ANDERSON-NEGELE Weighing System Load Stand II Instruction Manual
- June 9, 2024
- ANDERSON-NEGELE
Table of Contents
Weighing System Load Stand II
SENSORS FOR FOOD AND LIFE SCIENCES.
30044 / 1.0 / 2022-05-25 / MH / EU-NA
Installation and operating instructions Weighing System Load Stand® II
Note
The contents of this document are the intellectual property of Anderson-
Negele. Any reproduction or translation without written permission is
prohibited.
Please read these installation and operating instructions carefully. All
instructions in this manual must be followed exactly to ensure proper
operation of the unit.
If you have any questions regarding the product, installation or
commissioning, please contact Anderson-Negele Support at support under:
America: Phone 800-833-0081 techservice
@anderson-negele.com
Other countries: Phone +49-8333-9204720 support@anderson-negele.com
ANDERSON INSTRUMENT COMPANY 156 Auriesville Road Fultonville, NY 12072, USA
Phone 800-833-0081 info@anderson- negele.com techservice@anderson-negele.com
NEGELE MESSTECHNIK GMBH Raiffeisenweg 7
87743 Egg an der Guenz, GERMANY
Phone +49 (0) 83 33 . 92 04 – 0 sales@anderson-negele.com support@anderson- negele.com
Table of contents
2
Table of contents
Weighing System Load Stand® II…………………………………………………………………….1
· Welcome ……………………………………………………………………………………………………………………3 · Manual
conventions………………………………………………………………………………………………….3 · Inspection and storage
…………………………………………………………………………………………….3
Field of application / intended use ………………………………………………………………4
· Description………………………………………………………………………………………………………………..4 · Product features
……………………………………………………………………………………………………….4
Installation of the Load Stand® II …………………………………………………………………..6
· Vessel preparation ……………………………………………………………………………………………………6 · Hardware
…………………………………………………………………………………………………………………..6 Installation
………………………………………………………………………………………………………………….7 · Leveling the
vessel……………………………………………………………………………………………………8 · Checking Output using
Anderson-Negele-Testmeter ……………………………………………9 · Operation and
Installation……………………………………………………………………………………. 13 ·
Notes………………………………………………………………………………………………………………………. 13
Electrical installation ………………………………………………………………………………………14
· General Safety……………………………………………………………………………………………………….. 14 · Disconnect
requirements for permanently
installed equipment ……………………………………………………………………………………………… 14 · Installation
…………………………………………………………………………………………………………….. 14 · Guidelines
……………………………………………………………………………………………………………… 14
Installation of the sun shield ………………………………………………………………………. 16
· Installation of a sun shield …………………………………………………………………………………… 16
Calibration …………………………………………………………………………………………………………… 17
· Calibration methods ……………………………………………………………………………………………… 17 · Alternative
methods for checking output……………………………………………………………. 17
Troubleshooting Load Stand® II ……………………………………………………………. 1821
Dimensional drawings ……………………………………………………………………………………. 22
3
Introduction
Welcome
Manual Conventions
In many applications, weighing systems for content measurement offer a more
practical and precise solution than other techniques. With a field-proven
sensor program of the brand Kistler-Morse, Anderson-Negele now also offers
precise, robust and efficient solutions in this measuring category.
This manual describes the installation of the sensors and its various hardware
options. It includes procedures for adjusting the vessel, and instructions for
wiring the sensors to one or several junction boxes and to the signal
processor.
Refer to the signal processor manual for specific information on wiring the
junction boxes to the signal processor.
If you have any questions about the product, its installation or commissioning
please contact Anderson-Negele Support at:
America: Phone 800-833-0081 techservice
@anderson-negele.com
Two kinds of special explanations appear throughout the manual: Caution and
Note.
Caution Possible risk to the product. The sensor or other equipment may be
damaged if this information is ignored.
