hansgrohe 13112000 Ecostat Comfort HQ Ecostat Shower Mixers Instruction Manual
- June 12, 2024
- hansgrohe
Table of Contents
- Safety Notes
- Installation Instructions
- Technical Data
- Symbol description
- Cleaning recommendation/Warranty/Contact
- Safety and Important Information
- Installation Requirements
- Commissioning and in-service tests
- Frequency of in-service tests TMV Type 3*
- Thermostatic Adjustment
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
13112000 Ecostat Comfort HQ Ecostat Shower Mixers
Instruction Manual
Safety Notes
Gloves should be worn during installation to prevent crushing and cutting
injuries.
The product may only be used for bathing, hygienic and body cleaning purposes.
Children as well as adults with physical, mental and/or sensorics impairments
must not use this product without proper supervision. Persons under the
influence of alcohol or drugs are prohibited from using this product.
The product may not be used as a holding handle. A separate handle must be
installed. &The hot and cold supplies must be of equal pressures.
Installation Instructions
- Prior to installation, inspect the product for transport damages. After it has been installed, no transport or surface damage will be honoured.
- The pipes and the fixture must be installed, flushed and tested as per the applicable standards.
- The plumbing codes applicable in the respective countries must be observed.
- The product is not designed to be used with steam baths!
- If the continuous water heater causes any problems, or you have different water pressures you must install a water limiter to the cold supply, (ordered separately, article number 97510000).
Technical Data
Operating pressure: | max. 1 MPa |
---|---|
Recommended operating pressure: | 0,1 -0,5 MPa |
Test pressure: | 1,6 Mpa (1 MPa = 10 bar – 147 PSI) |
Hot water temperature: | max. 60°C |
Centre distance: | 150±12 mm |
Connections G 1/2: | cold right- hot left |
Thermal disinfection: | 70°C / 4 min |
- Safety against backflow
- The product is exclusively designed for drinking water!
Symbol description
| Do not use silicone containing acetic acid!
---|---
| Safety Function (see page
34)
The desired maximum temperature for example max. 42° C can be pre-set thanks
to the safety function.
| Adjustment (see page 33)
After the installation, the output temperature of the thermostat must be
checked. A correction is necessary if the temperature measured at the output
differs from the temperature set on the thermostat.
| Maintenance (see page 35)
• The check valves must be checked regularly according to EN 806-5 in accord.
ance with national or regional regulations (at least once a year).
• To guarantee the smooth running of the thermostat, it is necessary from time
to time to turn the thermostat from total hot to total cold.
| Dimensions (see page 36)
| Flow diagram (see page 36)
① Shower outlet
② Tub outlet
| Spare parts (see page 37)
XXX = Colors
000 = Chrome Plated
140 = Chrome Plated/Gold Plated
340 – Brushed Black Chrome
670 – Man Black
700 – Man White
800 – Stainless Steel Optic
990 – Polished Gold-Optic
| Cleaning (see page 34)
| Operation (see page 35)
| Test certificate (see page 33)
| Special information for UK (see page 38)
Fault | Cause | Remedy |
---|---|---|
Insufficient water | – Supply pressure inadequate | – Check water pressure (If a |
pump has been installed check to see if the pump is working).
– Regulator filter dirty| – Clean filter in front of the mixer and on the MTC-
thermo cartridge
– Shower filter seal dirty| – Clean filter seal between shower and hose
Crossflow, hot water being forced into cold water pipe, or vice versa, when
mixer is closed| – Backflow preventers dirty or leaking| – Clean backflow
preventers, exchange if necessary
Spout temperature does not correspond with temperature set| – Thermostat has
not been adjusted| – Adjust thermostat
– Hot water temperature too low| – Increase hot water temperature to 42 ºC to
60 ºC
Temperature regulation not possible| – thermo cartridge calcified| – Exchange
thermo cartridge
Instantaneous heater didn’t work with thermostat| – Filters are dirty| – Clean
the filter / exchange filter
– check valve hasn’t moved back| – Exchange check valves
– Flow limiter in hand shower isn’t removed| – Remove flow limiter
Shower or spout dripping| – Dirt or sedimentation on valve seat, shut-off unit
damaged| – Clean or exchange shut-off unit
Assembly (see page 33)
|
---|---
http://www.hansgrohe.com/cleaning-recommendation
Cleaning recommendation/Warranty/Contact
|
---|---
On the following pages 38 – 39 you can find important information only for the installation in UK
Safety and Important Information
- Hansgrohe products are safe provided they are installed, used and maintained in accordance with these instructions and recommendations.
