welltime 8601703275 High Cabinet “Star” Bathroom Furniture Instruction Manual

June 12, 2024
welltime

ASSEMBLY INSTRUCTIONS

SAFETY INSTRUCTIONS

In the assembly instructions for the cabinet, the triangle with the exclamation mark indicates the following safety instructions.
Do not exceed the suggested load limits to avoid personal injury and damage to the cabinet.

It is forbidden to climb on or lean against the drawers.

Keep hardware such as screws, screw covers, etc. away from children to avoid possible suffocation.

Strictly follow the assembly diagram.

Assembly must be carried out by qualified personnel: if it is not done correctly, the product may tip over or fall, damaging people or property.
Since there are different types of walls and materials, the screws for fixing the product to the wall are not included: contact a specialised dealer to
choose the most suitable fixing accessories for your wall.

GENERAL INFORMATION

It is advisable to call in qualified personnel to assemble the furniture and make the necessary plumbing and electrical connections.
Although the component materials are resistant to moisture and are suitable for use in bathrooms , direct contact with water for an excessively long period is not recommended.

The Manufacturer declines all responsibility for the consequences of incorrect installation.
The Manufacturer declines every responsibility of a different use of the product from the one to which it has been designed.

MATERIAL FOR ASSEMBLY

BUY ANCHOR SUITABLE FOR THE TYPE OFF WALL


UPPER FRONT

LOWER FRONT

LEFT SIDE

RIGHT SIDE

TOP / BOTTOM

FIX SHELF

SHELF

BACK PANEL

STEP 1___

LEFT SIDE

RIGHT SIDE

STEP 2__

LEFT SIDE

RIGHT SIDE

THIS OPERATION FOR THE LEFT OPENING DOORS

STEP 3___

LEFT SIDE

RIGHT SIDE

LEFT OPENING DOORS

RIGHT OPENING DOORS

STEP 4__

TOP / BOTTOM

FIX SHELF

STEP 5__

BACK PANEL

CONTROLLARE IL LATO PRIMA DI INSERIRLO
1 LATO BIANCO – 1 LATO GRIGIO

LEFT SIDE

RIGHT SIDE

STEP 6__

CORRECT POSITION TO FIX

LEFT SIDE

RIGHT SIDE

TOP / BOTTOM

FIX SHELF

STEP 7__

The heights indicated create an alignment with the basin base It is necessary to carefully check the position of the water and electricity pipes before drilling holes in the wall.

FLOOR

STEP 8___

The heights indicated create an alignment with the basin base It is necessary to carefully check the position of the water and electricity pipes before drilling holes in the wall.

STEP 9___

FLOOR

ATTENTION TO PIPES

FLOOR

ATTENTION TO PIPES

STEP 10__

FLOOR

CORRECT POSITION FLOOR

CORRECT POSITION FLOOR

STEP 11_____

2 PEOPLE ARE REQIURED TO CARRY OUT THIS OPERATION

STEP 12__

FOR A CORECT POSITIONING USE THE LEVEL

STEP 13__

CHECK CORRECT POSITION

STEP 14__

INSERT CYLINDIRCAL INSIDE THE HOLE, FLAT SIDE UPWARDS

STEP 15__

SHELF

STEP 16__

UPPER FRONT

LOWER FRONT

STEP 17__

STEP 18__

STEP 19_____

STEP 20_____

BEFORE ADJUSTING THE DOORS ,MAKE SURE THAT THE CABINET IS IN VERTICAL POSITION

REMOVE THE FILM ON THE FRONT DOORS

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals