BLUETTI EP600 Power Station with 6,000 W output Demonstrated User Guide

June 9, 2024
Bluetti

BLUETTI EP600 Power Station with 6,000 W output Demonstrated

BLUETTI EP600 Power Station with 6,000 W output
Demonstrated

Dimension

EP600

Dimension

B500

Dimension

Overview

Overview

1| PV input 1| 5| LED Indicator| 9| Waterproof and ventilate valve| 13| USB Port
---|---|---|---|---|---|---|---
2| PV input 2| 6| Signal Port 1| 10| COM Communicate Port| 14| Load Port
3| DC ON/OFF| 7| Signal Port 2| 11| CT Input Port| 15| Grid Port
4| Battery| 8| Battery| 12| DRMs Por| 16| Ground

Overview

1 Negative output cable port 6 Positive output cable 11 Ground wire
2 Signal port(Upper) connection cable port (Upper) 7 Inverter signal cable
port 12 Ground wire port(Bottom)
3 Signal cable port (Bottom) 8 Waterproof and breathable valve 13

Waterproof and breathable valve
4| Negative output cable port| 9| Positive output cable port (bottom)
5| Manual mechanical switch| 10| ON/OFF Switch

Installation

overview

overview

NOTE: The Meter is only used for the situation of installed three phase solar PV inverters, it is provided By BLUETTI and it is free.

NOTES:

  1. This document is for quick guidance installation only. For details, please refer to the installation and User Manual.
  2. Machine damage caused by failure to follow the content is not covered by the warranty.
Installation requirements

Installation requirements
Installation requirements

Wall mounting

Wall mounting

Size of dri l ling the wall mounting holes (u ni t: mm)·
Wall mounting

Connecting cables

overview

Connecting cables

Connect the communication cable

Connect the communication cable

Note: Make sure the router used for EP600appliestoWiFiofIEEE 802.11 b/g/n, 2.4GHz, please turn off the5Goption

Connect the Ground Cable

Connect the Ground Cable

Connect the GRID and BACKUP Cable

Connect the GRID and BACKUP Cable

NOTE :It is forbidden to connect the grid cable to , it must be less than 500V. the BACKUP interface of EP600.

Connect the Batteries and EP600

Connect the Batteries and EP600
Connect the Batteries and EP600
Connect the Batteries and EP600

Connect PV cable
Port Define Cable pec.

Connect PV cable| PV1+:To solar panel positive PV1-:To solar panel negative PV1 PE:PV1 to solar panel ground| Conductor cross- sectional area 2.5mm 2~ 4mm 2
Connect PV cable| PV2+:To solar panel positive PV2-:To solar panel negative PV2 PE:PV2 to solar panel ground

  1.  Positive metal core
    Connect PV cable

  2. Negative metal core
    Connect PV cable

  3. Positive metal core
    Connect PV cable

  4. Negative metal core
    Connect PV cable

NOTE: Please check the solar PV open circuit voltage it must be less than 500V.

Connection CT

Connection CT
Connection CT

NOTES:

  1. Make sure the arrow inside the CT points tothegrid.
  2. Pay attention to the phase sequence when connect the CT: L1 to R, L2 to S, L3 to
  3. The CT connect to the EP600 must be installedontotheL1/L2/L3 cables of the residential main circuit breaker.
Connection Transfer Switch

Connection Transfer Switch

Transfer switch is necessary for building impartial residential backup system.

NOTES:

  1. The neutral cable from the BACKUP interface of EP600cannot be connected to the neutral cable of the publicgrid.
  2. Connect the L1/L2/L3/N wires fromEP600BACKUPtothepin 2(L1), pin 6(L2), pin 10(L3), pin 14(N) of transfers itch;
  3. Connect the L1/L2/L3/N wires frompublic gridtothepin4(L1), pin 8(L2), pin 12(L3), pin 16(N) of transfer switch;
  4. Move away the wires of the circuit breaker connectedtoessential appliances, then connect pin1(L1), pin5(L2),pin9(L3), pin 13(N) of transfer switch.
Electrical connection modes 1: DC coupling

Electrical connection modes 1: DC coupling

Electrical connection modes 1: DC coupling

Electrical connection modes 2: AC coupling

Electrical connection modes 2: AC coupling
Electrical connection modes 2: AC coupling
Electrical connection modes 2: AC coupling

NOTE:

The Meter is only applicable to the case where the PV grid-tied inverters have been installed.

  1. Connect the cables of UA UB UC UN to the L1/L2/L3/N of the PV inverter,
  2. Connect the cables of the CT to the Meter and tied to the wires of L1/L2/L3/N of the PV inverter.
  3. Please connect the 485-A red wire to pin 21,485-B black wire to pin 22.

Power on

Step1: Switch on the DC circuit breaker oneachB500battery pack.
Step2: Press and hold the power button of any battery pack for 3 seconds and the green indicator on thebuttonlightsup
Step3: Wait for 40 seconds until the green indicator of the inverter is always on.
Step4: When connecting to the sloar panel ,pleases witch on the DC circuit breakers on EP600.
Step5: Switch on the AC circuit breakers connectedtotheEP600 grid port.
Step6: Power on the system via the BLUETTI app. For details, please refer to Setting section on App Manual.
Step7: Check the voltage of BACKUP.
Step8: Switch on the AC circuit breakers connectedtotheEP600 load port. END, Then you can check the EP600 system status through the app.
Power on

States| Run
Green light
| Alarm
Orange light
| Fault
Red light
---|---|---|---
No alarm and No fault| ****

Always ON

| I| I
Alarm without fau lt| ****

AlwaysON

| ****

Always ON

| I
No alarm with fau lt| I| I| ****

Always ON

Alarm and fault| I| ****

Always ON

| ****

Always ON

Service and contact

Company: POWEROAK GmbH Address: Lindwurmstr.114, 80337 Munches Germany

Mail: logi@bluetti.de1

After-sales address in EU :Lies-Meitner-Strasse 14, 28816 Suter, Germany

sale-eu@bluettipower.com sale-uk@bluettipower.com

@bluetti_inc

@bluett i.inc

@bluetti_official

BLUETTI Logo

Documents / Resources

| BLUETTI EP600 Power Station with 6,000 W output Demonstrated [pdf] User Guide
EP600 Power Station with 6 000 W output Demonstrated, EP600, Power Station with 6 000 W output Demonstrated, Demonstrated
---|---

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals