Villa Barcelona LOWMRTG537SAMP Engineered Tongue and Groove Hardwood Flooring Instruction Manual
- June 10, 2024
- Villa Barcelona
Table of Contents
- Villa Barcelona LOWMRTG537SAMP Engineered Tongue and Groove Hardwood
- Product Information
- Usage Instructions
- Installation Instructions
- WOOD/CONCRETE SUBFLOOR REQUIREMENTS
- Glue Down Installation Method
- FLOATING FLOOR INSTRUCTIONS
- Care and Maintenance
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
Villa Barcelona LOWMRTG537SAMP Engineered Tongue and Groove Hardwood
Flooring
Product Information
The Villa Barcelona Engineered Tongue & Groove Hardwood Flooring is a versatile flooring option that can be applied on every level of the home. It can be installed through staple-down, glue-down, or edge-glue and float methods. The flooring is fully compatible with wood subfloors and concrete subfloors, and can even be applied over in-floor radiant heat.
Usage Instructions
Before installation, the owner/installer should perform a pre-install inspection by examining the planks from up to two boxes of the product. If the products are defective or questionable, contact the retailer. Otherwise, proceed with installation.
When installing the flooring, ensure that the use of correct sized fasteners and adaptors is followed. When nailing, use specially designed engineered wood pneumatic flooring staplers or cleat nailers. For glue-down installations, follow the glue manufacturer’s instructions regarding correct trowel size, removal of surface sealers or contaminants, and use of moisture barriers.
The moisture testing process is important to ensure the longevity of the flooring. For concrete subfloors, vapor emission should not exceed 3lbs per 1000sf as measured using a calcium chloride test or 75% RH when using an in- situ RH (Relative Humidity). For wood subfloors, moisture should not exceed 12%. For concrete subfloors, it must be cured for at least 60 days and tested for moisture using a Calcium Chloride test (ASTM F 1869) or Relative Humidity In-Situ Probe test (ASTM F 2170). A moisture barrier is required over all concrete subfloors.
It is recommended that the owner is present during installation for consultation and direction. The owner and installer should discuss installation and layout to maximize satisfaction. Installers should be familiar with installation guidelines from National Wood Flooring Association.
Note that the owner/installer assumes all responsibility for product quality
of the completed installation. Installations outside the provided guidelines
are viewed as experimental.
For technical support, call
800-758-9580.
Installation Instructions
Engineered Tongue & Groove Hardwood Flooring
Document ID#: VBHF022123_ENGT&G
Staple-down, Glue-down, or Edge-glue and Float
FOR TECHNICAL SUPPORT, PLEASE CALL
800-758-9580
OWNER/INSTALLER RESPONSIBILITY
The owner is advised to be at home during the installation for
consultation/direction. The owner and installer should discuss installation
and layout to maximize satisfaction. If this is not possible, consultation
should be done prior to installation. Installers should be familiar with
installation guidelines from National Wood Flooring Association
(woodfloors.org).
The owner/installer assumes all responsibility for product quality of
completed installation.
PERFORM PRE-INSTALL INSPECTION. FOR CLAIMS PURPOSES, YOU ARE ALLOWED TO OPEN
UP TO 2 BOXES FOR PRODUCT INSPECTION. DO NOT OPEN ALL THE BOXES. OPENING ALL
THE BOXES CONSTITUTES YOUR ACCEPTANCE OF THE PRODUCT. INSPECT ALL THE PLANKS
IN THESE 4 BOXES CAREFULLY. EXAMINE FLOORING FOR COLOR, FINISH AND QUALITY. IF
YOU DISCOVER THAT PRODUCTS ARE DEFECTIVE, OR IF MATERIAL IS QUESTIONABLE, YOU
SHOULD CONTACT THE RETAILER. IF YOU ARE SATISFIED, PROCEED WITH INSTALLATION.
The hardwood veneer is a product of nature, thus there will be some variations
in grain, patterns, and shade/color from box to box. When ordering flooring 5%
– 7% more flooring must be added to allow for cutting and grading allowances.
For diagonal installations add 15% more for waste.
-
Before installation inspect the flooring for any manufactured defects. Defects on the face of the planks can be avoided by trimming the plank, and the remainder of the plank used, this is expected to minimize waste. Any board deemed unacceptable should simply not be used. If there are concerns with the quality of the product, please stop installation and contact your local retailer.
-
Before installation the installer must determine if the environment and subfloor conditions meet or exceed all
applicable standards, and are within the tolerances set in these installation guidelines. The manufacture declines any responsibility for failures caused by improper job site and subfloor conditions. -
Once the boxes are brought into the home check the box labels to verify vender information matches.
-
Save a box label which has the product information for future reference.
-
It is acceptable to touch up flooring during and after installation with stain, filler, or putty.
-
After installation it is the homeowner’s responsibility to make sure the proper indoor environment is maintained. Failure to do so can result in gapping, squeaking, buckling, or cupping.
APPLICATIONS Float/Glue/Staple
Engineered flooring is our most versatile flooring and can be applied on every
level of the home. When nailing, engineered flooring is typically installed
using specially designed engineered wood pneumatic flooring staplers or cleat
nailers, both types can work. Ensure the use of correct sized fasteners and
adaptors. Engineered Flooring can be fully-glued to wood subfloors and
concrete. Follow the glue manufactures labeling instructions regarding correct
trowel size, removal of surface sealers or contaminates and use of moisture
barriers. Engineered Flooring can also be edge-glued and floated over a dense
pad underlayment to meet the needs of customers, building specifiers and
condominium associations desiring a quieter and warmer floor (see underlayment
section) and some floors can be applied over in-floor radiant heat. Specific
details are outlined in this document; installations outside these guidelines
are viewed as experimental.
JOBSITE CONDITIONS:
- The building should be enclosed with all doors and windows in place.
- All wet work which includes painting, drywall, tiling, concrete, and masonry should be completed with ample time to dry before flooring is delivered.
- Crawlspaces, basements, and garages should be dry and well ventilated.
- Crawlspaces must be a minimum 18” from the bottom of the floor joist to the ground. Crawlspaces must have a minimum 6 mil thick polyethylene film covering the entire crawlspace ground. Crawlspaces should have proper ventilation as determined by local building codes.
- All gutters should be in place and functioning properly. Yard grading should be sloped to run water away from home foundation.
- HVAC systems should be operational for at least two weeks prior to flooring being delivered.
ACCLIMATION/MOISTURE TESTING:
-
After purchase / delivery the flooring must be stored inside the home, and allowed to acclimate in the rooms, where it will be installed. Flooring is typically ready to install the day it arrives as long as normal living conditions are present.(60-80 degrees and 30% -50% relative humidity, otherwise acclimate as long as necessary for the environment.
-
For best results the rooms should be maintained between 60F – 80F, with a humidity range between 30% to 50%.
-
Use a reliable species specific moisture meter to verify the moisture of the floors veneer. Follow the moisture meters manufactures guidelines for this step.
-
STEP 1: Test the flooring moisture content. Test at least 40 planks per 1000 sqft of flooring, using the meter manufacturers
recommended setting for engineered flooring. Calculate the average moisture content of all 40 readings. -
STEP 2: Check the wood subfloor moisture. Set the meter to the recommended setting for that specific type of subfloor. Check with the meter manufacture for specific settings. Test 20 different locations per 1000sqft area, and calculate the average moisture content. The wood subfloor should not exceed 12% in moisture. Skip this step if you have a concrete subfloor.
-
STEP 3: WOOD SUBFLOOR: It’s recommended for installation to begin when the hardwood flooring moisture content is within 4% of the average wood subfloor moisture content. Flooring should not exceed 12% moisture content. Extend acclimation time until these conditions are met. Document and Save your moisture testing results.
-
CONCRETE SUBFLOOR: It’s recommended that vapor emission not exceed 3lbs per 1000sf as measured using a calcium chloride test or 75% RH when using an in-situ RH (RH=Relative Humidity). It is recommended to use an adhesive with a vapor retarder or an adhesive system that incorporates a vapor retarder.
WOOD/CONCRETE SUBFLOOR REQUIREMENTS
Approved Wood subfloors
Note that joist spacing determines minimum subfloor thickness.
-
Joist spacing 16” on center (OC) Plywood: Minimum of (5/8˝) Oriented Strand Board (OSB): Minimum (3/4˝, 23/32”).
-
Joist spacing 16” up to 19.2” (OC) Plywood: Minimum of (3/4˝, 23/32”) Oriented Strand Board (OSB): Minimum of (3/4˝, 23/32”).
-
Joist spacing over 19.2”up to maximum 24” (OC) Plywood: Minimum of (7/8”) Oriented Strand Board (OSB): Minimum of (1”).
-
Do not install flooring directly over floor joist without subflooring. All structural panels/underlayment must be installed sealed-side down, and provide minimum ¾” perimeter spacing. Square-edged or non-tongue and grooved panels used as a subfloor will require a minimum 1/8˝ (3 mm) expansion space placed between all plywood seams. Panels must meet minimum CDX grade Exposure 1 and US Voluntary Product Standard PS1-95, PS2-04 or Canadian performance standard CAN/CSA 0325-0-92 for construction sheathing. Check panel for codes.
-
Pressure-treated plywood may have elevated moisture or latent with rot resistant chemicals, not for interior use.
-
Solid-board subflooring should be ¾” x 5 1/2” (1” x 6” nominal), Group 1 dense softwoods, No. 2 Common, kiln-dried to less
than 12% percent moisture content. Add min. 3/8” plywood over solid board subfloors. -
Particleboard, Luan or Masonite is approved for floating installations only and must be covered with a minimum of 3/8˝CDX plywood when gluing this product to the subfloor.
-
Do not install over existing plywood subfloors that are directly installed over concrete without proper moisture
protection between the plywood and the concrete. -
Nail wood flooring perpendicular to the floor joist.
-
Nailing wood flooring parallel to the floor joist is an option using a combination of plywood, OSB, Advantech or similar approved subfloors. Floor joist (16” to 19.2 oc) The total subfloor thickness minimum must be 1-1/4”.
Floor joist greater than (19.2 up to 24”oc) The total subfloor thickness minimum must be 1-7/16”. -
CLEAN: All wood and concrete subfloors must be swept clean or vacuumed to remove dust and debris. For glue down installations remove all contaminates like paint, old adhesives, sealers, and dry wall mud that could affect the adhesive bond.
-
FLAT: All wood and concrete subfloors must be flat within 1/8” over a 6’ span, or 3/16” over a 10’ span. All areas of the subfloor must be check prior to installation. High spots can be sanded or grinded down and low spots fill with appropriate patching compounds. Never sand and grind materials covered with lead paint, or containing asbestos. Follow local building codes for proper removal practices of asbestos and lead paints.
-
DRY: Wood subfloors should be dry. The moisture in wood subfloors should not exceed 12%. If high moisture is present stop installation until the moisture source has been corrected.
Concrete subfloors must be fully cured for at least 60 days. Concrete subfloors must be tested for moisture by conducting a Calcium Chloride test (ASTM F 1869) or Relative Humidity In-Situ Probe test (ASTM F 2170). Calcium Chloride test results cannot exceed 3lbs per 1000sqft in 24hrs. Relative Humidity In-Situ probe test should not exceed 75%. A moisture barrier is required over all concrete subfloors.
GENERAL INFORMATION (all installations)
- Install flooring in normal proper lighting.
- Save a box of flooring for future repairs.
- Do not install in full bathrooms or areas with steam.
- Inspect subfloor for flatness, squeaks, and moisture.
- Avoid board grouping, board sizes should be intermingled.
- Use breathable materials like paper when protecting a newly installed floor.
- Inspect flooring during installation, select out boards have milling and finish defects.
- The customer is advised to be home during the installation for consultation/direction.
- Customer and installer should discuss installation and layout to maximize satisfaction.
- It is helpful to save the item number found on the packaging box ends for future references.
- Jobsite subfloors can be dry today and wet tomorrow the use of moisture barriers is highly recommended.
- Floor should be installed from several cartons at the same time to ensure good color, shade and appearance.
