SQUIBB TAYLOR A120 LB-1 Latch Block Break Away Assembly Installation Guide
- October 30, 2023
- SQUIBB TAYLOR
Table of Contents
A120 LB-1 Latch Block Break Away Assembly
Installation Guide Replacement Manual For
LB -1
Latch Block Break-Away Assembly
IMPORTANT:
KEEP THIS DOCUMENT WITH THE PRODUCT UNTIL IT REACHES THE END USER.
WARNING
The A120MAN Fail Safe Remote Manual Release must be used for ANHYDROUS AMMONIA
APPLICATIONS ONLY.
DO NOT USE IN LPG/PROPANE SERVICE.
USER SAFETY RESPONSIBILITY STATEMENT FOR SQUIBB TAYLOR PRODUCTS
FAILURE OR IMPROPER SELECTION OR IMPROPER USE OF THE PRODUCTS DESCRIBED HEREIN OR RELATED ITEMS CAN CAUSE DEATH, PERSONAL INJURY AND PROPERTY DAMAGE.
- This document and other information from Squibb Taylor and authorized distributors provide product or system options for further investigation by users having technical expertise.
- The user, through its own analysis and testing, is solely responsible for making the final selection of the system and components and assuring that all performance, endurance, maintenance, safety and warning requirements of the application are met. The user must analyze all aspects of the application, follow applicable industry standards, and follow the information concerning the product in the current product catalog and in any other materials provided from Squibb Taylor or authorized distributors.
To the extent that Squibb Taylor or authorized distributors provide component
or system options based upon data or specifications provided by the user, the
user is responsible for determining that such data and specifications are
suitable and sufficient for all applications and reasonably foreseeable uses
of the components or systems.
Failure to follow these instructions or to properly install and maintain this
equipment could result in personal injury or death. Equipment must be
installed, operated and maintained in accordance with federal, state and local
codes.
The installation must also comply with NFPA No. 70 and ANSI K61.1, (CGA G-2.1)
standards and/or local authority having jurisdiction. Only personnel trained
in the proper procedures, codes, standards and regulations of the Anhydrous
Ammonia industry shall install and service this equipment.
Scope of the Manual
This instruction manual covers the Replacement of the LB-1 for the A120MAN
Manual Release for 1 1/4” (A120) & 1 1/2” (A125 & A15) internal valves
manufactured by Marshall Excelsior Co. for outdoor Anhydrous Ammonia (NH3)
applications. LB-1 Break-Away
Coupling Assembly With Carabiner
Parts List
Part Description | Qty. |
---|---|
LB-1 Break-Away Coupling with Carabiner | 1 Pc. |
NOTE: REFER TO THE INSTRUCTION MANUAL SUPPLIED WITH THE INTERNAL VALVE OR SQUIBB TAYLOR’S WEBSITE FOR ALL WARNINGS, CUSTOMER NOTIFICATIONS, SPECIFICATIONS, OPERATION, CAUTIONS, MAINTENANCE, & PARTS. CALL SQUIBB TAYLOR @ 800.345.8105 WITH ANY QUESTIONS BEFORE PROCEEDING.
Replacement Of The Break-Away Insert Assembly
-
Remove the Phillips Head Screw from the Break-Away Coupling.
-
Remove the Break-Away Insert from the Break-Away Coupling. Grasp the outside of the Coupling & push on the Break-Away Insert until it is free of the Coupling.
-
Make sure that you push the Break-Away Insert out of the Coupling on the side that is attached to the Manual Release.
-
Remove the Manual Release cable from the Break-Away Insert.
-
Replace the Manual Release Cable End back into the new Break-Away Insert.
-
Keep both cables spread apart from the center of the Break-Away Insert. Slide the Coupling over the Break-Away Insert, just enough to cover the ends of the cables.
-
Line the Big Hole in the Coupling up with the hole that is in the Break-Away Insert.
-
Replace the Phillips Head Screw as shown. Tighten the screw with a Phillips Head Screw driver.
-
Check both cables. Make sure that each cable rotates in & out.
Note:
The Break-Away Insert should be replaced after a Break-Away.
CAUTION
DO NOT Modify the Cable/Carabiner Assembly. Could cause Injury or Death! Only
Use Squibb Taylor Replacement Parts.
Maintenance
WARNING
ONLY PERSONNEL TRAINED IN THE PROPER PROCEDURES, CODES, STANDARDS &
REGULATIONS OF THE ANHYDROUS AMMONIA INDUSTRY SHALL PERFORM MAINTENANCE ON
THIS EQUIPMENT. Before starting any type of maintenance, close off the A120MAN
valve(s) & remove all Anhydrous Ammonia (NH3) pressure from the Outlet of the
Internal Shutoff Valve. If maintenance or repairs are to be made on the
internal valve(s), refer to the Instruction Manual for the particular valve
model. An A120MAN manual release that has been disassembled must be tested for
proper operation before being returned to service.
CHECK ACTUATOR PERIODICALLY FOR THE FOLLOWING:
Make sure that both cables move freely inside the Break-Away Coupling.
While this information is presented in good faith and believed to be accurate,
Individuals using this literature must exercise their independent judgment in
evaluating product selection and determining product appropriateness for their
particular purpose, system requirements and certifications. The manufacturer
reserves the right to change product designs and specifications without
notice.
www.squibbtaylor.com
1.800.345.8105
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>