- Please read these instructions thoroughly and retain for future use.
- The plumbing installation of this thermostat mixing valve must comply with the requirements of UK.
- Water Regulations/Bylaws (Scotland), Building Regulations or any other regulations specified by the local Water Authority and supplier.
- The installation of thermostatic mixing valves must comply with the requirements of the Water Supply (Water Fittings) Regulations 1999.
- We strongly recommend that you use a plumber registered with or a member of an Association:
- Chartered Institute of Plumbing and Heating Engineering (CIPHE)
- Water Industry Approved Plumber Scheme (WIAPS)
- Dispose of plastic bags carefully.
- Keep children well away from the work area.
- Check for hidden pipes and cables in the wall before drilling holes.
- The unit must be mounted on a finished waterproofed wall surface (usually tiles).
- If you are using power tools (e.g. to drill holes) wear safety glasses and always disconnect tools from the power supply after use.
- Do not operate the shower unit if the hand shower or spray hose has been damaged or is blocked. Do not block the flow of water from the hand shower, by placing it on your hand or any other part of your body or foreign object.
- The thermostatic unit should be serviced annually by a qualified person to ensure maximum safety during use.
- The thermostatic mixing valve will be installed in such a position that maintenance of the TMV and its valves and the commissioning and testing of the TMV can be undertaken.
- The mixer is fitted with check valves (page 37 pos. 96737000 and 93136000). There are filters on the thermostatic element too (page 37 pos. 96922000 and 98282000).
- The fitting of isolation valves is required (preferred location page 39 Installation Requirements).
Technical Hotline (for UK only)
Tel: 01372465655
Email: Technical@hansgrohe.co.uk
(This service hotline is only for the United Kingdom, not Great Britain e.g.
e.g. for Germany)
Technical Data
This thermostatic valve will suit supplies of:
This thermostatic valve will suit supplies of:
HIGH PRESSURE (HP-S / HP-T)
Type 3 High Pressure shower HP-S only
Type 2 High Pressure shower or tub as appropriate HP-S and or HP-T
Operating pressure: | max. 10 bar |
---|---|
Recommended operating pressure: | 1 – 5 bar |
Test pressure: | 16 bar |
Hot water temperature: | max. 60°C |
Recommended hot water temp.: | 55 – 60°C |
Rate of flow from bath spout: | 20 l/min. @ 3 bar |
Rate of flow from shower outlet: | 18 l/min. @ 3 bar |
Maximum outlet temperature: | 43°C +/-* |
Safety check: | 40°C |
Hot water connection: | Left hand |
Cold water connection: | Right hand |
Mixed water temperature
Application| Mixed water temperature (at point of discharge).
Shower| 41°C max.
Washbasin| 41°C max.
Bath(44°Cfill)| 44°C max.
Minimum difference between hot water and mixed water temperature:| 6 K
Hot and cold supply pressure should be balanced
- For preset outlet temperature adjustment – See page 33.
NB. If a water supply is fed by gravity then the supply pressure should be verified to ensure the conditions of use are appropriate for the valve.
Recommended outlet temperatures
The TMV scheme recommends the following set maximum mixed water outlet temperatures for use in all premises:
44°C for bath fill but see notes below;
41°C for showers;
41°C for washbasins.
The maximum mixed water temperature can be 2°C above the recommended maximum set outlet temperatures.