Note Contains additional information about a step or feature critical to the
installation or operation of the sensors. ·
Inspection and storage
Other countries: Phone +49-8333-9204720 support@anderson-negele.com
Inspect each package upon receipt for damage that may have occurred due to mishandling during shipping. If the unit is received damaged, notify the carrier or the factory for instructions. Failure to do so may void your warranty.
Authorized Personnel
If the device is not scheduled for immediate installation:
All instructions described in this document must be performed by authorised and qualified service personnel only.
1. Following inspection, repackage the unit into its original packaging.
Before installation, please read these instructions and
2. Select a clean dry site, free of vibration, shock and
familiarise yourself with the requirements and functions.
impact hazards.
The required personal protective equipment must always be worn when servicing the device.
If storage will be extended longer than 30 days, the unit must be stored at temperatures between 0 to 40 °C
(32 to 104 ºF) in non-condensing atmosphere with
Use
humidity less than 85 %.
The device is solely intended for use as described in this manual. Reliable operation is ensured only if the instrument is used according to the specifications described in this document. For safety and warranty reasons, use of accessory equipment not recommended by the manufacturer or modification of this device is explicitly forbidden. All servicing of this equipment must be performed by qualified service personnel only. This device should be mounted in locations where it will not be subject to tampering by unauthorized personnel.
Caution
Do not store a non-powered unit outdoors for a prolonged period.
Misuse
Improper use or installation of this device may cause the following: ·
Personal injury or harm · Application specific hazards such as vessel overfill
· Damage to the device or system
Field of application / intended use
4
Field of application / intended use
Description
Product features
The Load Stand® II is a direct vessel-to-foundation structural member designed
to be your dependable and accurate continuous inventory monitoring and control
solution. The Load Stand® II system is ideal for vessels with loads of 45,000
kg (100,000 lbs) or more and is available for loads of 11,000 to 453,000 kg (
25,000 to 1,000,000 lbs) per support point.
The monolithic design becomes an integral part of the vessel structure for
maintenance free weight measurements. The sensing elements are field
replaceable without taking the vessel out of service.
· Monolithic Design · High Output · Multiple Weight Ranges · Solid State Strain Sensors · Limited Down Time
The mechanical design of the Load Stand® II lends to simplified design of the mounting, whether by legs or gussets. Simple, rugged, and easy to match end- mounting plates yield minimum design time and easy installations.
5
Specification
Specification Load Stand® II Weighing Cells
Technical Features
Excitation Voltage – Operating Range Maximum Current Recommended Supply Voltage Functional Integrity Humidity Protection Class Materials
Measurement Accuracy Temperature ranges Authorizations
Sensor Junction Box
Non-Linearity/Hysteresis Combined Repeatability Rated Output No Load Output
Ambient Temperature Range
Operational Temperature Range
Storage Temperature Range All models
12…30 V DC Half-Bridge 15.52 mA @ 12 VDC excitation 12 V DC 2 x rated load
(compression) 100 % Non-condensing Designed for outdoor applications Pedestal:
Carbon Steel 1.0044 (ASTM A53 GR) Flanges: Carbon Steel 1.0459 (ASTM A36)
Finish: Polyester Powder Coating 4 x Microcell II Plastic or Stainless Steel
(ATEX), included
0.2 % of rated load 0.2 % of rated load 320 mV DC @ 12 V DC ±1 % ±50 mV
Standard: -18…38 °C (0…100 °F) Mid: 10…66 °C (50…150 °F) -34…66 °C (-30…150
°F) (outside this range the accuracy may be reduced) -34…66 °C (-30…150 °F)
ATEX (option)
Installation of the Load Stand® II
6
Installation of the Load Stand® II
Vessel preparation
Caution
There are two aspects to successful use of Load Stands– properly functioning
Load Stands and appropriate vessel support characteristics. Review the
following list of error sources, and make the recommended corrections before
you install Load Stands:
· An inadequate vessel foundation can allow excessive movement. Ensure the
foundation is concrete or steel. Refer to the installation drawings (Figure 2
and figure 3) for details.
· Hidden load-bearing structures, such as discharge chutes or plumbing
supported by the floor, can reduce loads on the vessel supports. Install
flexible couplings to minimize this problem.