- Do not install flooring under permanent or fixed cabinetry(should the cabinetry or flooring need to be removed in the future).
- An Expansion space must be left around the perimeter and at all vertical obstructions.
- Pencil
- Chalk line
- 6’ level or 10’ level
- Miter saw
- Table saw
- 60 tooth carbide tip saw blades
- Broom
- Jamb saw
- Eye protection
- Dust Mask
- Gloves
- Engineered Floor Stapler
- Floor fasteners
- Hygrometer (test home temperature and humidity)
- Blue painters tape (2080)
- PVA wood glue
- Air Compressor with regulator
- Air hose
- Drill bit set
- Hammer
- Tape measure
- Moisture meter (wood)
- Calcium chloride moisture test (concrete)
- Approved adhesive remover (glue down installs)
- Cloth rags
- Nail set
- Drill
- 6d finish nails
- Jig saw
- Ear protection
STAPLE DOWN OVERVIEW
[NAILING TIPS]:
- Test nailing a couple of planks in a well lit area, near a window.
- Place fasteners on tongue side that runs the length of the planks. Do not place fasteners into the groove.
- If the staples do not go in far enough raise the air pressure on the compressor up slightly and re-test until staples sit flush into the wood above the tongue.
- If the staples go in too deep lower air pressure until staples sit flush above the tongue. Some floor staplers have the ability to adjust the depth of the fastener. This may need to be adjusted for the staples to seat correctly.
- Tongue fractures can be reduced by lowering the compressor’s PSI and using the recommended floor stapler.
- Dimples can be reduced by seating the floor staplers correctly on the board or using thinner gauge fasteners like 20 gauge staples. Make sure the staples are sitting flush in the wood or dimples can occur. Adjusting the depth of the stapler to seat fasteners a bit deeper can help minimize dimples.
- Only use pneumatic nail guns designed for engineered wood flooring. Norge 4 n 1 floor stapler, Stanley Bostich, Powernail, and similar engineered flooring staplers are acceptable.
- Check for squeaks after nailing. Squeaks can occur due to tongue fracture, uneven subfloor, improper fasteners, or improper fastener spacing. Squeaks can be corrected or minimized by adding a PVA floating floor wood glue to the tongue and groove of the plank before nailing.
- If stapler will not shoot staples, check for air leaks, jammed staples, staple size, and compressor air pressure.
- Its best to pre-drill and hand nail the first row using a 3/32” drill bit and 6d finish nail. This will help prevent finish chipping due to pneumatic finish or brad nailers.
- If dimpling still occurs switch to a floating or glue down installation. We do not recommend the use of water base adhesives.
ENGINEERED WOOD RECOMMENDED FASTENER SELECTION
3/8’’, 1/2”, 9/16”| 18 , 19, or 20 gauge engineered flooring staples| 1-1/4”
or 1 -1/2” long
---|---|---
FASTENER SPACING
Spacing of fasteners should be as follows – Staples should be placed every 3″
– 4″ and cleats should be placed every 4″ – 6″.
All fasteners should be placed within 1″ -2″ of end joints.
1/2″ crown – 15 1/2-gauge staples typically used for solid wood flooring
should not be used as they may damage the flooring.
Important: Set air compressor to 70-80 PSI. Test and adjust air pressure to
ensure proper setting of fasteners. Make sure that the fastening machine is
fully adjustable, is in good working condition, is at the appropriate angle
and seats properly against the tongue of the board to prevent top edge and
surface dimple damage.
Note : Only use flooring stapler that are fully adjustable and that
engage the top profile over the tongue at the appropriate angle. Make sure
that the flooring stapler is in good working condition and seats properly
against the board to prevent top edge and surface dimple damage. Any damage
caused by fasteners or nailers is not covered by the warranty.
For products over 5” in width use the glue assist method when using the
nail/staple down method. Refer to the NWFA Technical Manual – Section V. for
complete details.
NAILDOWN INSTRUCTIONS
[CAUTION]: Nail flooring in good lighting. After nailing 100 sq ft, stop and
inspect the installed floor for any defects or damages. Stop at 20 sqft for
installation under 100sqft. Make adjustments as needed. If satisfied, continue
with the installation. When top nailing pre-finished flooring (the first and
last rows, stair treads, and risers) it is recommended to pre-drill and hand
nail using a 3/32” drill bit and 6d finish nails. Pneumatic 16ga. finish nail
or 18ga. brad nail guns can be used to secure the first and last rows, but
improper use can easily damage the board or finishes. When installing over
crawl spaces, basements, or garages use an asphalt saturated paper as a
minimum to provide protection against moisture vapors.
INSTALLATION PREP
Use a manual or electric jamb saw to undercut all door jambs/casing to allow
enough clearance for the wood flooring to easily slide underneath. A credit
card thick gap between the top of the wood flooring and bottom of the door
jamb is acceptable. Sand down high areas of the subfloor. Correct low areas
(See subfloor prep). Sweep or vacuum the subfloor clean of dust and debris.
Install moisture retardant underlayment, and staple it down to prevent
movement/sliding(See underlayments).
-
STEP 1: THE FIRST THREE ROWS
- Determine the starting wall, usually the longest or outside foundation wall. At the two opposite ends of this wall, measure out the width of the board including the tongue, plus the expansion space, and place a mark. An expansion gap must be left around the perimeter and at all vertical obstructions. This gap will be the same as the thickness of the new flooring. For example; 1/2” flooring requires 1/2” expansion gap.
- Snap a chalk line connecting the two marks. Align the tongue side of the first row of boards on the chalk line with the groove side towards the starting wall, maintain the expansion space.
- Install the flooring with the tongue side facing away from the starting wall(Use long straight planks for first two rows).
- Pre-drill and top nail the first row of boards using a 3/32” drill bit and 6d finishing nails about an 1” from the back edge. Pneumatic finish nail guns or brad nail guns can also be used. If hand nailing countersink the finish nail using a nail punch and fill with close matching wood filler. Blind nail the 2nd and 3rd rows using the flooring stapler, and seat the staples slightly above the tongue.
-
STEP 2: LOOSE LAY (Rack) THE FLOORING
After installation of the first three rows, loose lay about 100sqft of flooring about 4” or 5” away from the last secured row. Pull from several boxes to mix board color and sizes to create a random look. Visually inspect flooring for defects while racking. Stagger boards randomly as possible, avoid creating patterns. See picture for proper layout guidance.
-
STEP 3: INSTALLATION CONTINUED
- After racking out 100sqft of flooring begin nailing the floor. (See fastener recommendations). Visually inspect boards for defects while nailing. Use proper fastener spacing (See fastener spacing). Continue nailing until you get to the last one or two rows. The lasts one or two rows will have to be top nailed. Again pre-drill using a 3/32” drill bit and 6d finishing nails.
- The last rows can be pulled tightly together using a floor Jack or pry bar. Protect base boards before using these tools.
- The last row may have to be ripped down in width to fit. If the last row is less than 1” in width use a PVA carpenters wood glue to join the last piece to the previous row.
-
STEP 4: FINISHING UP
- Fill in nail holes and minor gaps with close matching wood filler.
- Install any base board molding and shoe molding.
- Install transition moldings.
- Sweep the floor.
- Clean floor with approved cleaner (contact you’re flooring retailer for approved cleaner).
- Use felt pads under furniture legs. Protect floor before moving appliances and heavy furniture.
Glue Down Installation Method
When gluing down the flooring, install the flooring the same way as you would
using the floating installation method. The only difference is that adhesive
will be trowel applied to the subfloor, and the flooring will be laid into the
adhesive bonding it to the subfloor. Always check the adhesive manufactures
guidelines on proper subfloor prep, moisture testing, approved substrates,
trowel sizes, cure times, and coverage. A moisture barrier is required over
all concrete subfloors. It is strongly advised to use moisture barriers that
offer 100% moisture protection over concrete.
Recommended Adhesives: Use 100% urethane adhesives that are designed for use
with engineered wood floors. Technical Data Sheets for these adhesive can be
found on the adhesive manufactures website. Technical data sheets provide the
guidelines for approved subfloors, approved floors, subfloor prep, cure times,
and trowel sizes among other information.