Note: 46°C is the maximum mixed water temperature from the bath tap. The maximum temperature takes account of the allowable temperature tolerances inherent in thermostatic mixing valves and temperature losses in metal baths.
It is not a safe bathing temperature for adults or children.
The British Burns Association recommends 37 to 37.5°C as a comfortable bathing temperature for children. In premises covered by the Care Standards Act 2000, the maximum mixed water outlet temperature is 43°C.
Installation Requirements
This thermostatic mixer valve must be installed in compliance with current
Water Regulations. If you have any doubts about the Water Regulation
requirements contact your local water services provider or use the services of
a professional plumber.
This mixer valve is suitable for use with the following water supply systems:
Gas Combination Boiler (multi-point) 1.0 – 10 bar*
Unvented System (pressure balanced) 1.0 – 10 bar
Pumped System 1.0 – 10 bar
IMPORTANT: If you install this mixer with a gravity fed system, there
must be a minimum head (vertical distance) from the underside of tile cold
water storage tank to the showerhead position of at least 5 metres.
Before connecting the mixer, water should be flushed through the system to
remove all debris that might otherwise damage the valve.
- If pressure is in excess of 3.5 bar, a pressure-reducing valve should be fitted.
Supply Conditions TMV Type 2
Operating pressure range | High pressure |
---|---|
Maximum static pressure – bar | 10 |
Flow pressure, hot and cold – bar | 0.5 to 5 |
Hot supply temperature – °C | 55 to 65 |
Cold supply temperature – °C | 5 to 25 |
Supply Conditions TMV Type 3
Operating pressure range | High pressure |
---|---|
Maximum static pressure – bar | 10 |
Flow pressure, hot and cold – bar | 1 to 5 |
Hot supply temperature – °C | 55 to 65 |
Cold supply temperature – °C | 5 to 20 |
Valves operating outside these conditions cannot be guaranteed to operate as Type 2 or Type 3 valves.
Commissioning and in-service tests
Commissioning
Purpose
Since the installed supply conditions are likely to be different from those
applied in the laboratory tests it is appropriate, at commissioning, to carry
out some simple checks and tests on each mixing valve to provide a performance
reference point for future in-service tests.
Procedure
-
Check that:
a) the designation of the thermostatic mixing valve matches the intended application
b) the supply pressures are within the range of operating pressures for the designation of the valve
c) the supply temperatures are within the range permitted for the valve and by guidance information on the prevention of legionella etc. -
Adjust the temperature of the mixed water in accordance with the manufacturer’s instructions (page 33) and the requirement of the application and then carry out the following sequence:
a) record the temperature of the hot and cold water supplies
b) record the temperature of the mixed water at the largest draw-off flow rate
KEY| Isolating valve
---|---
| Reducing valve
| Mixer Valve
| Pump
c) record the
temperature of the mixed water at a smaller draw-off flow rate, which shall be
measured
d) isolate the cold water supply to the mixing valve and monitor the mixed
water temperature
e) record the maximum temperature achieved as a result of (d) and the final
stabilized temperature
NOTE: The final stabilized mixed water temperature should not exceed the
values in Table A.
f) record the equipment, thermometer etc. used for the measurements
Table A: Guide to maximum stabilized temperatures recorded during site tests
Application | Max. mixed water temperature |
---|---|
Shower | 43°C |
Washbasin | 43°C |
Bath (44°C fill) | 46°C |
The mixed water temperature at terminal fitting should never exceed 46ºC.
If there is a residual flow during the commissioning or the annual
verification (cold water supply isolation test), then this is acceptable
providing the temperature of the water seeping from the valve is no more than
2°C above the designated maximum mixed water outlet temperature setting of the
valve.
Temperature readings should be taken at the normal flow rate after allowing
for the system to stabilise.
The sensing part of the thermometer probe must be fully submerged in the water
that is to be tested.
Any TMV that has been adjusted or serviced must be re-commissioned and re-
tested in accordance with the manufacturers’ instructions.
In-service tests
Purpose
The purpose of in-service tests is to regularly monitor and record the
performance of the thermostatic mixing valve. Deterioration in performance can
indicate the need for service work on the valve and/ or the water supplies.
