welltime 8601703275 High Cabinet “Star” Bathroom Furniture Instruction Manual
- June 12, 2024
- welltime
Table of Contents
- ASSEMBLY INSTRUCTIONS
- SAFETY INSTRUCTIONS
- GENERAL INFORMATION
- MATERIAL FOR ASSEMBLY
- STEP 1___
- STEP 2__
- STEP 3___
- STEP 4__
- STEP 5__
- STEP 6__
- STEP 7__
- STEP 8___
- STEP 9___
- STEP 10__
- STEP 11_____
- STEP 12__
- STEP 13__
- STEP 14__
- STEP 15__
- STEP 16__
- STEP 17__
- STEP 18__
- STEP 19_____
- STEP 20_____
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
ASSEMBLY INSTRUCTIONS

SAFETY INSTRUCTIONS
In the assembly instructions for the cabinet, the triangle with the
exclamation mark indicates the following safety instructions.
Do not exceed the suggested load limits to avoid personal injury and damage to
the cabinet.
It is forbidden to climb on or lean against the drawers.
Keep hardware such as screws, screw covers, etc. away from children to avoid possible suffocation.
Strictly follow the assembly diagram.
Assembly must be carried out by qualified personnel: if it is not done
correctly, the product may tip over or fall, damaging people or property.
Since there are different types of walls and materials, the screws for fixing
the product to the wall are not included: contact a specialised dealer to
choose the most suitable fixing accessories for your wall.
GENERAL INFORMATION
It is advisable to call in qualified personnel to assemble the furniture and
make the necessary plumbing and electrical connections.
Although the component materials are resistant to moisture and are suitable
for use in bathrooms , direct contact with water for an excessively long
period is not recommended.
The Manufacturer declines all responsibility for the consequences of incorrect
installation.
The Manufacturer declines every responsibility of a different use of the
product from the one to which it has been designed.
MATERIAL FOR ASSEMBLY
BUY ANCHOR SUITABLE FOR THE TYPE OFF WALL

UPPER FRONT
LOWER FRONT
LEFT SIDE
RIGHT SIDE
TOP / BOTTOM
FIX SHELF
SHELF
BACK PANEL

STEP 1___
LEFT SIDE
RIGHT SIDE

STEP 2__
LEFT SIDE
RIGHT SIDE
THIS OPERATION FOR THE LEFT OPENING DOORS

STEP 3___
LEFT SIDE
RIGHT SIDE
LEFT OPENING DOORS
RIGHT OPENING DOORS

STEP 4__
TOP / BOTTOM
FIX SHELF

STEP 5__
BACK PANEL

CONTROLLARE IL LATO PRIMA DI INSERIRLO
1 LATO BIANCO – 1 LATO GRIGIO
LEFT SIDE
RIGHT SIDE

STEP 6__

CORRECT POSITION TO FIX
LEFT SIDE
RIGHT SIDE
TOP / BOTTOM
FIX SHELF

STEP 7__

The heights indicated create an alignment with the basin base It is necessary to carefully check the position of the water and electricity pipes before drilling holes in the wall.

FLOOR
STEP 8___

The heights indicated create an alignment with the basin base It is necessary to carefully check the position of the water and electricity pipes before drilling holes in the wall.

STEP 9___

FLOOR
ATTENTION TO PIPES

FLOOR
ATTENTION TO PIPES
STEP 10__


FLOOR
CORRECT POSITION FLOOR
CORRECT POSITION FLOOR
STEP 11_____
2 PEOPLE ARE REQIURED TO CARRY OUT THIS OPERATION

STEP 12__

FOR A CORECT POSITIONING USE THE LEVEL

STEP 13__
CHECK CORRECT POSITION

STEP 14__
INSERT CYLINDIRCAL INSIDE THE HOLE, FLAT SIDE UPWARDS

STEP 15__
SHELF

STEP 16__
UPPER FRONT
LOWER FRONT

STEP 17__

STEP 18__

STEP 19_____

STEP 20_____
BEFORE ADJUSTING THE DOORS ,MAKE SURE THAT THE CABINET IS IN VERTICAL POSITION
REMOVE THE FILM ON THE FRONT DOORS

Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>