Expansion Space: A minimum 1/2” expansion space is required around all fixed
objects and walls. T-molding expansion breaks are not required with glue down
installation methods, but can be helpful in minimizing overall floor movement
due to seasonal humidity changes inside the home.
Glue down Install: Start the installation parallel to the longest exterior
wall in the room. Spread out only enough adhesive to install the first row of
flooring leaving a min. 1/2” expansion gap at all walls. A laser level or
string line can be used to make sure the first row is straight. Allow the
first row to set up before installing additional rows. This helps prevent the
first row from moving as the next rows are installed. Spread out enough
adhesive to install 4 rows at a time. Planks must be wet laid into the
adhesive. Discard badly bowed or warped planks. Periodically lift up a plank
to verify proper adhesive coverage to the subfloor and bottom of the plank.
After laying 4 rows clean up any glue that gets on the finish right away using
the adhesive manufactures recommended adhesive remover. Use #2080 blue
painters tape to hold planks together if needed until the adhesive cures.
Don’t leave tape on for more than 24hrs. Wait 24hrs before placing furniture
back onto the flooring.
FLOATING FLOOR INSTRUCTIONS
During installation, Carpenters PVA Floating Floor Wood adhesive should be applied to each groove on the short and long sides of the planks to ensure bond with the other planks. Two separate continuous beads of glue should be applied: one continuous bead applied inside the groove, and one continuous bead applied to the top part of the tongue at all seams to ensure a secure bond with the top and bottom of the tongue. This double-gluing helps to minimize squeaks, board gaps, or separation. Note that seasonal gapping is normal in wood flooring and does not constitute a product failure. Seasonal gapping can be minimized by keeping the indoor humidity above 30%.
Floating Installation Method:
Underlayments should be approved for wood and concrete subfloors
installations. Caution before installing over concrete a minimum 6 mil
polyethylene sheeting moisture barrier must be installed prior to installing
the underlayment pad to help protect the flooring from excessive moisture.
Expansion Space/T-molding Breaks: An expansion break is required to break
continuous runs exceeding 40’ in width and 40’ in length.
T-molding transitions are used to filled in the gap required for expansion
breaks. A 3/4” gap is required at all walls and fix objects. Installations
fewer than 30’ in length or width can use a ½” gap at all walls and fixed
objects. For room dimensions of greater than 40’ in length or width, the
flooring should be glued down using an approved adhesive.
Installation:
-
Determine the starting wall, usually the longest or outside foundation wall. At the two opposite ends of this wall, measure out the width of the board, and place a mark. (Do not include the tongue of the board when measuring). An Expansion gap or space must be left around the perimeter and at all vertical obstructions.
-
Snap a chalk line connecting the two marks. Tack down fern strips or carpet tack strips along the chalk line.
-
Install the first row of flooring against the tacked wood strips.
-
The flooring should be installed from left to right, tongue side towards the wall, with the groove side facing out from the wall.
-
Install the first row end to end until the entire row is complete. Be sure to use PVA carpenters wood glue on all plank butt ends.
-
When edge-gluing, ensure that the glue is still wet when the planks are joined. Special attention should be paid to ensure that there is no excess glue dripping to the subfloor as this could bond the plank to the underlayment and hamper floor movement. A lightly water dampened rag can also be used to remove any PVA glue.
-
Next, install the second row of planks, installing left to right. Each plank should be installed long side first into the previous row. Make sure carpenters PVA wood glue is applied to all tongue and groove seams. Insert a spacer at the wall, then install the long side of the plank into the previous row. Once the tongue is inserted into the groove fold the plank down onto the subfloor. The butt ends will be lightly tapped over from right to left to close the end seams. Be sure to keep a minimum stagger of 6” between end seams from row to row. Use a pry bar to close the end seam of the last plank installed in each row.
-
After installing 4 or 5 rows apply #2080 blue painters tape to the plank surface perpendicular to the installed floor. This is used to hold the planks together until the glue cures(incorrect tape can damage the finish).
-
Continue installing the flooring until you reach the opposite wall in the room. The last row of flooring by the wall may need to be ripped down to fit. Make sure you have proper expansion space between the last installed row and the wall.
-
Go back to the first row of flooring, remove the fern strip or tack strip and insert the final row of flooring to complete the room installation. Make sure proper expansion is left between the floor and wall.
-
Remove the blue painters tape after 8 to 10hrs.
-
To pass obstacles through the floor covering(pipes, radiator mounts), use a pencil to trace the center position for drilling. Use a big enough drill bit to leave a ½” expansion around the pipe. A jig saw may be needed for bigger rounded cuts. Next, cut the strip in two so that the saw mark goes through the center of the drilled hole, so that the strip can be glued and reassembled around the pipe.
Post-installation
- After installation, allow glue to fully cure for 24 hrs before replacing furniture and heavy foot traffic.
- Protect flooring before moving any heavy furniture or appliances(damages from furniture and appliances are not covered).
- Fill in minor gaps with close matching wood filler.
- Check for adhesive on floor finish and remove with appropriate adhesive manufacture remover.
- For best matching of sheen or milling save a box of flooring for future repairs.
- Clean floor with an approved floor cleaner.
Radiant Heat Systems
- The radiant heat system must have been tested and in operation for a few weeks prior to installation.
- The radiant heating system needs to be turned off prior to installation and the floor needs to be close to room temperature 65 to 75 degrees. If the radiant heat pipes are visible or exposed in the subfloor, you must cover them with 3/8” plywood to spread heat more evenly.
- After the flooring is installed, slowly raise the temperature to the preferred comfort level (over at least a 5 day timeframe) beginning two days after installation or at the onset of colder weather conditions.
- The radiant heat system must be controlled and the surface temperature of the flooring must never be allowed to exceed 85°F.
- Proper relative humidity must be maintained within your home at all times during the year. For best results and to minimize seasonal gaps keep indoor humidity between 30% to 50% RH. If you are in an arid part of the USA or Canada, it is especially imperative that you use a humidifying system to maintain this moisture in the air.
- Forced air heating system also can dry out the air inside your house much more than you might imagine, so use of a Relative Humidity meter (Hygrometer) is recommended to ensure you know when you must use a humidifier to keep the relative humidity above 30%.
- Even when these guidelines are followed it is still possible that your flooring may experience some cracks (seasonal checking) on the plank surface and/or gapping between planks due to slight shrinkage, which are not covered by the products limited warranty.
MOLDINGS & TRANSITIONS:
Install transition moldings directly to the subflooring. Pre-drill and hand
nail transitions moldings to wood subfloors using 6d finishing nails,
pneumatic finish nailers, or pneumatic brad nailers. Use a wood urethane tube
adhesive to bond wood transitions to concrete. Cut moldings using a electric
miter saw using a 60 tooth or 80 tooth fine finish carbide tipped blade makes
the best cuts. Attach base or quarter round moldings to the wall, never into
the floor. Mitered cuts hide better when joining moldings.
- Base Board – for hiding imperfections and adding a custom finish along any wall.
- Quarter-Round – for covering the expansion left at walls and other fixed surfaces.
- Reducer Moldings – used to transition to lower floors.
- Stair Nosing – for finishing the exposed edges of stairs and landings.
- T-Expansion – for joining two areas of flooring of similar heights.
- End Cap – for finishing the space at sliding glass doors, at bath tubs or transitioning to carpet.
Routine Care/Protection Care
- Use an approved cleaner.
- Apply mineral spirits on a cloth to help remove oil, paint, markers, lipstick, ink, or tar. Then buff with dry cloth.
- Only use vacuums designed for hard surface floors.
- Do not use wet mops, steam cleaners, oils, polishes, waxes on the floor.
- Do not use buffing or polishing machines.
- Remove hardened candle wax and chewing gum with ice, then gently scrape with a plastic scraper, such as a credit card.
- Repair white scratches with stain markers. Dents and chips can be concealed with wood putty, wax crayons, or wood epoxy sticks.
- Maintain home climate between 60F and 80F with humidity between 30% to 50% year round.
- UV light can cause wood to lighten or darken overtime. Periodically rearranging your area rugs and furniture will allow the floor to antique or age evenly.