Procedure
-
Carry out the procedure 1. (a) to (c) and 2. (a) to (e) on page 38 using the same measuring equipment, or equipment to the same specifications.
-
If the mixed water temperature has changed significantly from the previous test results (e.g. > I K), record the change and before re-adjusting the mixed water temperature check:
a) that any in-line or integral strainers are clean
b) any in-fine or integral check valves or other anti-back siphonage devices are in good working order c) any isolating valves are fully open -
With an acceptable mixed water temperature, complete the procedure 2. (a) to (e) on page 38.
-
If at step 2. (e) on page 38 the final mixed water temperature is greater than the values in Table A and/or the maximum temperature exceeds the corresponding value from the previous test results by more than about 2 K, the need for service work is indicated.
NOTE: In-service tests should be carried out with a frequency which iden6 fees a need for service work before an unsafe water temperature can result. In the absence of any other instruction or guidance, the procedure described in „Frequency of in-service tests” may be used.
Frequency of in-service tests TMV Type 3*
General
In the absence of any other instruction or guidance on the means of
determining the appropriate frequency of in-service testing, the following
procedure may be used:
-
6 to 8 weeks after commissioning carry out the tests given in 2. on page 38.
-
12 to 15 weeks after commissioning carry out the tests given in 2. on page 38.
-
Depending on the results of 1. and 4. several possibilities exist:
a) If no significant changes (e.g. < 1 K) in mixed water temperatures are recorded between commissioning and 1., or between commissioning and 4. the next in-service test can be deferred to 24 to 28 weeks after commissioning.
b) If small changes (e.g. 1 to 2 K) in mixed water temperatures are recorded in only one of these periods, necessitating adjustment of the mixed water temperature, then the next in-service test can be deferred to 24 to 28 weeks after commissioning.
c) If small changes (e.g. I to 2 K) in mixed water temperatures are recorded in both of these periods, necessitating adjustment of the mixed water temperature, then the next in-service test should be carried out at 18 to 21 weeks after commissioning.
d) If significant changes (e.g. > 2 K) in mixed water temperatures are re corded in either of these periods, necessitating service work, then the next in-service test should be carried out at 18 to 21 weeks after commissioning. -
The general principle to be observed after the first 2 or 3 in-service tests is that the intervals of future tests should be set to those which previous tests have shown can be achieved with no more than a small change in mixed water temperature.
*TMV Type 2: The frequency of performing the in-service tests is 1 year maximum.
Thermostatic Adjustment
Temperature Limitation
The temperature is limited by the safety stop to 40°C. If a higher temperature
is required, it is possible to over ride the safety stop by depressing the
safety button.
NB. It is recommended that for private domestic use the maximum mixed
water temperature be set at the following factory set values:
Shower Mixer 43°C
Bath/Shower 43°C
For healthcare applications the Temperatures must be set by following the
procedures on page 34. This ensures that after correct installation the outlet
temperature of the water can never exceed 43°C.
Temperatures can be set by following the procedures on page 34. This ensures
that after correct installation the outlet temperature of the water can never
exceed 43°C.
To guarantee a smooth running of the thermostatic element, it is necessary
from time to time to turn the thermostat from total hot to total cold. The
thermostatic mixer valve should be checked annually by o qualified person to
ensure correct operation.
The mixer is fined with check valves (page 37 pos. 96737000 and 93136000) and
filters (page 37 pas 96922000 and 98282000). If the water flow drops the
filters need to be cleaned. For that purpose please follow the steps 1 – 5 on
page 35.
Calibrating Thermostat
If the temperature reading is different to the showering temperature, follow
the steps 1 – 4 on page 33.
Auestraße 5 – 9
D-77761 Schiltach
Telefon +49 (0) 78 36/51-1282
Telefax +49 (0) 7836/511440
E-Mail: info@hansgrohe.com
Internet: www.hansgrohe.com
06/2022
9.01646.06 R02
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>