SLOT 1 Pendant S1LI Suspended Linear Lighting Instruction Manual

June 10, 2024
SLOT 1

Pendant S1LI Suspended Linear Lighting

Pendant S1LI Suspended Linear Lighting

Product Information

The product is a pendant light fixture available in three models: S1LI, S1LD, and S1LID. The user manual provides installation instructions for the pendant light fixture.

Safety Instructions

It is important to read and follow all safety instructions before installing or servicing the product. The user manual provides important safety instructions that must be followed to avoid the risk of electric shock, burn, injury, fire, or product damage.

Installation Instructions

The installation instructions are divided into several sections:

  • Overview: Provides an overview of the product.
  • Parts: Lists all the parts included in the product.
  • Set Up Ceiling: Provides instructions on how to set up the ceiling for the installation.
  • Prep Fixtures: Provides instructions on how to prepare the fixtures for installation.
  • Install Head Unit: Provides instructions on how to install the head unit of the fixture.
  • Install Fixture: Provides instructions on how to install the fixture.
  • Electrical Connections: Provides instructions on how to make electrical connections according to the National Electrical Code and any applicable local code requirements.
  • Supplemental: Provides additional information on how to install and maintain the product.
  • Contractor Resources: Provides additional resources for contractors.

Product Usage Instructions

Before using the product, it is important to ensure that it has been installed properly according to the instructions provided in the user manual. The following instructions should be followed when using the product:

  • Wear gloves and safety glasses at all times when removing the luminaire from the carton, installing, servicing, or performing maintenance.
  • Avoid direct eye exposure to the light source while it is on.
  • Keep combustible and other materials that can burn away from the lamp/lens.
  • Do not operate the fixture in close proximity to persons, combustible materials, or substances affected by heat or drying.
  • Never connect components under load.
  • Do not mount or support these fixtures in a manner that can cut the outer jacket or damage wire insulation.
  • Controls for dimming, auto-sensing, or remote control of a luminaire that are not factory-wired to the luminaire must be checked for compatibility with the luminaire prior to installation.
  • LED fixtures must be powered directly to a switched circuit.
  • Do not restrict fixture ventilation. Allow for some volume of airspace around the fixture.
  • Avoid covering LED fixtures with insulation, foam, or other material that will prevent convection or conduction cooling.
  • Do not exceed fixtures maximum ambient temperature.
  • Only use the fixture in its intended location.
  • LED products are Polarity Sensitive. Ensure proper Polarity before installation.
  • Electrostatic Discharge (ESD): ESD can damage LED fixtures. Personal grounding equipment must be worn during all installation or servicing of the unit.
  • Do not touch individual electrical components as this can cause ESD, shorten lamp life, or alter performance.
  • Some components inside the fixture may not be serviceable. In the unlikely event your unit may require service, stop using the unit immediately.

SLOT 1

Safety p.1

Overview

Installation Instructions – Pendant S1LI/S1LD/S1LID

Parts

Set Up Ceiling

Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental

p.10

p.11

p.13

p.14

p.20

p.27

p.31

Important Safety Instructions

READ AND FOLLOW ALL SAFETY INSTRUCTIONS! SAVE THESE INSTRUCTIONS AND DELIVER TO OWNER AFTER INSTALLATION

Contractor Resources p.32

· To reduce the risk of death, personal injury or property damage from fire, electric shock, falling parts, cuts/abrasions, and other hazards please read all warnings and instructions included with and on the fixture box and all fixture labels.
· Before installing, servicing, or performing routine maintenance upon this equipment, follow these general precautions. · Installation and service of luminaires should be performed by a qualified licensed electrician.
· Maintenance of the luminaires should be performed by person(s) familiar with the luminaires construction and operation and any hazards involved. Regular fixture maintenance programs are recommended.
· It will occasionally be necessary to clean the outside of the refractor/lens. Frequency of cleaning will depend on ambient dirt level and minimum light output which is acceptable to user. Refractor/lens should be washed in a solution of warm water and any mild, non-abrasive household detergent, rinsed with clean water and wiped dry. Should optical assembly become dirty on the inside, wipe refractor/lens and clean in above manner, replacing damaged gaskets as necessary.
· DO NOT INSTALL DAMAGED PRODUCT! This luminaire has been properly packed so that no parts should have been damaged during transit. Inspect to confirm. Any part damaged or broken during or after assembly should be replaced.
· Recycle: For information on how to recycle LED electronic products, please visit www.epa.gov.
· These instructions do not purport to cover all details or variations in equipment nor to provide every possible contingency to meet in connection with installation, operation, or maintenance. Should further information be desired or should particular problems arise which are not covered sufficiently for the purchaser’s or owner’s purposes, this matter should be referred to Acuity Brands Lighting, Inc.

WARNING RISK OF ELECTRIC SHOCK
Disconnect or turn off power before installation or servicing. Verify that supply voltage is correct by comparing it with the
luminaire label information. Make all electrical and grounded connections in accordance
with the National Electrical Code (NEC) and any applicable local code requirements. All wiring connections should be capped with UL approved recognized wire connectors.

WARNING RISK OF BURN
Allow lamp/fixture to cool before handling. Do not touch enclosure or light source.
Do not exceed maximum wattage marked on luminaire label. Follow all manufacturer’s warnings, recommendations and
restrictions for: driver type, burning position, mounting locations/methods, replacement and recycling.

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

1

SLOT 1

Installation Instructions – Pendant S1LI/S1LD/S1LID

Safety p.1

Overview

Parts

p.6

p.10

Set Up Ceiling p.11

Prep Fixtures Install Head Unit Install Fixture

p.13

p.14

p.20

Important Safety Instructions

Electrical Connections p.27

Supplemental p.31

Contractor Resources p.32

CAUTION RISK OF INJURY
Wear gloves and safety glasses at all times when removing luminaire from carton, installing, servicing or performing maintenance.
Avoid direct eye exposure to the light source while it is on.

CAUTION RISK OF FIRE
Keep combustible and other materials that can burn, away from lamp/lens.
Do not operate in close proximity to persons, combustible materials or substances affected by heat or drying.

CAUTION: RISK OF PRODUCT DAMAGE

Never connect components under load. Do not mount or support these fixtures in a manner that can cut the outer jacket or damage wire insulation. Controls for dimming, auto-sensing, or remote control of a luminaire that are not factory- wired to the luminaire must be checked for
compatibility with the luminaire prior to installation. LED fixtures must be powered directly to a switched circuit. Unless individual product specifications deem otherwise: Do not restrict fixture ventilation. Allow for some volume of airspace around fixture.
Avoid covering LED fixtures with insulation, foam, or other material that will prevent convection or conduction cooling.
Unless individual product specifications deem otherwise: Do not exceed fixtures maximum ambient temperature. Only use fixture in its intended location. LED products are Polarity Sensitive. Ensure proper Polarity before installation. Electrostatic Discharge (ESD): ESD can damage LED fixtures. Personal grounding equipment must be worn during all installation or servicing
of the unit.
Do not touch individual electrical components as this can cause ESD, shorten lamp life, or alter performance. Some components inside the fixture may not be serviceable. In the unlikely event your unit may require service, stop using the unit immediately
and contact an ABL representative for assistance.
Always read the fixtures complete installation instructions prior to installation for any additional fixture specific warnings. Always ensure that the electrical distribution system is up to NEC (and any applicable local code) requirements. Verify that power distribution system has proper grounding. Lack of proper earth ground can lead to fixture failure and may void warranty.

Choose either Part 15 OR Part 18 and move to Page 3 Installation Instructions under Delivery. Lithonia Outdoor will always use Part 15.
All luminaires that contain electronic devices that generate frequencies above 9kHz from any component within the luminaire comply with Part 15 of the FCC Rules. Operation is subject to the following two conditions:

(1)

This device may not cause harmful interference.

(2)

This device must accept any interference received, including interference that may cause undesired operation.

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

2

SLOT 1

Safety p.1

Overview p.6

Installation Instructions – Pendant S1LI/S1LD/S1LID

Parts

Set Up Ceiling

Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental Contractor Resources

p.10

p.11

p.13

p.14

p.20

p.27

p.31

p.32

Important Safety Instructions
This device complies with Part 18 of the FCC Rules but may cause interference with cordless and cell phones, radios, televisions, and other electronic devices. To correct the problem, move the device away from the luminaire or plug into a different outlet. This product may cause interference to radio equipment and should not be installed near maritime safety communications equipment or other critical navigation or communications equipment operating between 0.45-30MHz.
Failure to follow any of these instructions could void product warranties. For a complete listing of product Terms and Conditions, please visit www.acuitybrands.com.
Acuity Brands Lighting, Inc. assumes no responsibility for claims arising out of improper or careless installation or handling of its products. ABL LED General Warnings, Form No. 503.203
© 2021, 2010, 2016 Acuity Brands Lighting, Inc. All rights reserved. 12/01/10
READ AND FOLLOW ALL SAFETY INSTRUCTIONS! SAVE THESE INSTRUCTIONS AND DELIVER TO OWNER AFTER INSTALLATION

· To reduce the risk of death, personal injury or property damage from fire, electric shock, falling parts, cuts/abrasions, and other hazards please read all warnings and instructions included with and on the fixture box and all fixture labels.
· Before installing, servicing, or performing routine maintenance upon this equipment, follow these general precautions. · Installation and service should be performed by a qualified licensed electrician. · Maintenance should be performed by qualified person(s) familiar with the products’ construction and operation and any hazards
involved. Regular maintenance programs are recommended. · DO NOT INSTALL DAMAGED PRODUCT! This product has been properly packed so that no parts should have been damaged during
transit. Inspect to confirm. Any part damaged or broken during or after assembly should be replaced. · These instructions do not purport to cover all details or variations in equipment nor to provide every possible contingency to meet in
connection with installation, operation, or maintenance. Should further information be desired or should particular problems arise which are not covered sufficiently for the purchaser’s or owner’s purposes, this matter should be referred to Acuity Brands Lighting, Inc.

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

3

SLOT 1

Safety p.1

Overview p.6

Installation Instructions

– Pendant S1LI/S1LD/S1LID

Parts

Set Up Ceiling

Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental Contractor Resources

p.10

p.11

p.13

p.14

p.20

p.27

p.31

p.32

Important Safety Instructions

WARNING RISK OF ELECTRIC SHOCK
Disconnect or turn off power before installation or servicing. Verify that supply voltage is correct by comparing it with the
luminaire label information. Make all electrical and grounded connections in accordance
with the National Electrical Code (NEC) and any applicable local code requirements. All wiring connections should be capped with UL approved recognized wire connectors.

WARNING RISK OF BURN
Allow lamp/fixture to cool before handling. Do not touch enclosure or light source.
Do not exceed maximum wattage marked on luminaire label. Follow all manufacturer’s warnings, recommendations
and restrictions for: driver type, burning position, mounting locations/methods, replacement and recycling.

CAUTION RISK OF INJURY
Wear gloves and safety glasses at all times when removing luminaire from carton, installing, servicing or performing maintenance.
Avoid direct eye exposure to the light source while it is on.

CAUTION RISK OF FIRE
Keep combustible and other materials that can burn, away from lamp/lens.
Do not operate in close proximity to persons, combustible materials or substances affected by heat or drying.

Always read the fixtures complete installation instructions prior to installation for any additional fixture specific warnings. Failure to follow any of these instructions could void product warranties. For a complete listing of product Terms and Conditions, please
visit www.acuitybrands.com.
Acuity Brands Lighting, Inc. assumes no responsibility for claims arising out of improper or careless installation or handling of its products. ABL LED General Warnings, Form No. 503.203
© 2021, 2010, 2016 Acuity Brands Lighting, Inc. All rights reserved. 12/01/10

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

4

SLOT 1

Safety p.1

Overview p.6

Installation Instructions – Pendant S1LI/S1LD/S1LID

Parts

Set Up Ceiling

Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental Contractor Resources

p.10

p.11

p.13

p.14

p.20

p.27

p.31

p.32

Important Safety Instructions

CAUTION: RISK OF PRODUCT DAMAGE
Electrostatic Discharge (ESD): ESD can damage product(s). Personal grounding equipment must be worn during all installation or servicing of the unit.
Do not touch individual electrical components as this can cause ESD and affect product Performance. Do not stretch or use cable sets that are to short or are of insufficient length. Do not tamper with contacts. Do not modify the product. Do not change or alter internal wiring or installation circuitry. Do not use product for anything other than its intended use. If installing latching springs: ensure that the springs are fully engaged prior to moving to next connection. If installing wiring systems: Materials and component parts of a manufacturing wiring system as described in Article 604 of the National Electric
Code and Underwriters Laboratories Standard for Safety #183 MUST BE installed.
Please see product specific installation instructions for additional warnings or any applicable FCC or other regulatory statements.
Failure to follow any of these instructions could void product warranties. For a complete listing of product Terms and Conditions, please visit www.acuitybrands.com.

Our Brands

Indoor/Outdoor Lithonia Lighting Carandini Holophane RELOC Light Concepts

Indoor Lighting Gotham Mark Architectural Lighting Peerless Renaissance Lighting Winona Lighting

Outdoor Lighting American Electric Lighting Antique Street Lamps Hydrel Tersen

Controls DARK TO LIGHT LC&D ROAM Sensor Switch Synergy

Daylighting SunOptics

Acuity Brands Lighting, Inc. assumes no responsibility for claims arising out of improper or careless installation or handling of its products. ABL LED General Warnings, Form No. 503.203
© 2021, 2010, 2016 Acuity Brands Lighting, Inc. All rights reserved. 12/01/10

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

5

SLOT 1

Safety p.1

Overview p.6

A. Overview – Fixture

Installation Instructions – Pendant S1LI/S1LD/S1LID

Parts

Set Up Ceiling

Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental Contractor Resources

p.10

p.11

p.13

p.14

p.20

p.27

p.31

p.32

NOTE: Illustrations are used for reference only and can differ slightly from the actual lighting system installed. However, key components addressed in this information are represented as accurately as possible.
DO NOT CONNECT FIXTURE TO LINE VOLTAGE POWER; IT IS A LOW VOLTAGE UNIT.

Grip-Lock Hanging Bracket

Aircraft Cable

Direct
S1LD

Feed Cord

End Cap

LEFT SECTION (S1L..L)

RIGHT SECTION (S1L..R) INTERMEDIATE SECTION (S1L..I)

Indirect
S1LI
Bi-Direct
S1LID

Modulus Remote Head Unit
marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

6

SLOT 1

Safety p.1

Overview

Parts

p.6

p.10

A. Overview – Mounting

For an Individual Luminaire

Installation Instructions – Pendant S1LI/S1LD/S1LID

Set Up Ceiling p.11

Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental

p.13

p.14

p.20

p.27

p.31

Contractor Resources p.32

“C”

“B”

“C”

“A”

ORDERED LENGTH
2FT 3FT 4FT 5FT 6FT 7FT 8FT

INDIVIDUAL FIXTURE

“A” O.A.L

“B” O.C

“C” FROM END

2′ – 13/32″

1′ – 11 13/32″

1/2″

3′ – 13/32″

2′ – 11 13/32″

1/2″

4′ – 13/32″

3′ – 11 13/32″

1/2″

5′ – 13/32″

4′ – 11 13/32″

1/2″

6′ – 13/32″

5′ – 11 13/32″

1/2″

7′ – 13/32″

6′ – 11 13/32″

1/2″

8′ – 13/32″

7′ – 11 13/32″

1/2″

APPROX WEIGHT
3LB 5LB 7LB 8LB 10LB 11LB 13LB

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

7

SLOT 1

Safety p.1

Overview p.6

A. Overview – Mounting

Run Configurations

Installation Instructions – Pendant S1LI/S1LD/S1LID

Parts

Set Up Ceiling

Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental

p.10

p.11

p.13

p.14

p.20

p.27

p.31

Contractor Resources p.32

“C”

“B-1”

“A-1”

“B-2” “A-2”

“B-1”

“C”

“A-1”

ORDERED LENGTH 4FT 5FT 6FT 7FT 8FT

“A-1″ O.A.L. 4′ – 3/16″ 5′ – 3/16″ 6′ – 3/16″ 7′ – 3/16″ 8′ – 3/16”

“A-2″ O.A.L. 4′ – 0″ 5′ – 0″ 6′ – 0″ 7′ – 0″ 8′ – 0”

RUN LAYOUT “B-1″ O.C. 3′ – 11 23/32″ 4′ – 11 23/32″ 5′ – 11 23/32″ 6′ – 11 23/32″ 7′ – 11 23/32”

“B-2″ O.C. 4′ – 0″ 5′ – 0″ 6′ – 0″ 7′ – 0″ 8′ – 0”

“C” FROM END 1/2″ 1/2″ 1/2″ 1/2″ 1/2″

APPROX. WEIGHT 7LB 8LB 10LB 11LB 13LB

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

8

SLOT 1

Installation Instructions – Pendant S1LI/S1LD/S1LID

Safety p.1

Overview

Parts

p.6

p.10

A. Overview ­ Run Layout

Set Up Ceiling p.11

Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental

p.13

p.14

p.20

p.27

p.31

Individual LED Watts

Slot Head Unit Requirements Indirect

LMF

0 </= 400 </= 600 </= 800 </= 1000 </= 1200

0

32ft 32ft

32ft

32ft

32ft

32ft

</= 200 32ft 32ft

32ft

32ft

32ft

28ft

Direct

</= 400 32ft 32ft

32ft

32ft

28ft

24ft

</= 600 32ft 32ft

32ft

28ft

24ft

24ft

</= 800 32ft 32ft

28ft

24ft

24ft

20ft

</= 1000 30ft 28ft

24ft

24ft

20ft

18ft

Contractor Resources p.32

The above table shows the maximum run length for combination of Direct/Indirect lumen packages for one head unit. As an Example: For a 48ft Bidirect luminaire run with 400LMF Indirect and 800LMF Direct lumen package, if the customer orders six 8ft luminaires then the run should look like below:

Max Run Per Head Unit Based On Lumen Package (Refer To Table Above)

Do Not Connect Luminaires Powered From Separate Head Unit (DK320M)

ELEVATION VIEW TYPICAL LUMINAIRE LAYOUT (*HANGING POINTS CAN VARY BASED ON CONFIGURATIONS)
marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

9

SLOT 1

Installation Instructions – Pendant S1LI/S1LD/S1LID

Safety p.1
B. Parts

Overview

Parts

p.6

p.10

Set Up Ceiling p.11

Prep Fixtures p.13

· Provided in a separate red box labeled “INSTALLATION

HARDWARE PLEASE OPEN FIRST”.

1

· All other parts for installation to be provided by others.

NOTE: Feed kit is the same for F1/F2 and parts are provided for both types of ceiling install. See parts list on this page for provided mounting hardware kit.

2 3
2 3

Install Head Unit Install Fixture Electrical Connections Supplemental

p.14

p.20

p.27

p.31

Contractor Resources p.32

Grid Mount J-box

8

*274WJ0

(provided with F1A option only)

Strain Relief
White: 274W1U Black: 274W2L

Cross Bar
274W1N
Grid Clip
274W1R

Mini Cable Gripper

9

*274W1J

10

Coupler (2″ Canopy)

*274W24

4 5
11

7

8

6

13

4 12

10

5

11
5″ Round Feed/CAT5 Canopy
White: 274WH1 (274WJ7) Black: 274WHG (274WL5) Silver: 274WMV (274WPA)
5″ Round Dual Feed Canopy 12
White: 274WLJ (274WN0) Black: 274WMP (274WNY) Silver: 274WPV (274WR5)

Coupler (5″ Canopy)
274W2K
Aircraft Cable
36″:
274W2W 72″: 274W2G 150″:274WH0

12 9
9

5″ Round Support Canopy

6

White:274WK8 (274WML)

Black: 274WMX (274WMX)

Silver: 274WPJ (274WR1)

2″ Round Support Canopy

7

White: 274W2S (274WHC) Black: 274WHL (274WHL)

13

Silver: 274WLU (274WNV)

NOTE: For square canopies, use part #s in the parenthesis.

Feed Cord (White)
12FT: 270WLL (female connector) 12FT: 275SN2 (male connector)
Feed Cord (Black)
12FT: 2751M5 (female connector) 12FT: 2716E6 (male connector)

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

10

SLOT 1

Installation Instructions – Pendant S1LI/S1LD/S1LID

Safety p.1

Overview

Parts

p.6

p.10

C. Set Up Ceilings ­ Grid Ceilings

Set Up Ceiling p.11

Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental

p.13

p.14

p.20

p.27

p.31

Contractor Resources p.32

1 Conduit (by others)
T-Bar Cross-Bar

8 Screws

Canopy Feed Cord Strain Relief

J-box (by others)

2

Bolt

J-box

Cord

Canopy

To Fixture

Bracket (B)

Cable Retainer

Canopy Coupler

Bracket (A) T-Bar

3
Caddy Bar (by others)

Bracket (B)
Bracket (A) Tab

Bracket (A)

Hanger Bracket (A)
Hanger Bracket (A) Tab

Caddy Bar Brackets (by others)
Hanger Bracket (B)

Feed Locations: a. Install J-box (by others) into the ceiling. Ensure the bottom edge is flush with the ceiling. Connect the metal conduit from building power to the J-box.
b. Mount the crossbar to the J-box using (2) #8 screws and fasten it securely to the J-box.
c. Insert strain relief to the feed cord.
d. Pass the feed cord through the hole in the canopy and make wire connections inside J-box. Flush the canopy with the crossbar and thread coupler onto crossbar screw.

Non-Feed Locations (On-Grid): a. Insert bolt into the bottom of bracket (A) and hook onto grid member.
b. Hook bracket (B) onto bracket (A) and adjust brackets to proper location along the ceiling grid and push the tab from (A) towards bracket (B) to secure brackets together.
c. Secure the brackets to the building structure per local building codes.

Non-Feed Locations (Off-Grid): a. Insert bolt into the bottom of bracket (A) and hook together with bracket (B). Secure with nut (DO NOT TIGHTEN).
b. Slide hanger onto caddy bar and fit caddy bar into upper slots on the grid members.
c. Adjust brackets to proper location and push the tab from bracket (A) towards bracket (B) to secure brackets together.
d. Secure the brackets to the building structure per local building codes.

DO NOT CONNECT FIXTURE TO LINE VOLTAGE POWER; IT IS A LOW VOLTAGE UNIT.

All 4 WIRES FROM THE HARNESS MUST BE CONNECTED; ALL FIXTURES REQUIRE POWER AND CONTROL SIGNAL WIRES.

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

11

SLOT 1

Safety p.1

Overview

Parts

p.6

p.10

C. Set Up Ceilings – Hard – Lid

Installation Instructions – Pendant S1LI/S1LD/S1LID

Set Up Ceiling p.11

Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental

p.13

p.14

p.20

p.27

p.31

Contractor Resources p.32

1

2

Ceiling

J-box (by others)
Cross-Bar

Ceiling

J-box Canopy
Cord

1/4-20
Threaded Rod (by others)

3/8″ to 5/8″ Below the Ceiling

8 Screws

1/4-20 Screw

To Fixture

Canopy

Feed Cord

Canopy Coupler

Strain Relief Feed Locations:
a. Install the 4O J-box (by others) into the ceiling. Ensure the bottom edge is flush with ceiling. Connect the metal conduit from building power to the J-box.
b. Mount crossbar to J-box using (2) #8 screws and fasten it securely to J-box.
c. Install strain relief to the feed cord.
d. Pass feed cord through the bushing in the canopy and make wire connections inside J-box. Flush the canopy with the crossbar and thread coupler onto the crossbar screw.

Coupler

Coupler

Ceiling Canopy

Non-Feed Locations: a. Secure 1/4-20 threaded rod approximately 3/8″ to 5/8″ below the ceiling. b. Insert canopy and securely fasten the coupler.

DO NOT CONNECT FIXTURE TO LINE VOLTAGE POWER; IT IS A LOW VOLTAGE UNIT. ALL 4 WIRES FROM THE HARNESS MUST BE CONNECTED.

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

12

SLOT 1

Safety p.1

Overview p.6

D. Prep Fixtures

Locate Material
1

Installation Instructions – Pendant S1LI/S1LD/S1LID

Parts

Set Up Ceiling

Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental Contractor Resources

p.10

p.11

p.13

p.14

p.20

p.27

p.31

p.32

All components required to install the fixture run/pattern are on one pallet.
· Fixture Sections · Joining Hardware · Record Drawings

Fixture Identification
2
FIXTURES MUST BE INSTALLED IN ORDER AS SHOWN ON RECORD DRAWINGS.

Mark as Field

Unique Run/Pattern # Section #

F-08-32FT
ID: 2.001
A427-40250-0-LLA-1.001

Order #

NOTE: Each luminaire section must be paired with its corresponding head unit. Look for matching fixture types on the luminaire and head unit packaging boxes.

LEFT 2.000

INTERMEDIATE 2.001

INTERMEDIATE 2.001

RIGHT 2.002

· Labels are located on the carton, on the fixture, and on the lens. · Each section is identified by an ID#. · Section position starting with X.000 for the first fixture. · Same fixture configuration can carry identical ID# and are
interchangeable.
· Individual fixtures have whole numbers. · For replacement parts, provide ID# and order #.

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

13

SLOT 1

Safety p.1

Overview p.6

E. Install Head Unit

Installation Instructions – Pendant S1LI/S1LD/S1LID

Parts

Set Up Ceiling

Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental Contractor Resources

p.10

p.11

p.13

p.14

p.20

p.27

p.31

p.32

F1 Grid Head Unit

1′-10

F2 Hard – Lid Head Unit

OVERALL DIMENSIONS 2′-2 ¼” x 2′-¾” x 4 ¾”
Overview of Head Unit for Grid Ceiling
Head Unit

OVERALL DIMENSIONS 1′-8 ¼” x 1′-3/8″ x 2 5/8″
Overview of Head Unit for Hard – Lid Ceiling

Grid Frame Assembly NOTE: 50ft max distance between head unit and J-box for the fixture.

Head Unit

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

14

SLOT 1

Installation Instructions – Pendant S1LI/S1LD/S1LID

Safety p.1

Overview

Parts

p.6

p.10

E. Install Head Unit – Grid Ceilings

Set Up Ceiling p.11

Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental

p.13

p.14

p.20

p.27

p.31

Contractor Resources p.32

1

2

3

Channel

Bar

Closed

Open

Bend Tab

a. Align the two holes of the frame assembly (provided in the kit) with the holes provided in the sides of head unit and fasten them using 2X (PHW067204) screws.
b. Assemble the second set of frame assembly using 2X (PHW067204) screws on other side of the head unit.

a. Release the clamping latch arms (CC01434) on either side of the head unit and adjust channel bars to the correct spacing between T-bars as shown.

a. Once the channel bars are adjusted, bend the ends of all four channel bars based on the distance between T-bars.

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

15

SLOT 1

Installation Instructions – Pendant S1LI/S1LD/S1LID

Safety p.1

Overview

Parts

p.6

p.10

E. Install Head Unit – Grid Ceilings

Set Up Ceiling p.11

Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental

p.13

p.14

p.20

p.27

p.31

Contractor Resources p.32

4

5

Channel Bar

T-Bar

Bend Tab

Input

Wire Tie

Output

a. Fix the channel bars (on either sides of head unit) with T-bars by means of wire ties or screws (provided in the kit) onto T-bars as shown.
b. Secure the head unit in position by closing the clamping latch arm.

a. Remove either one of the knock-outs from both access plates and connect the input and output metal conduits as shown.