Protection
- Use mats at entrance doors to collect dirt, grit, and wet shoes.
- Only use breathable rugs and rug pads that are safe for hardwood floors. Verify with rug manufacture. Do not use PVC, petroleum or solvent based backings.
- Use floor protectors and wide-load bearing leg bases for heavy object like fish tanks, pool tables, and pianos.
- Do not walk on your floor with stiletto heels, shoes with sports cleats or exposed metal parts.
- Keep pet nails trimmed to prevent scratching the floor.
- Use protection when moving heavy furniture or appliances. Never try to slide or roll heavy objects across the floor.
- Felt pads should be used under chair legs. Use soft rubber castors or felt castors on office chairs.
Care and Maintenance
Daily Maintenance
-
Sweep dust mop or vacuum your floor regularly to remove any particles that could cause abrasion or scratch your floor. CAUTION: Vacuums with a beater bar or power rotary brush head can damage a floor and should never be used.
-
Apply appropriate cleaning solution to the cleaning cloth / mop. Use a cleaner specifically manufactured for hardwood flooring. Do Not Use Water or Vinegar. Do NOT apply directly to the floor.
- For tougher spots, use a higher concentration of isopropyl alcohol and distilled water.
- For extreme cases, a solution of nail polish remover (acetone) and distilled water can be used.
HINT: For best results, clean the floor in the same direction of the planks. When the cleaning cloth/mop becomes soiled, rinse or replace it with a clean one. Following up with a clean, dry cloth will remove residual streak marks and spots.
-
Do NOT leave any amount of liquids (water, juice, soft drinks, spills, etc.) on the floor. Clean any wet spots immediately.
-
Do NOT use a steam cleaner.
-
Do NOT use a wet mop or douse floor with water or liquid cleaners. Liquid can seep between the cracks and cause moisture damage.
-
Do NOT use any cleaning agents containing wax, oil or polish. Left over residue will form a dull film.
-
Do NOT use steel wool or scouring powder which will scratch the floor.
Branded or Off-the-shelf Floor Care Products
If none of the above are effective and you choose to use a store bought
product, test the product in a non-conspicuous area (i.e., closet, corner, or
scrap pieces) for potential adverse side effects.
Preventative Maintenance
- Protect your floor when using a dolly for moving furniture or appliances. Protective sheets and/or plywood may be needed. Never slide or roll heavy furniture or appliances across the floor.
- Place protective pads beneath furniture legs and other heavy objects.
- Avoid excessive exposure to water from being tracked in during periods of inclement weather.
- Minimize abrasive material and dirt by placing mats on both sides of exterior doors and by using area rugs in high-traffic areas.
- Rearrange furniture and rugs periodically to avoid uneven color and shade changes from light exposure.
- Use protective mats beneath rolling chairs and keep furniture casters clean.
- Keep pets’ nails trimmed.
- Remove shoes with cleats, spikes or exceptionally pointy heels before walking on the floor.
Climate Maintenance
- Care should be taken to control humidity levels within the 30% – 50% range. Hardwood flooring can be affected by varying levels of humidity.
- Dry Climates: A humidifier is recommended to maintain humidity levels. Wood stoves and electric heat tend to create very dry conditions during the winter months this also will cause shrinkage in flooring.
- Humid, Wet Climates: By using an air conditioner, heater, or dehumidifier proper humidity levels can be maintained to prevent excessive expansion due to high moisture content.
Floor Repair
- Very light and small surface scratches can be repaired with a staining “touch up” pen of the appropriate color.
- Slightly deeper scratches can be repaired by means of colored putty and or stains. Fill the scratches with the putty. Level with putty knife. Wipe off excess putty.
- Very deep scratches may require the replacement of the planks
FOR TECHNICAL SUPPORT, PLEASE CALL 800-758-9580
References
- You are being redirected...
- LL Flooring (Formerly Lumber Liquidators) | Vinyl, Hardwood, Laminate, Hybrid Resilient, Tile & Flooring Accessories
- Black Kraft Paper | LL Flooring (formerly Lumber Liquidators)
- Installation Materials and Accessories
- Installation Materials and Accessories
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>