing tape followed by taking out one piece of PV module,
instead of tearing off all fixing tape which may cause module collapsing. If
the internal packaging is fixed by the internal packing belt, first cut the
internal packing belt, use anti-inverted sticks and other non-sharp and stable
items to prop up one of the long-side enclosure frame, and then cut the other
side of the frame. Two people in turn move and take out the PV modules. The
whole handling process needs to be handled gently to avoid any collision with
hard objects and any part of the frame dragging on the ground.
4.3 Stack
When taking out the PV module from the packing box, put the cardboard on the
ground first to prevent the PV module from colliding and scratching with the
cement surface, hard object on the ground, color steel tile, metal corrugated,
etc.
When the PV modules are stacked, they must be neatly and stably stacked on a
horizontal surface, and stacked with the glass side facing down and the back
side facing up. At the same time, there must be cardboard bedding under the PV
modules. For example, when installing PV modules on the roof, the number of
piles should not exceed 20. For roofs with poor load-bearing capacity, it is
recommended that the designer or installer evaluate the load-bearing capacity
of the roof and reduce the load-bearing unit area of the roof by reducing the
number of piles. At the same time, avoid installation tools and other objects
on the surface of the PV module.
Solahart PV modules adopt high and low current bins, and the handlers need to
place them separately and mark them according to the markings on the power
list on the PV module outer packaging (for example, 270W-L means low current
bin; 270W-H means high current bin;the current division method required by
other customers is similar); According to the system design requirements,
modules of the same current bin are usually required to be installed in the
same array.
If the customer requires PV modules to be distinguished by color, the outer
packaging box shall be marked accordingly, and the PV modules shall be marked
to prevent confusion when they are taken out of the packaging box and stacked
up. According to the system design requirements, the color of PV modules in
the same row or the same array should be the same.
Mechanical installation
5.1 Environment
- Recommended ambient temperature: -20°C to 50°C; extreme operating ambient temperature for PV modules: -40 °C to 85°C.
- Mechanical load on PV modules: under standard installation conditions, the maximum tested snow/wind load is 5400 Pa/2400 Pa and the design load (considering a safety factor of 1.5 times) is 3600 Pa/1600 Pa. Refer to 5.3 for detailed installation and mechanical loads.
- PV modules are strictly forbidden to be installed and used in environments with excessive amounts of hail, snow, hurricanes, sand, soot, air pollution, and etc. PV modules are strictly forbidden to be installed or used in environments where there are strongly corrosive substances (e.g. salt, salt spray, brine, active chemical vapors, acid rain, strong vapor confined environments or any other substance that will corrode PV modules and affect their safety or performance).
- If the PV modules will be installed in special environments such as high temperature and high humidity environments, humid salt-mist environments (C3+areas specified in ISO 9223), marine and floating environments and farms, the purchaser or user needs to inform Solahart in advance. The types of PV modules, BOM, and warranty issues will be decided by mutual agreement between the parties.
- If the above precautions are not observed, Solahart warranty will be void.
5.2 Tilt angle selection
The tilt angle of a PV module refers to the angle between the surface of the
PV module and the ground surface, as shown in Fig. 1. The power output of a PV
module is maximized. when it faces the sun directly.
For northern hemisphere, PV modules should preferably face south. For southern
hemisphere, PV modules should preferably face north. For detailed mounting
inclination, please follow local regulatory guidelines or the recommendations
of an experienced installer. Solahart recommends an installation tilt angle of
no less than 10°, so that when it rains, the dust on surface is easily carried
away by the rainwater, thus reducing the number of times of clean; at the same
time, it helps the water on the surface of the PV module to flow away,
avoiding the long-term accumulation of large amounts of water on the glass
surface, which can affect the appearance and performance of the PV module.
PV modules connected in series should be installed in the same orientation and
angle. Different orientations and angles may result in different amounts of
solar radiation being received by each module, resulting in power loss.
5.3 Mounting Guide
- PV module mounting system must be composed of durable, corrosion-resistant and UV-resistant materials, and it must be inspected and tested by a third-party testing organization with static mechanical analysis capabilities meeting national and regional regulations or corresponding international standards.
- The PV module must be securely fastened to the mounting system. If the PV module is mounted in a snowy area, the height of the mounting system should be designed in a way that the lowest end of the PV module is not covered by snow. In addition, it should be ensured that the lowest end of the PV module is not shaded by surrounding trees or other vegetation. Fig 3. Bolt installation for 60cell
- When the PV module is mounted on a rack parallel to the roof, the minimum clearance between the PV module frame and the roof is 10cm, which is necessary for air circulation to prevent wiring damage of the PV module.
- The PV module frame will suffer thermal expansion and contraction effect, therefore the space between two adjacent PV module frames should be no less than 10mm when mounted.
For detailed installation methods, please refer to the following
specifications:
5.3.1 Bolted mounting
All modules must be securely fastened with at least 4 bolts (As shown in Fig.
2, Fig. 3, Fig. 4 , Fig. 5 and Fig. 6). The corresponding mechanical loads are
shown in Table 1.
!ATTENTION
In order to achieve maximum safety precautions against wind and snow loads,
it is recommended that all available mounting holes should be used. The bolt
installation steps are as follows (Fig. 7).
- Place the PV module on top of the rack.
- Insert 4 stainless steel bolts in corresponding mounting holes. The 9x14mm mounting holes match with M8 bolts, while the 7x10mm mounting holes match with M6 bolts. 7x10mm mounting holes are positioned with a hole pitch of 400mm.
- Make sure to use two stainless steel washers for each bolt, one on each side of the rack. Then screw on the top of a stainless-steel spring washer or toothed lock washer. Finally, lock with a stainless-steel nut.
- The tightening torque is recommended to be 9~12Nm for M6 bolts and 17~23Nm for M8 bolts. Due to the possible difference of bolt material, the specific torque value is subject to the information confirmed by the bolt supplier.
5.3.2 Clamped mounting
Photovoltaic modules can be installed across the support frame (Fig. 8) or
parallel to the frame of the photovoltaic module (Fig. 9). When using clamps
to install, each module must be secured with a minimum of 4 clamps.
!ATTENTION:
- The length of the rack must be longer than the PV module, otherwise it should be confirmed by Solahart in advance.
- The above two diagrams show the mounting method using aluminum clamps. “D” indicates the mounting range. Table 1 shows the recommended mounting position and corresponding machine loads.
- Each aluminum clamp is equipped with an M8 bolt, a flat washer, a spring washer and an M8 nut. The mounting steps are as follows::
- Place the module on the two supporting rails which should be made with stainless material and treated with an anti-corrosion process (e.g. hot dipped galvanizing). Each PV module needs at least four clamps to be fixed. The module clamps should not come into contact with the glass and should not deform the frame, otherwise they may cause module damage.
- Be sure to avoid shadowing effects from the module clamps. Weep holes on the module frame must not be closed or obscured by the clamps. The clamp must have at least 8mm but no more than 11mm overlap with the frame of the module (The clamp section can be changed under the premise of ensuring reliable installation).
- The top surface of the rail contacted with module frame should be equipped with grooves compatible with an M8 bolt.
- If the grooves are not provided, holes of a suitable diameter may need to be drilled to allow bolts attaching to the rail at the same locations as mentioned above.
- Ensure that the mounting sequence of each clamp is in the order of flat washer, spring washer and nut.
- There are two types of clamps, the mid clamp shown in Fig 10 and the fringe clamp shown in Fig 11 and Fig. 12. The mid clamp has dimensions of a ≥40 mm, b≥26 mm, c≥5 mm, d≥28 mm, Ø =9 mm. For module of 182mm-wafer, the size of mid and fringe clamp must meet a ≥ 60 mm. The tightening torque is suggested to be 17~23Nm for Class 8.8 screw and bolts.
- To prevent modules from coming off the fixed device after installation, it is suggested to choose fringe and mid clamps and make contact with the A side of the frame with groove patterns. Suggest to have 9 patterns with a space between 2 adjacent patterns of 1.2mm and a depth of 0.6mm, as shown in figure 11.
- For the installation method shown in Fig. 9, the module needs to be fixed with professional clamps (as shown in Fig. 13), and the overlap between the C side of the module and the rail should be ≥ 15mm. Solahart limited warranty will be void if improper clamps or improper installation is used.
Table 1 Installation range and corresponding values
Module type| Dimensions
LWH (mm)| Installation Method
---|---|---
Fig 2 & Fig 3 & Fig 4| Fig 5| Fig 8| Fig 9| Fig 6
SOLAHART370V1| 1755 103835| +5400Pa – 2400Pa| —| +5400/-2400Pa Installation
scope 400-450mm| +1400/-1400Pa Installation scope 200±50mm| —
NOTE – In Australia installations should be in accordance to AS/NZS 3000 and AS/NZS 5033.
Electrical Installation
6.1 Electrical characteristics
The electrical characteristics are detailed in the PV module product manual.
The rated values of electrical characteristics, including Isc, Voc and Pmpp,
have some tolerance with the measured values at standard condition: ±5% for
Isc, ±3% for Voc and ±3% for Pmpp. The standard test condition refers to
1000W/m2, AM1.5 and cell temperature at 25℃.
According to IEC and UL standards, the standard maximum system voltage for the
regular module series is 1000V, the 1500V standard products are also available
according to the requirements. The IEC & UL standard maximum system voltage
for half-cell module series is 1500V (except for BL &LV series PV modules).
The actual maximum voltage must be less than the standard maximum system
voltage and the maximum output voltage of the inverter and other electrical
equipment installed in the system. The number of PV modules connected in
series should match the voltage specification of the inverter. The total
voltage generated by PV modules in series should not be higher than the
maximum voltage allowed by the system.
To ensure the above requirements, the open-circuit voltage of the string needs
to be calculated at the lowest expected ambient temperature at certain
location. This can be calculated using the following formula:
Maximum system voltage≥NVoc[1+TCvoc*(Tmin-25)] Where:
N: number of PV modules in a single string
Voc: open-circuit voltage of each PV module (refer to the PV module nameplate
or product manual)
TCvoc: temperature coefficient of PV module for open-circuit voltage (refer to
the PV module product manual)
Tmin: minimum ambient temperature.
!ATTENTION
- Under normal operating conditions, the output current and/or voltage of the PV module may be higher than the value under standard testing conditions. Therefore, in PV system design, for example determining the rated voltage of equipment, current carrying capacity of wires and fuse and parameters associated with the output power of PV modules, the corresponding short- circuit current and open-circuit voltage should be applied with a safety factor of 1.25. The number of PV modules connected in series should match the voltage specification of the inverter. The total voltage generated by the PV modules connected in series cannot be higher than the maximum voltage allowed by the system.
- According to the National Electrical Code 690.8, the parameters need to be multiplied by an additional 125% (80% derating) factor, i.e. the parameters including the optimum operating current and voltage at standard test condition (STC) needs to be multiplied by the square of 1.25 when determining voltage ratings, conductor capacities, fuse ratings, and control sizes for PV output.
- Depending on the maximum rated fuse current of the PV module and the local electrical installation standards, the connection of parallel strings of PV modules needs to be equipped with suitable fuses or preventive diodes for circuit protection purposes.
6.2 Electrical connection
To ensure the normal operation of the system, make sure the polarity of cables
is correct when connecting modules or loads, such as inverters and batteries.
If the PV module is not connected correctly, the bypass diode may be damaged.
Fig. 14 shows how the PV modules are connected in series and parallel. PV
modules can be wired in series to boost the voltage. Series connections are
made by connecting the wire from the positive terminal of one module to the
negative terminal of the next module. PV modules can be wired in parallel to
increase the current by connecting the positive terminal of one module to the
positive terminal of the next module. If a module is not connected correctly,
the bypass diode may be damaged.
!ATTENTION
- If one PV module string (or PV array) is connected to another with opposite polarity, irreversible damage can be caused to the PV module product. Be sure to confirm the voltage and polarity of each string before making a parallel connection. If measurements reveal opposite polarity or a voltage difference greater than 10V between the strings, check their structural configuration before proceeding with the connection.
- The number of modules connected in series and parallel should be reasonably designed according to the system configuration.
- PV modules with different electrical performance models cannot be connected in one string.
- The system shall use special cables and connectors for PV system and ensure that all connections are securely fastened. The cable must be 4mm2 (i.e. 12 AWG) and withstand the maximum possible opencircuit voltage of the PV system.
- When fixing the cable to the rack, it is necessary to avoid mechanical damage to the cable or to the PV module. Do not press the cable hard. To secure the cable to the rack in the proper way, specially designed UV-resistant coils and cable clips must be used. Avoid direct sunlight and water soaking to the cable.
- Keep the connectors dry and clean and make sure that the nuts on the connectors are tightened before connecting them. Do not connect the connectors when they are damp, contaminated or in other bad conditions. Avoid exposing connectors to direct sunlight and soaking in water. Avoid the connectors falling on the ground or the roof. Do not plug or unplug the connectors when the PV module is in live state. When it is necessary to remove the connectors, ensure that the PV module is not in working condition and that professional unlocking tools and safety measures are used. Direct dragging and pulling is forbidden.
- The junction box of the PV module contains bypass diodes connected in parallel to the string of the PV module. The bypass diode in the junction box prevents module degradation due to shading or covering. Refer to the junction box diode specification provided in the relevant product datasheet for more details. I When the localized hot spot phenomenon occurs in the PV module due to partial shading or coverage, the diode in the junction box will start to work, so that the module current will no longer flow through the hot spot cell, to limit the heat and loss of the PV module. When a diode failure is suspected or found, please contact Solahart team and do not attempt to open the junction box cover.
6.3 Grounding
The PV modules are designed with an anodised, corrosion-resistant aluminum
alloy frame as a rigid support. To ensure safety and to avoid lightning
strikes and electrostatic damage to the PV modules, the PV module frame must
be earthed. The earthing device must be in full contact with the interior of
the aluminum alloy of the frame, penetrating the surface oxide film. The
following is the specific grounding method, as shown in Fig. 15.
-
The grounding requirements must be checked in accordance with the applicable regulations and standards before work is started.
-
Use the marked 5.5 mm grounding holes to ground the anodized frame. Use one M5 nut, two M5 cut washers, one M5 plain washer, one M5 spring washer, and one M5 bolt and the copper wire. All nuts, bolts, and washers shall be of type M5 and made of stainless steel (Fig. 15). Grounding hole location on the panel frame is shown in Fig. 16 below.
-
Insert the bolt through the cup washer and wrap the copper wire around the bolt. (Note that the copper wire cannot be attached directly to the aluminum.)
-
Insert the bolt through the cut washer and then through the hole in the aluminum frame.
-
Add the spring washer and nut on the other side of the bolt and tighten to secure all parts. The tightening torque should be 4~4.5N•m.
!ATTENTION -
Use UL-467 certified bonding and grounding devices, including Burndy (formerly Wiley Electronics) Washer Electrical Equipment Bonding (WEEB) and similar devices, such as barbed washers, that meet the requirements of UL- 467 and is suitable for electrical bonding and grounding of PV modules.
-
Other grounding methods may be used when the racking system is tested following the UL 2703 requirements.
-
Do not drill any additional grounding hole on the frame of the modules. The frame rails have pre- drilled holes marked with a grounding sign. These holes should be used for grounding purposes and should not be used for mounting the modules.
Maintenance
PV modules must be inspected and maintained regularly, especial ly during the
warranty period, which is the responsibility of the user. This helps to find
and figure out problems in time and ensure the safe and effective operation of
the PV system.
7.1 Routine Inspection
PV modules in PV arrays should be inspected regularly for damages, such as
glass breakage, cable breakage, junction box damage, cell cracks, and
backsheet breakage and other factors that cause functional and safety failures
of PV modules. If any of the above problems occurs, the supplier should be
notified to replace the broken module with a new one of the same type in time.
It is recommended to perform preventive inspection every 6 months and not to
replace the components of PV modules without authorization. When conducting
inspection or maintenance in term of the electrical and mechanical
performance, it is recommended that qualified professionals perform the work
to avoid electric shock or personal injury.
Take routine maintenance to keep PV modules free of snow, bird droppings,
seeds, pollen, leaves, branches, dust, stains, etc.
7.2 PV module cleaning
If the PV module has a sufficient angle of tilt (at least 15°), it is
generally not necessary to clean the PV module (as the rainfall will provide a
self-cleaning effect). If there is a large accumulation of dirt on the PV
module surface that has seriously affected the power production, the module
can be rinsed with water without detergent, and use a gentle sponge or brush
to clean the surface during the cooler hours of the day. Dust must not be
scraped or wiped off under dry conditions as this may result in tiny scuff
marks. For snow removal, the PV module surface can be cleaned with a brush
with soft bristles.
For more details on cleaning and maintenance, please refer to the PV Module
Cleaning Manual.
Modified version and date
- Rev 1.4, released in October 2022.
Solahart Industries Pty Ltd (A.B.N. 45064945848)
Registered Office
1 Alan Street (PO Box 7508, Silverwater, 2128) Rydalmere
New South Wales 2116
Australia
For SERVICE Telephone – 1800 638 011
Email us:solahart@solahart.com.au
or your nearest Solahart Dealer
For Sales Telephone – 1300 769 475 or your
nearest Solahart Dealerwww.solahart.com.au