M4860CL1-X Hydronic Unico Module Heating Instruction Manual
- June 12, 2024
- UNICO
Table of Contents
INSTALLATION MANUAL
FOR ‘M’ SERIES
AIR HANDLER UNITS
BULLETIN 30-020
IMPORTANT!
Please read before installation
For safe installation and trouble-free operation, you must:
- Carefully read this instruction booklet before beginning.
- Follow each installation or repair step exactly as shown.
- The unit must be installed in accordance with all local, state, and national wiring regulations.
- Pay close attention to all warning and caution notices given in this manual.
- The unit must be supplied with a dedicated electrical line.
If necessary, get help
These instructions are all you need for most installation sites and
maintenance conditions.
If you require additional help for a special problem, contact our customer
service department for additional instructions.
In case of improper installation
The manufacturer shall in no way be responsible for improper installation or
maintenance service, including failure to follow the instructions in this
document.
This appliance is not accessible to the general public as classified per IEC
60335-2-40 Clause 6.101.
WARNING
When wiring
ELECTRICAL SHOCK CAN CAUSE SEVERE PERSONAL INJURY OR DEATH. ONLY A QUALIFIED,
EXPERIENCED ELECTRICIAN SHOULD ATTEMPT TO WIRE THIS SYSTEM
- Do not supply power to the unit until all wiring and tubing are completed or reconnected and checked, to ensure the grounding.
- Highly dangerous electrical voltages are used in this system. Carefully refer to the wiring diagram and these instructions when wiring. Improper connections and inadequate grounding can cause accidental injury and death.
- Ground the unit following local electrical codes.
- The Yellow/Green wire cannot be used for any connection different from the ground connection.
- Connect all wiring tightly. Loose wiring may cause overheating at connection points and a possible fire hazard.
- This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction concerning use of the appliance by a person responsible for their safety.
- Children should be supervised to ensure that they do not play with the appliance.
- Means for disconnection must be incorporated in the fixed wiring in accordance with the wiring rules and codes.
Digital copies and additional Bulletins can be found online at:
tech.unicosystem.com
Installation Instructions
NOTICE TO INSTALLER AND EQUIPMENT OWNER: RETAIN THIS MANUAL AT THE JOB. SUFFICIENT BUILDING INSULATION IS ESSENTIAL FOR THE MOST ECONOMICAL OPERATION.
INTRODUCTION
General. The information on the following pages is to help the installer save
time, provide the best possible installation and insure continuous trouble-
free operation.
The Unico System is a complete indoor comfort system that includes an indoor
air handling unit and small duct system. The air handler and duct system were
designed to operate together to provide the proper airflow in every
installation. The conditioned air is supplied through a series of 2-inch ducts
as a stream of air that entrains and mixes the room air. This process of
aspiration produces a more even temperature distribution in the room.
The Unico ‘M’ Series air-handling units consist of various modules that are
easily latched together. The modules can be arranged in a vertical-up-flow,
vertical counter-flow and horizontal-flow configuration. They can be combined
as a heating-only, cooling-only, or heating and cooling air handler unit. See
Fig. 1. All insulated Unico System modules feature closed-cell insulation for
improved sound attenuation. There is no exposed fiberglass insulation.
Each module is available in five sizes: 1218, 2430, 3036, 3642, and 4860.
There are three basic modules: a blower module, a cooling module, and a
heating module. The blower module includes the blower wheel, blower housing,
motor, and electrical control box.
The cooling module includes a cooling-only refrigerant coil, a heat pump coil,
or a chilled water coil. The heating module is supplied as an empty cabinet
with room for a slide-in hot water coil.
The modules can be arranged to provide only the options needed as shown in
Figure 1 (with details on pages 26 and 27). Heating-only systems require the
blower module, the heating module, and a hot water coil. Cooling-only systems
include the blower module
and a cooling module. For heating and cooling all the modules are combined
with coils. The system may even be used for ventilation-only, using just the
blower module.
Unico designed and built blowers feature direct drive motors or EC motors and
are located in the air stream. Each blower wheel is balanced to Unico
specifications. The blowers feature a twist-and-lock motor mount for easy
maintenance (see page 21). The motorized blower assembly consists of the
motor, which is mounted to the inlet ring, and the wheel, which is mounted to
the motor shaft
Scope. These instructions apply to the Unico M-Series air handler units. For
heat pump coils, refer to Bulletin 30-024 for additional instructions.
Installation instructions for the air distribution system are covered in
Bulletin 30-005. Before beginning any installation, a detailed system layout
must be done in accordance with the System Sizing and Layout Procedure,
Bulletin 40040 and the Component Layout Instructions, Bulletin 40-030.
General Precautions and Safety Tips. Do not attempt to install or startup unit
without first reading and understanding the appropriate sections in this
manual.
Before operating, be sure the unit is properly grounded. Installation should
be in accordance with all local codes and regulations and with the National
Board of Fire Underwriters regulations. In case of conflict, local codes take
precedence. All electrical wiring should be in accordance with the latest
edition of the National Electrical Code and all local codes and regulations.
The unit is safety certified to UL 1995 and listed with ETL.
Always install a secondary drain pan when an overflow of condensate could
cause damage.
Options. Other options and modules are also available to add additional
features or to simplify installation.
These include an electric duct heater, multiple return plenum, and a vertical
plenum stand. Please refer to the latest Unico Catalog for information on
these and other options.
Unpacking. All modules are inspected prior to shipping and are carefully
packaged in individual cartons. Inspect all cartons prior to unpacking. Notify
carrier of any damage.
Open each carton to remove the modules. Inspect unit for visible signs of
concealed damage and notify carrier of any such damage.
All materials are sold FOB Factory and it is the responsibility of the
consignee to file any claims with the delivering carrier for materials
received in damaged condition.
The expansion valve is shipped loose for all coil modules.
For the M1218, before installation, remove the motor shipping support located
between the motor and the top of the unit.
PART NUMBERS
This manual does not always include the latest revision letter when referring to UPC part numbers. Refer to the latest Price List and Spec Sheets for the current UPC revision letter. For example, in UPC-00x the ‘x’ indicates the latest revision.
LOCATION
Locate the air handler to minimize the number of plenum elbows and fittings while keeping the supply duct runs as short as possible. (See Bulletin 40-030,Component Duct Layout Design). Provide minimum clearance on both sides for servicing the unit as shown in Fig. 1.
If installing the unit in an attic, avoid placing the unit above a bed or
other place where noise is critical. The ideal location is above a central
hall, a closet, a bathroom, or any normally unoccupied space.
The unit can also be installed in a closet, crawlspace, or basement. If the
local codes allow, the unit may be installed in the garage provided the
ductwork is well sealed, especially the return duct.
Although the unit is not designed for outdoor use, it may be located outside
provided adequate weather protection is used; typically, a roof installation
requires mounting on blocks with a sheet metal cover or cap to protect the
unit from rain and extreme weather conditions.
Table 1. Return Air Box Opening
Model | Return Air Box Part No. | Size of opening, inches (mm) |
---|---|---|
1218 | UPC-01-1218 | 14 3 /8 x 20 ½ (365 x 521) |
2430 | UPC-01-2430 | 14 3 /8 x 25 ½ (365 x 648) |
3036 | UPC-01-3036 | 14 3 /8 x 30 ½ (365 x 775) |
3642 | UPC-01-3642 | 14 3 /8 x 30 ½ (365 x 775) |
4860 | UPC-01-4860 | 24 3 /8 x 30 ½ (619 x 775) |
UPC-01-4860NC | 20 3 /8 x 30 ½ (518 x 775) |
Be sure to position the return air box and filter near the unit allowing at
least one 90° bend in the return duct for proper acoustical performance (refer
to Figure 3 for a typical horizontal attic installation). The section on
Return Air Ducts in the manual provides more details.
All modules except the 4860 cooling module are designed to fit through a
14-inch (356 mm) opening, typical of a joist spaced at 16-inch (406 mm) center
distance. The 4860 module requires an 18.5-inch (470 mm) opening. If no access
is provided, an opening must be cut. It is suggested to use the opening
required for the return air box, especially in an attic installation. The
opening for the return air box is listed in Table 1.
If the joists or studs are less than 16-inches (406-mm) center-to-center or
running the wrong direction it willbe necessary to cut and header the joists.
EC MOTOR TEMPERATURE LIMITS
The Unico EC motor includes an electronic circuit board that is sensitive to
overheating if the air temperatures surrounding the motor are above a certain
value. The motor will not function above its maximum operating temperature.
The motor life will be reduced between the maximum operating temperature and
the normal temperature limit. Depending on the application, this may or may
not be acceptable.
Normal temperature limit. For maximum motor life, we recommend that the Unico
EC motor be limited to applications with less than 130°F (54°C) air
temperature. Therefore, the Unico EC motor can be used with all heat pump and
electric heating applications without problem. It may also be installed with a
hot water coil with air temperature leaving the coil less than 130°F (54°C).
This is generally with water temperature less than 135°F (57°C) but it depends
on the water and air flow. Consult the hot water coil specifications to
determine air temperatures based on water flow and air flow rate.
Maximum operating temperature limit. The absolute limit for the motor is 150°F
(65°C) air temperature, above this point the motor will automatically begin to
slow down. The motor may be used in applications with air temperature around
the motor between 130 to 150°F (54 to 65°C), typical for boiler systems with
water temperatures between 135 and 160°F (57 to 70°C). However, expect the
life of the motor to be reduced by as much as 50%. In most applications, with
unit operating intermittently, the amount of time that the motor operates in
heating is very small so the reduction in motor life will not be significant.
Only for extended continuous heating applications, will the reduction be
noticeable. The reduction in motor life can be minimized by using
setback boiler temperatures while operating with maximum airflow at the
highest water temperatures.
Table 2. Motor Operating temperature
Normal Operating Range | -10°F to 130°F (-76°C to 54°C) |
---|---|
Maximum Limit | 150°F (66°C) |
UNIT ASSEMBLY
The units may be assembled either horizontally or vertically. Refer to Fig. 1
for your particular flow arrangement. Assemble the units’ two modules at a
time. If you use a refrigerant coil, the anti-frost switch wires must be
routed to the control box as you connect
the modules.
Anti-Frost Switch Wires. Remove the coil access panel and unravel the
anti-frost switch wires. Connect the modules together, then feed the wires
through the bushing in the motor partition panel. Fastening Modules Together.
To fasten the modules
together tilt the units to insert the connection flange over the mating flange
as shown in Fig. 4. It may be necessary to squeeze the units together as you
are inserting the flange to compress the rubber gaskets. If the hook flange
has a small gap, use a large flat bladed screwdriver to pry the gap apart.
Secure the modules together with the latches, compressing the gasket further.
It is also recommended to tape the seams of the modules after
latching.
Horizontal Installations
Most systems are installed in the horizontal configuration, with the air going
from right to left when looking at the connections (as shown in figure 2). All
the modules are factory set for horizontal airflow. It is not recommended to
flip the cooling module to reverse the flow direction of the air. When
connecting the modules be sure to arrange the heating module on the inlet
(return) side of the cooling module.
The 4860 cooling module also includes a spacer module which has a small drip
shelf (shipped loose) that must be installed on the air exit side of the drain
pan (shown in figure 5).When installing the heat module or return air
plenum module upstream of the cooling module, it is necessary to first install
a hook flange to the bottom of the cooling coil (Figure 6).
Vertical Installations. As shown in figure 2, the modular system can also be
configured for vertical upflow or down-flow. The arrangement of modules is
different so be sure to follow these instructions.
In most cases connecting the modules is straight forward – just use the
arrangement shown in Figure 2a. However, if you are using a 2430, 3036 or 3642
cooling module, the top access panel of the cooling module will need to be
repositioned as shown in figure
7. For 1218 models, modules will be connected in the horizontal configuration
and the assembled unit will be rotated to the vertical position as shown in
Figure 2b.
For vertical up-flow the return air may enter through the bottom or side
return opening of the 2430, 3036 or 3642 cooling module although the bottom
opening is preferred. The 4860 cooling only has one return opening for either
horizontal or vertical pplications. The 4860 drain pan is ‘L’ shaped and will
work properly when the module is turned 90 degrees.
CAUTION TO PREVENT WATER DAMAGE AND TO ALLOW PROPER CONDENSATE DRAINAGE,
DO NOT TURN OR ROTATE THE 2430, 3036, OR 3642 COOLING MODULE ON ITS SIDE.
Vertical Plenum Module
For vertical up-flow installations, we recommend using the vertical return
plenum module (MxxxxV2). The spacer shown in figure 2 is included with the MV
module (except for the 4860 unit, where it is included with the cooling
module). If you are not using the
MxxxxV2 module for the 2430, 3036 or 3642, you will need to use the vertical
conversion kit, which includes the extra panels needed. You will also need to
provide a field fabricated mount for the unit.
The vertical plenum module includes a filter and a space for a hot water coil.
If the unit is installed in an area where water may cause damage, be sure to
set the unit inside a drain pan.
The return air opening for the vertical plenum module is in the front. If
connecting to a flexible duct, you will need the return air adapter. The
return air adapter attaches to the front of the return plenum module using
latches, which need to be moved from the top to the sides (figure
8). Assembling the AHU for vertical up-flow
Position the base, either the vertical module or a field fabricated unit,
where desired. Then set the cooling module on top of the base as shown in
Figure 9. Use gasket tape under the cooling cabinet to prevent air
leaks.Then set the spacer section on top of the coil,
securing it with the corner brackets as shown in Figure 10. The blower module
goes on top. The blower module can be turned 180 degrees to position the motor
to the other side, or top position the blower discharge towards the
front.
Heating-Only Systems For heating-only systems, the installation is similar to
the cooling-only or heatingand-cooling system, except that the cooling module
is removed from the system.
For the 2430, 3036 and 3642 systems, use a vertical spacer kit such that the
spacer overhangs the back of the vertical plenum and the filter access is not
covered over.
Control Box Assembly.
The control box is shipped with the blower module. Itcan be installed on
either the discharge side of theblower cabinet, on top, or on the bottom of
the blowercabinet, depending on what is most convenient.
To install, first remove the two knockouts on the sideor top of the cabinet,
where it will be installed. Mountthe control box using four (4) sheet metal
screws asshown in Figure 12. Connect the wiring as required inthe wiring
section and Bulletin 30-039 for the SCBcontrol box and Bulletin 30-037 for the
ST controlbox. Secondary Drain Pan Installation. Where an overflow of
condensate could cause water damage, a secondary drain pan MUST BE INSTALLED.
Place the drain pan on the mounting base, platform or angle iron support
frame. Be sure to allow enough room for the drain line and connection (refer
to Table 3). The assembled unit should be placed over the secondary drain pan
supported by rails with rubber pads for isolation to raise the unit above the
1.5-inch (38mm) sides of the secondary drain pan.
Table 2 shows the secondary drain pans to be used for horizontally mounted
modules. For vertical up-flow arrangements that use the cooling module, the
2module drain pans can be used where space permits and the return air is
entering from the side. These ans would be over-sized compared to the
footprint of the cooling module. If a smaller drain pan is necessary, it
should be fabricated to be at least 1-½-inch (12.7 mm) larger on each side of
the bottom module.
For vertical down flow (counter flow) arrangements it is difficult to provide
a secondary drain pan because of the blower discharge at the bottom. The
secondary drain pan must be fabricated with an opening for the blower
discharge and plenum adapter and still provide a sealed drain pan.
Table 3. Secondary Drain Pan Dimensions, in (mm)
Unit Size | 2 Modules | 3 Modules |
---|---|---|
Part No. UPC | Dimensions inches (mm) | Part No. |
1218 | 94 | 24t x 42 (610 x 1067) |
2430 | 20B | 29t x 31.25 |
(737 x 800) | UPC- | |
20C | 29t x 43.75 |
(737 x 1060)
| | 34t x 31.5| UPC-| 34t x 43.75
3036| 27B| (864 x 800)| 27C| 864 x 1111)
| | 42t x 31.5| UPC-| 42t x 43.75
3642| 24B| (1067 x 800)| 24C| (1067 x 1111)
| | 42t x 43.75| UPC-| 42t x 54
4860| 24C| (1067 x 1111)| 24D| (4067 x 1372)
† NOTE – The drain fitting extends 7/8 inch (22 mm) beyond this dimension.
Like the modules, all the secondary drain pans except UPC-24D will fit through
the return air opening. For these drain pans it will be necessary to fold the
pans in order to pass through the return opening. If you areunable to use the
UPC-24D because of space
limitations, use the UPC-24C under the cooling and heating modules. In this
case the blower module will extend beyond the secondary drain pan and should
be supported with blocks or an angle iron frame.
MOUNTING
The modules come factory-ready for horizontal airflow applications and may be modified for vertical airflow arrangements (see Fig. 1) with the addition of the vertical heat module (with or without the heating coil) and the vertical spacer module. Horizontal Platform Mounting. Mount the unit horizontally when vertical height is limited such as in an attic or crawl space. It is easiest to mount the unit on a platform, but care must be taken to assure proper drain line pitch.
All Dimensions in inches (mm)
Dim| Model| 1218| 2430| 3036| 3642| 4860
A| | 22 (560)| 27 (690)| 32 (810)| 40 (1000)
CO| 2 Modules| 32 (812)| 30 (760)| 42 (1070)
3 Modules| 40 (1000)| 42 (1070)| 50 (1270)
Figure 13. Typical Platform Installation
The platform height must allow for proper pitch of the condensate drain lines
— at least ¼ inch drop per lineal foot (20 mm per meter). The platform can be
built from a sheet of ½ inch (13 mm) plywood and stud frame. Table 3 lists the
maximum horizontal drain line run for various framing materials and still
provide adequate drainage.
Table 4. Horizontal Distance of Drain Piping for Different Framing
Materials
Frame Lumber | 2 x 4 | 2 x 6 | 2 x 8 | 2 x 10 |
---|---|---|---|---|
Max. Horizontal Run, ft. (m) | 18 (5) | 26 (8) | 34 (10) | 42 (13) |
The platform size must allow for the number of modules being used. For
dimensions for minimum platform size see Figure 13.
Place secondary drain pan on platform and unit on top of isolation pads inside
of secondary drain pan. Be sure that the unit is raised above the height of
the drain pan side to allow duct connections.
Horizontal Suspended Mounting. The modules can also be suspended from the
ceiling or rafters. A typical suspension method is shown in Fig. 14a. Screw
four (4) “J” hooks into rafters. Suspend four (4) chains from “J” hooks and
attach eyebolts to chains. Secure angle iron to eyebolts and place secondary
drain pan on top.
Put isolation pads in drain pan, making sure unit sits above sides of drain
pan.
CAUTION
Do not hang unit from top of unit cabinet as this could distort unit.
As an alternative, rest the unit on the angle iron supports and hang the
secondary drain pan from the same supports. As stated above, install “J”
hooks, chains, and angle iron. Secure angle iron to eyebolts and put isolation
padding on angle iron.
Adjust the length of the eyebolts and chains so there is a slight pitch
towards the drain end. Vertical Mounting (2430, 3036,
3642, 4860).
Because the units are top heavy, it is not recommended to suspend a vertical
unit. It should be mounted on either a platform or a floor. Unico makes a
module specifically for vertical installations (refer to previous section). If
only a blower and heating module are being installed, fabricate a return
plenum for the unit to sit upon.
Although the modules may be assembled without a spacer module, this can
severely restrict the airflow; especially if the blower needs to achieve its
maximum airflow. Therefore, always use the spacer module for
any vertical configuration.
Module Combination | Dimension ‘A’ inches (mm) |
---|---|
Blower + Cooling + Heating | 37 13/16 (960) |
Blower + Cooling | 32’/16 (824) |
Blower + Heating | 22 11/16 (576) |
Figure 14c. Screw Hole Pattern of Mounting
M1218 Vertical Mounting. The M1218 can only be vertically mounted in the up-
flow configuration. The vertical rail mounting method is shown in Figure 14b.
- Mark hole pattern on wall (see Figure 14c). To install the unit vertically, such as in a closet, basement, or utility room, assemble the unit then attach one of the mounting rails (UPC-98) to the top of the blower using at least three (3) #10-32 sheet metal screws a minimum of ¾ inches (19 mm) long.
- Screw the other mounting rail of the UPC-98 to the wall at the bottom location where the unit will be mounted (Figure 14b). The unit will rest on this bracket during mounting. If the wall covering is .not adequate to hold the weight of the unit, use lag screws to attach the rails to the structure. Use at least three (3) lag screws a minimum of 3 inches (77 mm) long, which will be screwed directly into a stud or structural member. If the wall covering is sufficient, toggle screws may be used to mount the unit. .
- Lift the assembled unit onto the mounted lower mounting rail and rotate the unit upward. Secure the top of the unit to the wall using a minimum of three (3) lag screws into a stud or structural member. Secure the bottom mounting rail to the unit with at least three (3) #10-32 sheet metal screws a minimum of ¾ inches (19 mm) long.
DUCT CONNECTIONS
Supply Plenum (main duct). The main duct (or plenum) can be round, square or rectangular, provided it meets the pressure drop requirements of the application. Adapters are available for the standard sizes for both round and square ducts.
| Model, UPC-61-
---|---
1218| 2430| 3036| 3642| 4860
Dimension,
inch (mm)| A| 6.50 (182)| 6 (152)| 7.16 (182)| 7.16 (182)| 10.13 (257)
B| 3.25 (83)| 6.38 (162)
D| 7 (178)| 7 (178)| 9 (229)| 9 (229)| 10 (254)
L| 12 (305)| 18 (457)
Dimensions
To attach the plenum adapter, first install the restrictor plate (for ST
only). Then install the adapter with eight (8) sheet metal screws as shown in
Fig. 17. Sheet metal screws for installing both are provided with the
blower.Restrictor Plate (ST). The single speed (non-
ECM) blower includes a restrictor plate to fine-tune the airflow. The purpose
of the restrictor plate is to eliminate objectionable outlet noise because the
blower is delivering more air than required. In some cases where the maximum
airflow is required, the restrictor may be omitted.
The restrictor plate is used to set the system airflow.
The full open position corresponds to the highest airflow the installed duct
system will allow (figure 18). Set the restrictor plate to the full open
position and measure the system airflow. The required system airflow is
200-250 CFM per nominal ton (27-34 L/s
per nominal kW). Measure the motor amperage and use this to ensure the 200-250
CFM per nominal ton (27-34 L/s per nominal kW) has been achieved. Ifelevated
sound levels are noticed at the outlets with more than 250 CFM per nominal ton
(34 L/s per nominal kW), the airflow may be reduced with the restrictor plate.
Always measure the system airflow by the motor amperage (see Table 4). Refer
to the airflow amperage charts provided with the blower.
Note: Do not use restrictor plate to adjust plenum static pressure. Adjust
the restrictor to the proper amperage. This will assure proper airflow.
Table 5. Approximate Amperages at Given Airflows (for single speed blowers
only)
Unit Size | Airflow, CFM (L/s) | Airflow, CFM (L/s) |
---|---|---|
4860 | 1250 (590) | 4.1 |
1000 (470) | 3.5 | |
800 (380) | 3.1 | |
3036 3642 | 1000 (470) | 3.9 |
900 (420) | 3.6 | |
800 (380) | 3.2 | |
700 (330) | 3 | |
600 (280) | 2.8 | |
2430 | 600 (280) | 2.2 |
500 (240) | 2 | |
400 (190) | 1.8 | |
400 (190) | 1.7 | |
1218 | 300 (140) | 1.5 |
200 (95) | 1.2 |
- multiply by 1.1 if 208V
† for more exact airflow use the chart included with the blower or see Bulletin 20-040.
Attach Main Duct. Attach the plenum to the adapter by inserting it over the supply adapter. If using sheet metal duct, use three (3) or four (4) equally spaced sheet metal screws or nails to secure the duct to the supply adapter. Then tape around the seam with UL
181A aluminum tape. Then wrap the outside of the plenum adapter with the supplied blanket insulation and secure the insulation seams with UL 181A tape.
Return Air Duct. Unico supplies a return duct system but any return duct system is acceptable provided the pressure loss does not exceed 0.15 inches of water (37 Pa), including filters. The return duct should have at least one 90° bend between the unit and filter box to reduce sound transmission directly from the unit.
The Unico Return Duct system has a single return that includes the return air box with filter, the return duct, and the return air adapter (refer to Fig. 3). Multiple returns or extra-long returns are possible so long as the maximum pressure loss is not exceeded. For vertical installations or tight spaces, it may be necessary to fabricate a return duct system from duct board or lined metal.
The typical return duct is 10-foot (3 m) in length so it may have to be cut to avoid bunching if the distance to the unit is significantly less than 100-inches. The minimum length should be 7-feet (2 m). When given a choice, the shorter distances should be avoided as this may increase sound transmission from the unit. Cut an opening for the return box as specified in Table 1. For the 2430, 3036 and 3642 if the joists or studs are on 16-inch (410mm) centers, there is no need to build a frame to hold the return air box. Otherwise, it will be necessary to construct a frame around the opening. For the 4860 return, it will almost always be necessary to cut and header at least one joist.
Center the return air box so the filter frame flange covers all the gaps and make sure the flange is flush against the wall or ceiling. Install the return air box against the frame using nails or screws.
Screw holes are provided in the return air box. Use the holes nearest the corners. The other holes are for mounting the filter grille. See Fig. 19. Install filter frame into the return air box using four nails or screws. Use the holes furthest from the corners. Insert filter and hold in place by rotating metal clips. Close grille and secure with clips.
Refer to Table 5 for correct Return Duct Adapter selection. Attach the proper return duct adapter to either the Heating or Cooling Module. Then attach the return duct to the adapter and to the return air box using the Q-bands and Q-clips.
The return air adapter ships with an insulation blanket that must be wrapped around the adapter. Tape the seams with UL 181A aluminum tape.
Table 6. Return Duct Adapter
Blower Module | Blower Module + |
---|---|
4860 | Cooling Module |
3642 | UPC-59-3642 |
3036 | UPC-59-3036 |
2430 | UPC-59-2430 |
1218 | UPC-104-1218 or UPC-105-1218 |
Multiple Returns. If more than one return is desired, Unico has designed a
return plenum (MR) module.
The MR module is available in three sizes: 2430, 3036, and 3642/4860, and it
includes a central filter. The MR module is easily fitted to the air handling
unit and multiple return openings may be cut in the top back or sides of the
box. Refer to Bulletin 20-20.6, Return Plenum Module, for additional
information.
PIPING
All piping must be in accordance with all local codes and ordinances.
Condensate Lines. The primary drain pan condensate connection is a ¾-inch
(19mm) female pipe thread fitting, and the secondary drain pan connection is a
¾inch (19mm) PVC socket fitting.
- Elevate the unit so the condensate lines are pitched at least ¼-inch per lineal foot (20 mm per meter).
- Trap the condensate line near the unit using U-trap A00924-G05 as shown in Figure 20.
- If located in a high humidity area, above 50°F (10°C) dew point, insulate the condensate line to prevent water condensation on the outside of the pipe.
- In cold climates, protect the trap from freezing in the winter.
- Do not trap the secondary drain line and do not terminate connect to the primary drain line.
The standard trap that ships with the cooling coil includes a float switch to
shut off the system if the drain is plugged up.
Run secondary drain line so that any drainage will be immediately known
without causing damage to property. A typical location is to terminate the
secondary drain line above a windowsill so that the drainage splashes on the
window. This will serve as an
indicator that there is a problem with the primary drain.
In cases where a secondary drain line cannot be run, add a float switch or a
micro switch with a paper fuse.
Refrigerant Connections. All refrigerant coils have two refrigerant lines: a
liquid line (small tube) and a vapor line (large tube). The connections are
either sweat or flare as listed in table 6, depending on what type of outdoor
unit the cooling module is matched to.
Outdoor unit | Liquid line | Vapor line |
---|---|---|
Standard 1 or 2-stage | 3/8 (9.5 mm) ODF sweat | 7/8 (22 mm) ODF sweat |
“iSeries” Var.-stage | 1/4 Flare (2430) 3/8 Flare (3036) | 1/2 Flare (2430) 5/8 |
Flare (3036)
Refer to the condensing unit manufacturer’s instruction for proper line sizing
information based on distance from condenser.
For 1 and 2-stage outdoor units (non-iSERIES), install a liquid line filter
drier as close to the coil module as possible to protect the evaporator from
foreign object debris. For attic installations or when using long line sets,
an optional moisture indicating sight glass should also be installed between
the filter-drier and expansion valve, near the indoor unit.
1218
The expansion valve is shipped loose inside the unit inthe blower section.
Install the valve inside the unit asshown in Fig. 15. Use the following steps
wheninstalling:
- Remove plastic caps to external equalizer line anddistributor inlet.
- Connect valve to distributor and tighten flare nut.
- Connect external equalizer line and tighten flarenut. 4. Connect to the outlet the 3/8” (9.5 mm) OD copperrefrigerant fitting. Make sure the flare nut is tight.5. After all lines have been connected, pressure checkthe connections by charging the system with 150psig of dry nitrogen and check for leaks at allconnections.
Locate the bulb at the 12 O’clock position on ahorizontal straight section of
the 5/8” (16 mm) suctionline (see Fig 15). Attach the bulb to the tubing with
thetwo straps that are provided. For satisfactory expansionvalve control, good
thermal contact between the bulband the suction line is essential.
2430/3036/3642/4860
STEP 1. RELEASE THE NITROGEN HOLDING CHARGE.
All refrigerant coils are shipped from our factory pressurized with nitrogen.
They do not contain any refrigerant.
WARNING
To prevent injury to eyes, face away from the Schrader valve when releasing
nitrogen gas.
The refrigerant coils are equipped with a Schrader valve port to relieve the
pressure and for factory testing purposes. It can also be used to check for
leaks prior to installation. Unscrew the Schrader cap and press the depressor.
Note: If there is no nitrogen pressure present, the coil ay have
developed a leak during shipment and should be returned to the point of
purchase for exchange.
STEP 2. REMOVE THE CAPS.
When all the pressure is removed the suction line connections end off if the
coil has brazed caps (Figure 21) or use two wrenches to remove the flare caps
if flare caps are present.
ressure is present, then go ahead and finish releasing the pressure in the
coil by continuing to press on the depressor. CAUTION When brazing, purge with nitrogen gas to prevent
the formation of oxides.
Use two wrenches to remove the nut from distributor (figure 22) to install the
TXV or, if an iSeries, to connect the liquid line. This can be done prior to
connecting the modules together as shown. If modules are connected already,
then remove the two side access panels to reach the nut.
STEP 3. INSTALL THE TXV (SKIP IF ISERIES). Expansion Valve Installation (not
for iSeries). All refrigerant coils, except for the iSeries cooling coil,
require a thermostatic expansion valve (TXV). For coils requiring a TXV, an
R-410A valve is shipped loose with the cooling module and must be installed
prior to charging. The iSeries expansion valve is in the outdoor unit already
installed so the liquid line should be installed directly to the distributor
prior to charging.
CAUTION iSeries ONLY: To prevent equipment damage, DO NOT install an
expansion valve inside the indoor unit. It is located in the outdoor unit.
NOTICE Before installing the TXV, cut the two nylon zip ties holding the
liquid line in place. The TXV will not fit properly if the liquid line is
secured with these ties. (See Figure 23)
Coil Model| Nominal Condenser Size| Valve Part Number| Nom. Valve Size|
---|---|---|---|---
R-22| R-410a|
1218-E
|
1.5-ton (5.2 kW)
|
–
|
A00366-002
|
|
2430-B 2430-E| 1.5 to 2.5-ton (5.2 to 9 kW)|
A00808-002
|
A00808-013
|
2
|
3036-B 3036-E 3642-B| 2.5 to 3-ton (9 to 10 kW)|
A00808-004
|
A00808-014
|
3
3
|
3642-E| 3 to 4 ton (10 to 14 kW)| A00808-004|
A00808-014
A00808-015|
4860-B 4860-E| 4 to 5 ton (14 to 17 kW)| A00808-005|
4
|
-
Refer to AHRI directory to heat pump coil compatibility.|
- Cut the zip ties holding the liquid line in place before installing the TXV. Install the white Teflon o-ring in both connections of the TXV (Figure 24). Attach and tighten lower connecting nut to the distributor as shown in Figure 24. On iSERIES, connect liquid line directly to the distributor (Figure 27).
- Connect the outlet to the 3/8″ (9.5 mm) OD copper refrigerant fitting. Make sure the threaded fitting is tight (Figure 25).
- Route both the external equalizer pressure tube and the thermostatic bulb tube (Figure 26). Then tighten the external equalizer line to the flare connection (Figure 27).
- Locate the bulb on a horizontal straight section of the suction line (Figure 28). Attach the bulb to the tubing with clamp provided and wrap with two pieces of cork tape (Figure 29). For satisfactory expansion valve control, good thermal contact between the bulb and the suction line is essential.
- After all lines have been connected, pressure check the connections by charging the system with 150 psig of dry nitrogen and check for leaks at all connections.
STEP 4 CONNECT SMALL TUBE (ISERIES ONLY)
For the iSeries coil, connect the small tube directory to the distributor, where the TXV would normally be located (Figure 30).
STEP 5. CONNECT THE LINE SET.
Braze the line sets to the copper stubs or connect to the flare. If brazing,
use a nitrogen purge and protect the expansion valve by wrapping it with a wet
cloth. For threaded flare fittings, use 1 or 2 drops of refrigerant oil on the
flare (not on the threads) and tighten per the torque specified in the iSeries
manual.
Water Coil Connections. If you are installing the hot water coil, remove the
side coil access panel and cut away the insulation. Slide the coil into the
cabinet and secure with brackets supplied with the hot water coil. Install the
access panel after the coil is in place.
All water connections are 7/8-inch (22mm) sweat OD connections. Sweat the
water connections, then fill the system. Bleed the air from the coil by
backing off the screw inside the bleed valve for venting (Fig. 31).
If unit is in an unconditioned space below freezing, care must be taken not to
freeze the water in the coil. The best method is to use a glycol-water
antifreeze solution with a freezing point below the coldest temperature
expected.
After venting the chilled water coil, replace the access panel and seal around
the connections with the rubber gasket provided.
Figure 32. Water Coil Connections Coil Cleaning.
The coil should be sprayed with liquid detergent, or any commercially
available evaporator cleaner solution, thoroughly and rinsed thoroughly before
installation to assure proper drainage of condensate from the coil. This will
eliminate moisture carry-over
and assure maximum coil performance. As an alternate to cleaning, allow
approximately 50 hours of break-in time to achieve the same results.
WIRING
All electrical wiring must comply with local codes and ordinances. Blower
module controls and components are bonded for grounding to meet safety
standards UL Standard 1995 and CAN/CSA-C22.2 No. 236 and are listed by ETL.
All 50 Hz units are CE marked and conform to the Low Voltage 73/23/EEC and EMC
89/336/EEC Directives.
The control wiring, sequence of operation, and troubleshooting are included in
a separate bulletin for each control box.
Table 9. Control Box Manuals
CHECKING AIR FLOW
CAUTION Do not operate blower with free discharge or low static pressures
(below 1-motor from overloading.
inch w.c. (250 Pa)) to prevent
After the system is installed and before charging system, check for proper
airflow. Record the position of the restrictor plate, the plenum static
pressure, and the motor amperage (standard units only). With this information,
the amount of airflow can be etermined. As a recommended further check on
airflow, use a velometer to measure the airflow from each outlet. The most
convenient instrument to use is a hand heldvane type velocity meter that fits
directly over the outlet. The Turbo-Meter (Davis nstruments Catalog No.
DS105I07) or equivalent meter will give a direct LED readout on the Knots
(FPM x 100) setting, when multiplied by 2 gives the CFM of the outlet within
an accuracy of 10%. (Multiply ‘knots’ by 0.94 to obtain L/s.) Refer to
Technote 113 for more information.
By measuring and totaling the airflow of all outlets, the total airflow of the
system can be closely approximated and provide a crosscheck for the airflow
determined from the motor amperage using the airflow-amperage table that is
shipped with the Blower module. Use Table 9 to correct the airflow.
Note: These tables are for the specific motor installed in each blower module.
Be sure the table used applies to the correct model number that is shown on
the table.
Check Static Pressure Airflow should be verified using the amps listed on the
yellow label on the ST2 blower and from the control board for the EC blower.
If the air flow is low, it is because of a restriction. Check static pressure
to find the restriction and correct.
Measure the external static pressure (see the following section) in the supply
plenum at least two feet (610 mm) from the unit and verify that it is within
the allowable range. It is not necessary to measure the return duct static
pressure unless it was field fabricated. The maximum return static pressure
(including filters) should be 0.15 inches of water (37 Pa). If it is greater
than 0.15 inches of water column, subtract the extra return system pressure
drop from the supply plenum static pressure to get the total static pressure
drop. For example: If the supply static pressure is measured to be 1.6 inches
w.c. and the return system pressure drop is 0.25 inches w.c, the total static
pressure drop as shown on the blower curve is: 1.6 – 0.10 = 1.50. In this case
the static pressure is too high. If the restrictor plate (standard units only)
is not positioned according to Table 4, the static pressurereading is not an
effective indicator of airflow although it should still be recorded. In this
case, measuring motor amperage is the only reliable indicator. Check Outlet
Airflow. Measure and record the air flow from each outlet with a TurboMeter
(refer to Tech Note 113, How to Measure Outlet Airflow, for more information).
Place the TurboMeter against each outlet, centered as best possible and record
the “knots”.
Multiply the knots by 2 to obtain CFM, then sum all the outlets. The sum is
the total airflow; this can be compared to the outlet indicated by the
amperage. A significant difference could indicate duct leakage.
Table 10. Airflow Troubleshooting Chart
Problem | Probable Cause | Remedy |
---|---|---|
Low Static, Low Amperage | Restrictor set to low. |
Blocked filters, restriction in return duct.
Low voltage.
Blower Wheel not aligned properly.
Dirty blower wheel.| Open restrictor to table 4 setting.
Clear restriction.
Check with local utility.
Center wheel inside of inlet ring. Position on shaft for 1/8 inch (3 mm)
clearance from inlet ring.
Clean wheel.
Low Static, High Amperage| Large number of outlets.
Restrictor setting too high.| Close restrictor to proper amperage, or
Add balancing orifices to outlets.
Close restrictor to obtain proper amperage.
High Static, Low Amperage| Restrictive duct system.| Add outlets, add splinter
vane in tee, reduce the number of tees and elbows in plenum, increase plenum
size to 9″ equivalent, or Open restrictor to proper amperage.
How to Measure Static Pressure. Measure the supplyplenum static pressure at
least 18-inches (457mm)from the unit, but before any tee or elbow. A
distanceof between 2 and 3-feet (0.6 to 0.9m) is best. Use aninclined
manometer capable of reading at least 2.5inches of water column (622 Pa), such
as DwyerInstrument’s model 109 manometer. Be sure to zero thescale and level
the manometer.
A magnehelic gauge that measures up to at least 2.5inches of water may also be
used.
Use a metal tube, typically ¼-inch (6mm) diameter, tomeasure the static
pressure. Determine where you wantit and cut or punch a small hole in the
duct. Make thehole the same size as the metal tube to prevent leakage.Insert
the metal tube 1-inch (25mm) so that the tip ofthe tube is flush to inside
wall of the duct andperpendicular to the air stream as shown in Fig. 32.
Attach the metal tube to the manometer using a rubberhose (usually supplied
with the manometer). Recordthe pressure.
Note: If the tube is not perpendicular to the air stream,the reading will be
in error. You will get a higherreading if the tube is angled toward the air
stream.but less accurate manometer in
one of two ways. One way is to use a short piece of ruler or yardstick and
clear plastic tubing as shown in Fig. 33.
CHARGING THE SYSTEM
DO NOT VENT REFRIGERANT TO THE ATMOSPHERE!! It is a violation of federal law
and in some cases local ordinances also. Always use a refrigerant recovery or
recycling device. If charging a heat pump, refer to Bulletin 30-024,
Instructions for “M” Series Modular Heat Pump Systems. The following procedure
is only valid for charging the system during the cooling mode. To check for
proper charge record the refrigerant pressures and temperatures. Check the
refrigerant charge by measuring the amount of sub-cooling (or ‘approach’
temperature for some condensing units). Ifthe outdoor manufacturer does not
have sub-cooling or “approach” temperature charts, then be sure that the sub-
cooling is at least between 3 and 8 °F (2 to 5°C). For long refrigerant lines
or when the evaporator is above the condenser, the sub-cooling should be close
to 8°F; otherwise, aim for the low end of the range.
After the refrigerant lines and evaporator have been carefully leak tested and
evacuated, release the R410A operating charge in the condensing unit. The
system isnow ready for refrigerant charge adjustment. If the coil is equipped
with a threaded TXV, always verify that the threads are tight and do not leak.
Start up the system and check line voltage to assure it is within acceptable
limits for the system as dictated by the condensing unit manufacturer. Run the
system for 20 to 30 minutes to get reasonably stabilized onditions. Do not
attempt to adjust charge withoutdoor temperature below 75°F (24°C). An outdoor
temperature of 75 to 85°F (24 to 29°C) is preferred.
If the system charge must be checked when the outdoor temperature is below
80°F (26.7°C), block the condenser coil until the head pressure is
approximately equal to what its charging chart specifies for an 85°F (29°C)
day.
For heat pumps always check the charge in cooling mode. If this is not
possible because of low outdoor temperatures, charge the system in the heating
mode, but return later when the weather is warmer before thesystem is
switched to cooling.
Sub-cooling Method. Many condensing unit manufacturers publish the amount of
sub-cooling that the condenser will produce. Follow their instructions
tocharge the unit. Typical sub-cooling values will be between 3 an 8°F (2 to
5°C). he unit should ALWAYS have some amount of sub-cooling. To be sure
there is enough sub-cooling, especially if the unit is in a hot attic, check
the liquid line sight glass near the evaporator for bubbles or measure the
refrigerant liquid line pressure and temperature AT THE EVAPORATOR. To measure
sub-cooling use the following procedure:
- Measure and record the liquid line pressure using anaccurate refrigerant gauge. Record the corresponding saturation temperature for this pressure (see Table 10).
- Measure and record the liquid line temperature using an accurate metal or glass thermometer, or thermocouple. Tape or strap the sensor firmly against the surface of the liquid line and cover with insulation.
- Determine the sub-cooling with the following equation:
Saturated Temperature
— Liquid Line Temperature
= Subcooling
If the sub-cooling temperature at the condenser is low, the system is
undercharged and refrigerant must be added.
If it is high, the system is overcharged and some refrigerant must be removed
and collected in an empty refrigerant container. DO NOT RELEASE REFRIGERANT
INTO THE ATMOSPHERE. In some cases, such as in a hot attic, the liquid line
willpick up heat and lose its sub-cooling. This will be apparent if the sub-
cooling at the evaporator is low. In these cases, the liquid line should be
insulated or strapped to the suction line and both insulated. The same problem
can occur for long refrigerant lines; in this case, increase the size of the
liquid line to reduce the pressure drop.
Superheat Method Do not charge the system based on superheat. Superheat
measurements should only be used to verify that the expansion valve is working
properly. If it is more than expected please refer to the Technote on
roubleshooting expansion valves.The superheat should be between 8 to 12°F (4
to 7°C) at the indoor coil. In some cases, particularly for the larger
capacity match-ups (i.e. 3 ton and 5 ton), a superheat of 15 to 18°F (8 to
10°C) is atisfactory. It is not uncommon to measure a superheat above 20 to
25°F (11 to 14°C) at the condensing unit. Be aware that the superheat value is
also dependent on the outdoor air temperature. At lower air temperatures the
superheat will be higher than at higher air temperatures. If the condenser
ambient temperature is between 75 and 85°F (24 to 29°C), superheat should be
approximately 10 to 12°F (5 to 7°C). If the outdoor
temperature is between 85 and 105°F (29 to 40°C), superheat should be
approximately 8 to 10°F (4 to 5°C).
To measure the superheat, use the following:
- Measure and record the suction pressure at the evaporator outlet using an accurate refrigerant gauge. If this is not possible, measure the pressure at the service port on the suction valve fitting at the condensing unit and add the estimated pressure loss in the suction line between the condensing unit and evaporator. Record the corresponding saturation temperature for this pressure (see Table 10).
- Measure the suction line temperature at the evaporator outlet using an accurate metal or glass thermometer, or thermocouple. Insert the thermometer under the insulation on the suction line and tape firmly against the surface of the suction tube.
- Determine the superheat with the following equation:
Suction Line Temperature
— Saturated Temperature
= Superheat
Charging by Gauge Pressures It is not possible to charge the system by gauge
pressures. Gauge pressure should only be used to verify the system is working
properly.
The Unico System will show a lower suction pressure during the cooling mode
than a conventional system.
Generally, it will be 10 to 15 psi (70 to 100 kPa) less.
For example, a normal suction pressure for the Unico System will be about 114
psig (786 kPa) with an 85 to 95°F (29 to 35°C) outdoor temperature. Expect
lower pressures when the outdoor temperatures are lower.
The head pressures should be similar to a conventional system when in the
cooling mode.
°F | psig | °C | kPa (gauge) | |
---|---|---|---|---|
0 | 48.4 | -18 | 334 | |
2 | 51.1 | -17 | 352 | |
4 | 53.8 | -16 | 371 | |
6 | 56.6 | -14 | 390 | |
8 | 59.4 | -13 | 410 | |
10 | 62.4 | -12 | 430 | |
12 | 65.4 | -11 | 451 | |
14 | 68.6 | -10 | 473 | |
16 | 71.8 | -9 | 495 | |
18 | 75.1 | -8 | 518 | |
20 | 78.5 | -7 | 541 | |
22 | 82.1 | -6 | 566 | |
24 | 85.7 | -4 | 591 | |
26 | 89.4 | -3 | 616 | |
28 | 93.2 | -2 | 643 | |
30 | 97.2 | -1 | 670 | |
32 | 101 | 0 | 696 | |
34 | 105 | 1 | 724 | |
36 | 110 | 2 | 758 | |
38 | 114 | 3 | 786 | |
40 | 119 | 4 | 820 | |
42 | 123 | 6 | 848 | |
44 | 128 | 7 | 883 | |
46 | 133 | 8 | 917 | |
48 | 138 | 9 | 951 | |
50 | 143 | 10 | 986 | |
55 | 156 | 13 | 1076 | |
60 | 170 | 16 | 1172 |
.
.
.
| .
.
.
| .
.
.
| .
.
.
90| 274| 32| 1889
95| 295| 35| 2034
100| 317| 38| 2186
105| 341| 41| 2351
110| 365| 43| 2517
115| 391| 46| 2696
120| 418| 49| 2882
125| 447| 52| 3082
130| 477| 54| 3289
Using a Low Ambient Control Kit. Since the Unico System operates at colder
coil temperatures (in cooling mode), an anti-frost switch is installed on the
coil to prevent coil freeze-up. In certain instances, such as when the outdoor
ambient temperature is low, the condensing unit will cycle on the anti-frost
switch.
This may reduce the cooling capacity at a time when the cooling load is still
fairly high. To provide better control and comfort, install a low ambient
control on the condensing unit. Typically, a low ambient control is necessary
when perating the unit at outdoor temperatures below 80°F (26.6 °C),
especially for a 5ton nominal capacity system.
These controls come in different configurations such as the Hoffman Controls
Corp. series 800AA-head pressure control. This control modulates the outdoor
fan to maintain a minimum liquid line temperature. Other controls may cycle
the fan on/off. In either case check with the condensing unit manufacturer to
determine what controls are compatible with the condensing unit.
MAINTENANCE (1218, 2430, 3036, 3642, 4860)
When service is required to the motor or the wheel, the entire assembly may be
removed as a unit (see Figure 34). The blower assembly unit is accessible from
the piping side of the unit. It is not necessary to disconnect any module or
ducting.
To remove the motor and blower wheel assembly, loosen the six (6) screws
fastening the motorized blower assembly to the blower housing. Twist the
motorized blower assembly counter-clockwise (CCW) and pull the assembly away
from the blower housing.
CAUTION TO PREVENT DAMAGE TO THE WHEEL BALANCE, DO NOT GRAB THE ASSEMBLY
BY THE WHEEL OR SET THE ASSEMBLY DOWN SUCH THAT THE WHEEL IS SUPPORTING THE
ASSEMBLY. ALWAYS SET THE ASSEMBLY DOWN WITH THE WHEEL ON TOP
Once the assembly is removed, the proper service may be performed. If the
wheel is to be changed, it may simply be removed from the motor shaft by
loosening the motor set screw and pulling the blower wheel off the motor
shaft. If the motor is to be changed, first the blower wheel must be removed
as mentioned above, and then the screws fastening the motor to the inlet ring
must be removed.
To re-install the motorized blower assembly back into the blower housing,
follow the steps mentioned above in reverse order. It is not necessary to
access both sides of the unit to remove motor.Maintenance (1218). To remove the M1218 blower assembly, loosen and
remove the five (5) screws securing the top blower module plate. Remove the
three (3) nuts, lock washers, and flat washers securing the blower assembly to
the blower wheel housing. Carefully lift the motor, wheel, inlet ring, and
motor mounting ring off the threaded pins attached to the blower wheel
housing.
If the wheel is to be changed, it may simply be removed from the motor shaft
by loosening the motor set screw and pulling the blower wheel off the motor
shaft. If the motor is to be changed, first the blower wheel must be removed
as mentioned above, and then loosen the screw in the motor belly band holding
the motor in place.
To re-install the motorized blower assembly back into the blower housing,
follow the steps mentioned above in reverse order. It is not necessary to
remove the door panels to remove the motor.The M1218 Hot Water Coil Module
and Cooling Coil Module are designed such that the coils can be removed for
cleaning or replacement. To remove a coil, first disconnect the line sets from
the coil. Next, simply remove the connection-side door panels and slide the
coil out of the cabinet. Care should be taken to ensure the coil does not fall
out of the drain pan if removing the coil from a vertically installed unit.
When sliding the coil back into the coil module, be sure the coil is sliding
properly along the top and bottom coil supports. Do not force in a coil if it
is stuck. Forcing the coil into the cabinet could cause damage to the coil or
cabinet.
UNICO SYSTEM
M-Series Vertical Installation
*A00863-G01 , A01774-G01, A00850-G01 are shipped with the M2430V2, M3036V2, & M3642V2, respectively.
The M4860V2 is not shipped with a spacer module. The M4860C is shipped with
the A00850-G01.
Certified to UL Standard 1995
Conforms to CAN/CSA Standard C22.2 NO. 236 Copyright © 2021 Unico Inc.
Documents / Resources
|
Unico M4860CL1-X Hydronic Unico Module
Heating
[pdf] Instruction Manual
M4860CL1-X Hydronic Unico Module Heating, M4860CL1-X, Hydronic Unico Module
Heating, Unico Module Heating, Module Heating, Heating
---|---
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>