OUKANING HG-HCX-2394-US Industrial Flush Mount Metal Cage Ceiling Light Installation Guide

October 30, 2023
OUKANING

Installation Guide

HG-HCX-2394-US Industrial Flush Mount Metal Cage Ceiling Light

Please kindly read the below instructions before installation. Please install the light by a licensed electrician.

  1. Shut off the power at the circuit breaker and remove old fixture, including the crossbar.
  2. Carefully unpack your new fixture and lay out all the parts on a clear area. Take care not to lose any small parts necessary for installation.
  3. Attach the Mounting Plate to the Outlet Box (not supplied) by using 2 Outlet Box Screws.
  4. Carefully check the new light fixture to see if there are any small parts missing. We suggest this light to be installed by a licensed electrician.
  5. Connect the electrical wires as
  6. Connect the Black Wire(Live Wire) from the fixture to the Black House Wire (Live Wire , also calls Hot Wire) with the connector in red.
  7. Connect the White Vere(Neutral Wire) from the fixture to the White House Wire(Neutral Wire) with the
  8. Connect the Mid Point of the Fixture Ground Wire(Bare Copper Wire) to Wall Mount Plate Hole that mask as GND and then wrap and fasten it by the Green Screw. Finally, connect the End Point of the Fixture Ground Wire to the House Ground Vireo(Green or Bare Copper) with the connector in red. If your Outlet Box doesn’t have a Ground Wire (green or bare copper), just directly to connect the end point of Fixture Ground Wire to the Wall Mount Plate Hole that maks as GND and then wrap and fasten it by the Green Screw.
  9. Make sure all Wire Connectors are secured. You may wrap the connections with electrical tape. Tuck the wire connections neatly into the Outlet box.OUKANING HG-HCX-2394-US Industrial Flush Mount Metal Cage Ceiling Light - Light
  10. Attach the Fixture Canopy to the Mounting Plate and align the holes of the canopy to the 2 Mounting Screws on the plate and get them tighten and secured by the Ball Nuts.
  11. Attach the E26 Medium Base Light Bulbs on the sockets. Then turn on the power at the circuit breaker and test the light to check if it is working.

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

OUKANING User Manuals

Related Manuals