NOTE: CONTRACTOR TO RUN MIN.12GA WIRE FROM HEAD UNIT TO SUPPLY CLASS 1 DC POWER TO LUMINAIRE THROUGH CODE COMPLIANT METAL CONDUIT, MAX. 50FT.

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

16

SLOT 1

Safety p.1

Overview

Parts

p.6

p.10

E. Install Head Unit – Hard – Lid

Installation Instructions – Pendant S1LI/S1LD/S1LID

Set Up Ceiling p.11

Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental

p.13

p.14

p.20

p.27

p.31

Contractor Resources p.32

For Surface Mount, Side Entry

1

2

3

Output Input

a. Loosen the screw from the lid on the head unit and swing it to open.

a. Flush the head unit onto the ceiling and secure it to ceiling using 4X screws.
b. Complete the wire harnesses inside the head unit.

a. Use knock-outs of the side access plates to connect input and output metal conduits.
b. Close the lid and fasten it using a screw.

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

17

SLOT 1

Safety p.1

Overview

Parts

p.6

p.10

E. Install Head Unit – Hard – Lid

Installation Instructions – Pendant S1LI/S1LD/S1LID

Set Up Ceiling p.11

Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental

p.13

p.14

p.20

p.27

p.31

Contractor Resources p.32

For Surface Mount, Rear Entry

1

2

3

Input

Output

a. Loosen the screw from the lid on the head unit and swing it to open.

a. Flush the head unit onto the ceiling and secure it to ceiling using 4X screws.
b. Complete the wire harnesses inside the head unit.

a. Use knock-outs of the rear access plates to connect input and output metal conduits.
b. Close the lid and fasten it using a screw.

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

18

SLOT 1

Safety p.1

Overview

Parts

p.6

p.10

E. Install Head Unit – Hard – Lid

Installation Instructions – Pendant S1LI/S1LD/S1LID

Set Up Ceiling p.11

Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental

p.13

p.14

p.20

p.27

p.31

Contractor Resources p.32

For Wall Mount, Side Entry

1

2

3

a. Loosen the screw from the lid on the head unit
and swing it to open.

a. Flush the head unit onto the ceiling and secure it to ceiling using 4X screws.
b. Complete the wire harnesses inside the head unit.

a. Use knock-outs of the side access plates to connect input and output metal conduits.
b. Close the lid and fasten it using a screw.

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

19

SLOT 1

Installation Instructions – Pendant S1LI/S1LD/S1LID

Safety p.1

Overview

Parts

p.6

p.10

Set Up Ceiling p.11

F. Install Fixture – Grid Ceilings (F1)

Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental

p.13

p.14

p.20

p.27

p.31

Contractor Resources p.32

1

Conduit from Head Unit

2

J-box

L=4″ W=4″ D=2.2″

Canopy

T-Bar

3 Cable Retainer

a. At Power Feed Locations: Mount the 4″ x 4″ J-box (recommended as above) above T-grid as shown.
b. Pass the feed cord through the canopy and flush it with T-bar. Make wire connections and thread cable retainer onto the cross-bar screw.
c. Connect the metal conduit from head unit to the J-box.

a. At Non-Power Feed Locations: Assemble grid clips onto grid or caddy bar.
b. Place canopy flush with ceiling tile. Thread cable retainer onto bolt no less than ¼” of the way up.

a. For an Individual (IND): Mount the grip-lock (from the kit) onto the screw provided on the individual luminaire and insert the aircraft cable from ceiling support to the end of IND luminaire.
b. Repeat the same procedure on other side of luminaire as well.

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

20

SLOT 1

Installation Instructions – Pendant S1LI/S1LD/S1LID

Safety p.1

Overview

Parts

p.6

p.10

Set Up Ceiling p.11

F. Install Fixture – Grid Ceilings (F1)

Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental

p.13

p.14

p.20

p.27

p.31

Contractor Resources p.32

4

5

6

Lens Removal Tool

a. To adjust aircraft cable up or down, push down on upper lock cylinder.
b. Once required length is achieved, allow lock cylinder to spring back up. Make sure the lock screw is tightened.
c. Repeat the same on other end of the luminaire. Trim the excess cable length.

a. For a Run: Insert and pivot the flange of lens removal tool (provided in the kit) in the gap between end cap and lens.
b. Detach the lens from the luminaire completely on both sides. Assemble the grip-lock and aircraft cable as mentioned in steps F3 to F4.

a. Assemble the aligner key and light blocker foil (provided in the kit) and slide them (2X) into the DIRECT side of the housing as shown.
b. Place the aligner key dimples to face the outer extrusion. Repeat this step only on LEFT and INT luminaires.

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

21

SLOT 1

Installation Instructions – Pendant S1LI/S1LD/S1LID

Safety p.1

Overview

Parts

p.6

p.10

Set Up Ceiling p.11

F. Install Fixture – Grid Ceilings (F1)

Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental

p.13

p.14

p.20

p.27

p.31

Contractor Resources p.32

7

8

9

Indirect Direct

View A

Hanger Bracket

View A

a. Insert aircraft cable into grip-lock hardware that is attached to hanger bracket. Repeat this step on all INT and RIGHT luminaires.
b. Make electrical connections between the luminaires as shown before the luminaires are completely installed.
c. Slide intermediate luminaire (INT) along hanger bracket keeping aligner key-blocker foil to the channel from opposite luminaire body.

a. Once both the luminaires mate, secure shoulder screws (2X) (provided in the kit) from bottom using allen key provided (from the kit) shown.
b. Ensure that both screws will fasten the joiner bracket from the INT luminaire towards the joiner knuckle from previous luminaire as shown.
c. Repeat the same step for all INT and RIGHT luminaires.

a. Once all the electrical connections are made by a licensed electrical contractor, reinstall the lens of the LEFT-INT-RIGHT luminaires.
b. The lens needs to match up with the unit it was originally in. Gently push the lens into the housing until engaged completely from all sides.
c. Finally, insert feed cord into J-box through bushings and canopy. Complete the harness of feed cord from the luminaire and connect it to its mating connector from the head unit inside the Jbox.

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

22

SLOT 1

Installation Instructions – Pendant S1LI/S1LD/S1LID

Safety p.1

Overview

Parts

p.6

p.10

Set Up Ceiling p.11

F. Install Fixture – Hard Ceilings (F2)

Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental

p.13

p.14

p.20

p.27

p.31

Contractor Resources p.32

1

From Head Unit

2

a. At Power Feed Locations: Install the J-box (by others) into the ceiling.
b. Ensure that the bottom edge is flushed with the ceiling as shown. Connect the metal conduit from head unit to the J-box.

a. Attach a cross-bar to the J-box using 2X #8 screws and fasten it securely onto the J-box.

3

Strain Relief

4′ section uses 2,4 or 6 quick connectors to
connect DC input cord to power cord on luminarie. Match the Conductor color.

a. Insert white 7/8″ bushing on luminaire power cord. Connect matched color wire using wire connectors.
b. Install the insulated crimp strain relief to the feed cord.
c. Pass the luminaire power cord through the canopy. Complete the wiring connections inside the J-box.

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

23

SLOT 1

Installation Instructions – Pendant S1LI/S1LD/S1LID

Safety p.1

Overview

Parts

p.6

p.10

Set Up Ceiling p.11

F. Install Fixture – Hard Ceilings (F2)

Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental

p.13

p.14

p.20

p.27

p.31

Contractor Resources p.32

4

5

6

¼”-20 Screw

a. Connect the coupler to the ¼”-20 screw provided on the cross-bar along with canopy.

a. For an Individual (IND): Mount the grip-lock (from the kit) onto the screw provided on the individual luminaire and insert the aircraft cable from ceiling support to the end of IND luminaire.
b. Repeat the same procedure on other side of luminaire as well.

a. To adjust aircraft cable up or down, push down on upper lock cylinder. Once required length is achieved, allow lock cylinder to spring back up.
b. Make sure the lock screw is tightened. Repeat the same on other end of the luminaire. Trim the excess cable length.

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

24

SLOT 1

Installation Instructions – Pendant S1LI/S1LD/S1LID

Safety p.1

Overview

Parts

p.6

p.10

Set Up Ceiling p.11

F. Install Fixture – Hard Ceilings (F2)

Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental

p.13

p.14

p.20

p.27

p.31

Contractor Resources p.32

7

8

9

Lens Removal Tool

View A

a. For a Run: Insert and pivot the flange of lens removal tool (provided in the kit) in the gap between end cap and lens as shown (repeat this step for all luminaires).
b. Detach the lens from the luminaire completely on both sides. Assemble the grip-lock and aircraft cable as mentioned in steps F3 to F4.

a. Assemble the aligner key and light blocker foil (provided in the kit) and slide them (2X) into the DIRECT side of the housing as shown.
b. Place the aligner key dimples to face the outer extrusion. Repeat this step only on LEFT and INT luminaires.

a. Insert aircraft cable into grip-lock hardware that is attached into hanger bracket. Repeat this step on all INT and RIGHT luminaires.
b. Make electrical connections between the luminaires as shown before the luminaires are completely installed.
c. Slide the intermediate luminaire (INT) along hanger bracket keeping aligner key-blocker foil to the channel from opposite luminaire body.

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

25

SLOT 1

Installation Instructions – Pendant S1LI/S1LD/S1LID

Safety p.1

Overview

Parts

p.6

p.10

Set Up Ceiling p.11

F. Install Fixture – Hard Ceilings (F2)

Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental

p.13

p.14

p.20

p.27

p.31

Contractor Resources p.32

10

11

12

¼-20 Stud
Cable Retainer

3/8″ – 5/8″ Canopy

a. Once both the luminaires mate, secure shoulder screws (2X) (provided in the kit) from bottom using allen key provided (from the kit).
b. Ensure that both screws will fasten the joiner bracket from the INT luminaire towards the joiner knuckle from previous luminaire as shown.
c. Repeat the same step for all INT and RIGHT luminaires.

a. Once all the electrical connections are made by a licensed electrical contractor, reinstall the lens of the LEFT-INT-RIGHT luminaires.
b. The lens needs to match up with the unit it was originally in. Gently push the lens into the housing until engaged completely from all sides.
c. Finally, insert feed cord into J-box through bushings and canopy. Complete the harness of feed cord from the luminaire and connect it to its mating connector from the head unit inside the Jbox.

a. At Non-Feed Locations: Secure ¼-20 stud approximately 3/8″ to 5/8″ below the ceiling. Insert canopy and securely fasten the cable retainer.
b. Repeat the same procedure on other side of luminaire as well.

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

26

SLOT 1

Installation Instructions – Pendant S1LI/S1LD/S1LID

Safety p.1

Overview

Parts

p.6

p.10

Set Up Ceiling p.11

G. Electrical Connection – Head Unit to Fixture

Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental

p.13

p.14

p.20

p.27

p.31

All power connections should be installed according to local/national codes by a Certified Electrician.

Contractor Resources p.32

All 4 WIRES FROM THE HARNESS MUST BE CONNECTED; ALL FIXTURES REQUIRE POWER AND CONTROL SIGNAL WIRES.

J-box

*Older versions of fixture cord have Black, White, Purple, and Gray conductors. Connect according to detail on right.
Electrical Connections:
a. Secure electrical connections to the fixture per wiring chart on this page, and in accordance with local/national code.
b. Secure wiring access plate back to fixture when completed.
NOTE: Provided flex cord is not plenum rated, cord will need to be ran with flexible or rigid conduit at time of install.

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

27

SLOT 1

Installation Instructions – Pendant S1LI/S1LD/S1LID

Safety p.1

Overview

Parts

p.6

p.10

Set Up Ceiling p.11

G. Electrical Connection – Head Unit to Fixture

Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental

p.13

p.14

p.20

p.27

p.31

All power connections should be installed according to local/national codes by a Certified Electrician.

Contractor Resources p.32

Wiring Compartment Detail

NOTE: Provided Flex cord is not plenum rated, cord will need to be ran with Flexible or Rigid conduit at time of install.

A Must connect to luminaires for all input control types! Modulus control lines are polarityinsensitive. Use 12AWG solid wire in grounded conduit for remote placement of head unit up to 50ft away from fixture canopy.
B Line voltage should match ordered voltage option (120/277/MVOLT or 347V). See next pages for emergency power input wiring diagrams. Separate the luminaire disconnect before servicing. Luminaire disconnects may not be present on units build before Fall 2021.
C Purple/gray will control direct lights, first zone or intensity (for tunable white), blue/blue-white will control indirect light, second zone, or CCT (for tunable white). Cap blue/blue-white if second channel is unused.
D DALI lines are polarity insensitive. Customer to supply DALI power supply external to head unit.
E Connect Cat5 to integral nIO on outside wall of head unit.
F Screw external antenna onto coax connector on outside wall of head unit after installation.
G Eco System lines are polarity-insensitive.
H For Chicago Plenum (CP) applications, a cat5 splitter is located inside the Modulus outputs connection area. Installer should pull the splitter through the access plate opening, make cat5 connections, then push the connector back into the wiring compartment before replacing access plates. All connections should be made through the gasketed side access plates for CP head units – do not remove the top cover, which is factory sealed with aluminum tape. Replace tape if removed.

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

28

SLOT 1

Installation Instructions – Pendant S1LI/S1LD/S1LID

Safety p.1

Overview

Parts

p.6

p.10

Set Up Ceiling p.11

Prep Fixtures p.13

G. Electrical Connection – Emergency Circuit (EC)

Install Head Unit Install Fixture Electrical Connections Supplemental

p.14

p.20

p.27

p.31

All power connections should be installed according to local/national codes by a Certified Electrician.

Contractor Resources p.32

EC System Wiring Diagram

Wiring Compartment Detail

a. Luminaire disconnects will be added to all head unit power input wires beginning Fall 2021 ­ head units produced prior to then may not have disconnects.

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

29

SLOT 1

Installation Instructions – Pendant S1LI/S1LD/S1LID

Safety p.1

Overview

Parts

p.6

p.10

Set Up Ceiling p.11

G. Electrical Connection – Microinverter (E35INV)

Prep Fixtures p.13

Install Head Unit Install Fixture Electrical Connections Supplemental

p.14

p.20

p.27

p.31

All power connections should be installed according to local/national codes by a Certified Electrician.

Contractor Resources p.32

E35INV System Wiring Diagram

Wiring Compartment Detail

a. Ships with E35INV head unit for field installation. Includes 3ft whip but can be installed up to 250ft away with Class 1 wires run through additional conduit (not included) in accordance with local code.
b. Ensure that Inverter Output Voltage Selector Switch always set to 277VAC Out (the left-most switch position) before connecting normal power, regardless of normal power voltage.

a. 120-277V, unswitched. Make normal power connections to 18AWG solid copper flying leads in accordance with local code.
b. Luminaire disconnects will be added to all head unit power input wires beginning Fall 2021 ­ head units produced prior to then may not have disconnects.
c. Mount test switch remotely (optional) or cap red/black and white/red wires if not in use.

NOTE: Short unit connector lines after installation is complete. NOTE: Ensure that voltage selector switch on output side of IIS-35-HE is set to 277V REGARDLESS of input voltage.

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

30

SLOT 1

Safety p.1

Overview

Parts

p.6

p.10

H. Supplemental – NLTAIR2

Installation Instructions – Pendant S1LI/S1LD/S1LID

Set Up Ceiling p.11

Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental

p.13

p.14

p.20

p.27

p.31

Contractor Resources p.32

Typical Installation For Rio External Antenna

Antenna (packaged with fixture)
NLTAIR2 Antenna (*274X9N)

Antenna Large Locking Nut
Antenna Small Ring
Antenna Gasket

RIO External Antenna
Head Unit With RIO External Antenna Installed
a. Open the top cover of the head unit. b. Find antenna taped inside the enclosure. c. Attach RIO external antenna to the brass SMA connector.

Antenna Locking Nut

Coax Base

Antenna
NOTE: If antenna is lost, replacement part # for it is *274X9N.

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

31

SLOT 1

Safety p.1

Overview

Parts

p.6

p.10

I. Contractor’s Resources

Installation Instructions – Pendant S1LI/S1LD/S1LID

Set Up Ceiling p.11

Prep Fixtures Install Head Unit Install Fixture Electrical Connections Supplemental

p.13

p.14

p.20

p.27

p.31

Contractor Resources p.32

Check out helpful programs, tools, installation videos and more.

marklighting.com I 800-705-SERV (7378) I [email protected] I © 2021 AcuityBrands Lighting, Inc. All Rights Reserved. We reserve the right to change design, materials and finish in any way that will not alter installed appearance or reduce function and performance.

912-00307-002 10/25, Rev A

32

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

SLOT 1 User Manuals

Related Manuals