BLUETTI EP600 Power Station with 6,000 W output Demonstrated User Guide
- June 9, 2024
- Bluetti
Table of Contents
BLUETTI EP600 Power Station with 6,000 W output Demonstrated
Dimension
EP600
B500
Overview
1| PV input 1| 5| LED Indicator| 9| Waterproof and ventilate valve| 13| USB
Port
---|---|---|---|---|---|---|---
2| PV input 2| 6| Signal Port 1| 10| COM Communicate Port| 14| Load Port
3| DC ON/OFF| 7| Signal Port 2| 11| CT Input Port| 15| Grid Port
4| Battery| 8| Battery| 12| DRMs Por| 16| Ground
1 | Negative output cable port | 6 | Positive output cable | 11 | Ground wire |
---|---|---|---|---|---|
2 | Signal port(Upper) connection cable port (Upper) | 7 | Inverter signal cable | ||
port | 12 | Ground wire port(Bottom) | |||
3 | Signal cable port (Bottom) | 8 | Waterproof and breathable valve | 13 |
Waterproof and breathable valve
4| Negative output cable port| 9| Positive output cable port (bottom)
5| Manual mechanical switch| 10| ON/OFF Switch
Installation
overview
NOTE: The Meter is only used for the situation of installed three phase solar PV inverters, it is provided By BLUETTI and it is free.
NOTES:
- This document is for quick guidance installation only. For details, please refer to the installation and User Manual.
- Machine damage caused by failure to follow the content is not covered by the warranty.
Installation requirements
Wall mounting
Size of dri l ling the wall mounting holes (u ni t: mm)·
Connecting cables
overview
Connect the communication cable
Note: Make sure the router used for EP600appliestoWiFiofIEEE 802.11 b/g/n, 2.4GHz, please turn off the5Goption
Connect the Ground Cable
Connect the GRID and BACKUP Cable
NOTE :It is forbidden to connect the grid cable to , it must be less than 500V. the BACKUP interface of EP600.
Connect the Batteries and EP600
Connect PV cable
Port | Define | Cable pec. |
---|
|
PV1+:To solar panel positive PV1-:To solar panel negative PV1 PE:PV1 to solar
panel ground| Conductor cross- sectional area 2.5mm 2~ 4mm 2
|
PV2+:To solar panel positive PV2-:To solar panel negative PV2 PE:PV2 to solar
panel ground
-
Positive metal core
-
Negative metal core
-
Positive metal core
-
Negative metal core
NOTE: Please check the solar PV open circuit voltage it must be less than 500V.
Connection CT
NOTES:
- Make sure the arrow inside the CT points tothegrid.
- Pay attention to the phase sequence when connect the CT: L1 to R, L2 to S, L3 to
- The CT connect to the EP600 must be installedontotheL1/L2/L3 cables of the residential main circuit breaker.
Connection Transfer Switch
Transfer switch is necessary for building impartial residential backup system.
NOTES:
- The neutral cable from the BACKUP interface of EP600cannot be connected to the neutral cable of the publicgrid.
- Connect the L1/L2/L3/N wires fromEP600BACKUPtothepin 2(L1), pin 6(L2), pin 10(L3), pin 14(N) of transfers itch;
- Connect the L1/L2/L3/N wires frompublic gridtothepin4(L1), pin 8(L2), pin 12(L3), pin 16(N) of transfer switch;
- Move away the wires of the circuit breaker connectedtoessential appliances, then connect pin1(L1), pin5(L2),pin9(L3), pin 13(N) of transfer switch.
Electrical connection modes 1: DC coupling
Electrical connection modes 2: AC coupling
NOTE:
The Meter is only applicable to the case where the PV grid-tied inverters have been installed.
- Connect the cables of UA UB UC UN to the L1/L2/L3/N of the PV inverter,
- Connect the cables of the CT to the Meter and tied to the wires of L1/L2/L3/N of the PV inverter.
- Please connect the 485-A red wire to pin 21,485-B black wire to pin 22.
Power on
Step1: Switch on the DC circuit breaker oneachB500battery pack.
Step2: Press and hold the power button of any battery pack for 3 seconds
and the green indicator on thebuttonlightsup
Step3: Wait for 40 seconds until the green indicator of the inverter is
always on.
Step4: When connecting to the sloar panel ,pleases witch on the DC
circuit breakers on EP600.
Step5: Switch on the AC circuit breakers connectedtotheEP600 grid port.
Step6: Power on the system via the BLUETTI app. For details, please refer
to Setting section on App Manual.
Step7: Check the voltage of BACKUP.
Step8: Switch on the AC circuit breakers connectedtotheEP600 load port.
END, Then you can check the EP600 system status through the app.
States| Run
Green light| Alarm
Orange light| Fault
Red light
---|---|---|---
No alarm and No fault| ****
Always ON
| I| I
Alarm without fau lt| ****
AlwaysON
| ****
Always ON
| I
No alarm with fau lt| I| I| ****
Always ON
Alarm and fault| I| ****
Always ON
| ****
Always ON
Service and contact
Company: POWEROAK GmbH Address: Lindwurmstr.114, 80337 Munches Germany
Mail: logi@bluetti.de1
After-sales address in EU :Lies-Meitner-Strasse 14, 28816 Suter, Germany
sale-eu@bluettipower.com sale-uk@bluettipower.com
@bluetti_inc
@bluett i.inc
@bluetti_official
Documents / Resources
|
BLUETTI EP600 Power Station with 6,000 W output
Demonstrated
[pdf] User Guide
EP600 Power Station with 6 000 W output Demonstrated, EP600, Power Station
with 6 000 W output Demonstrated, Demonstrated
---|---
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>