· Cross-connecting structures, such as catwalks and manifolds, can transfer
loads from adjacent vessels. Install slip joint or flex couplings to minimize
this problem.
· Shock loads can damage the Load Stand. Install protective barriers or stops
to prevent vehicles from hitting the vessel supports.
· Extra holes in the vessel gusset or vessel base plate which bolts to the
Load Stand, replace the gusset/ plate with the correct number of holes for
bolting to the Load Stand.
Remove power from the unit before installing, removing, or making ajustments.
Hardware
1. Anderson-Negele provides rubber washer assemblies for the Load Stand® top
mounting hole connections.
2. All other hardware to attach the Load Stand® to the vessel and to the
foundation is customer-supplied.
3. Use specified hardware and bolt sizes.
4. Use bolts with sufficient threaded length to accommodate the thickness of
the connecting parts and the specified nuts and washers. The length of the
bolts should not be so long that they interfere with other parts of the
installation.
· Anderson-Negele recommends the placement of a base plate beneath the Load
Stand. Refer to the installation drawings (Figure 2 and figure 3) for material
thickness for a load stand base.
· During installation, do not put the entire vessel load on less than the
correct number of Load Stands.
· If you need to raise the vessel or one vessel leg after installation: Loosen
the bolts on all the Load Stands prior to raising the vessel or leg to prevent
overloading.
Caution
Using larger than specified sizes may overstress the Load Stand® during
installation, damaging the Load Stand® and voiding the warranty.
7
Installation of the Load Stand® II
Installation
Caution
a) Slowly lower the vessel until it is resting on the Load
Stand® assemblies. Alignment pins may be used to
Use proper supports to prevent the vessel from tipping
help guide and position the vessel.
or falling.
b) Center the Load Stand® top mounting holes with the
vessel mounting holes, using the clearance available
1. Inspect the load stand. With orders of different types,
from the Load Stand® bottom mounting holes.
make sure the correct load stand will be installed.
c) Place a rubber washer on each customer-provided
2. Measure the No Load Output to ensure it’s ±50 mV.
top bolt. Place the four top bolts through the vessel, rubber pad, and Load Stand® mounting holes.
3. Raise the vessel. 4. Inspect the bottom of the vessel mounting surface to
ensure it is perfectly flat. Check for angular misalign-
d) Place a rubber washer and customer provided nut on the end of each bolt. Tighten the nuts finger tight. Do not compress the rubber washers at this time.
ment. Remove any debris from the mounting surface. Depending on the foundation (concrete or beam mount-
Perform preliminary leveling shimming:
ing) refer to the respective indications on figure 2 and
a) Inspect the installation for gaps between the vessel
figure 3.
mounting plate and the Load Stand.
5. Mount the Load Stands on the foundation.
a) Place the customer-supplied leveling nuts and hardened washer on each
anchor bolt on the load stand. Check the angular alignment.
b) Eliminate gaps by doing one or a combination of the following:
· Turn the leveling nuts, only to raise the entire load stand.
b) Carefully place the Load Stand® on the leveling nuts/washers, aligning the
mounting holes with the foundation anchor bolts. The alignment should allow
the load stand to easily slide onto the anchor bolts.
c) Place the customer-supplied hardened washer and nut on each anchor bolt. Do
not fully tighten the nuts at this time. Leave a 6 mm (1/4″) gap between the
nut and washer to allow for positioning the Load Stand.
· Install one or more full shims above the Load Stand® rubber pad. Two shims
are provided by Anderson-Negele with each Load Stand.
· Install one or more partial shims above the Load Stand® rubber pad. Two
shims are provided by Anderson-Negele with each Load Stand. Using the Load
Stand® flange as a guide, mark the required shim shape on a thin piece of
cardboard. Use this as a template to cut the required shape from a full shim.
d) Repeat Steps A through D for each Load Stand.
e) Record the no load output by connecting the electronics and following chapter “Shimming of the Load Stand”.
6. Mount the vessel on the Load Stands:
Note
On 22,680 kg (50,000 lb) or larger Load Stands, a pry bar may be used at the
base of the Load Stand® to gently move it into position.
Caution
If the vessel hole pattern does not match up with the Load Stand® hole
pattern, modify the mounting holes on the vessel. Do not force the Load Stand®
into position by hammering or by tightening the mounting bolts.
Installation of the Load Stand® II
Caution If installing shims, loosen the top bolts on all the Load Stands
before raising the vessel.
Rubber pad from Anderson-Negele
Junction Box
Nut Washer Levelling nut and washer
6 mm (1/4″)
Min. 50 mm (2″) for grout
Rubber washer from Anderson-Negele
Rubber pad from Anderson-Negele
Rubber washer from Anderson-Negele
Nut
8
Vessel Leg and Mounting Plate Bolt Center Load Stand top mounting holes with
vessel mounting holes. Center bolts in mounting holes.
Install grout only after Load Stand is leveled
Vessel Mounting Surface
Max. +-1° or 6 m (1/4″)
Shimming the load stands
Note
Shimming the load stands distributes the weight evenly on all Load Stands,
increasing system accuracy and life. Perform this procedure while the vessel
is still empty:
1. Check if Leveling Needed
a) Remove the junction box cover.
b) Connect the red, white, and black wires of a 3-conductor cable to the
corresponding terminals on TB1 of the Load Stand® junction box. Connect the
other end of the cable to the corresponding terminals of the Anderson-Negele
Test Meter. Turn on the power to the Test Meter and set the Simulate/Test
switch to the Test position.
If an Anderson-Negele Test Meter is not available, before proceeding refer to
Chapter Set-up – Alternative method for checking output.
c) Verify the dead weight voltage output of the Load Stand® from step 3f.
d) Calculate the change in output, as shown in the example. Output Change =
installed output uninstalled output. The change in output must be positive.
9
Installation of the Load Stand® II
· Check the wiring polarity at the Test Meter. Ensure the red, white, and
black wires are connected to the corresponding terminals.
· If the wiring is correct and you still observe a negative output change, the
vessel may be tilted. Vessel tilting shifts the load onto some Load Stands
while putting other Load Stand(s) in a no load or tension load condition.
This can occur in cases of extreme thermal deformation or unequal vessel leg
length. Proceed to Step 2 to level the vessel.
e) Repeat Steps A through D for each Load Stand® for this vessel.
f) Calculate the average output change for all Load Stands for this vessel.
The output increase for each Load Stand® must be within ±25 % of the average
output increase. Load Stands 1, 2, and 4 meet this requirement, while Load
Stand® 3 does not.
g) If the installation meets the criteria described above (change in output is
positive and is within ±25 % of the average output increase), the vessel is
sufficiently level.
· If sufficiently level, proceed to Step 3 to complete the installation.
· If not sufficiently level, level the vessel as described in Step 2. 8
Checking Output using Anderson-Negele-Testmeter
TB3
LOAD STAND STANDARDIZATION
SENSOR A SENSOR B SENSOR C SENSOR D
BWR BWR BWR BWR
B W R SHLD B W R
TB1
TB2
Junction Box
Anderson-Negele-Testmeter
Note: Wiring from sensors to terminal TB3 not shown for clarity.
ON SENSOR TEST
OFF METER
ADJUST
SIMULATE
TEST
+EX
SIGNAL -EX
Red White Black
Example Recording and Analysis of Output for Level Check
Load Stand® Nr.
Not installed output (no load) (mV)
Installed dead weight (mV)
Output change (Installed – Not installed) (mV)
1
+30
+90
+60
2
-15
+50
+65
3
+17
+30
+13
4
-25
+30
+55
Average Output Change = (60 + 65 + 13 + 55) / 4 = 48.25
Allowable Range for Output Change max. ± 25 % = 48.25 ± (1/2 x 48.25) = 36.18 to 60.3
All Load Stands must meet the requirement that all output changes must be positive (+). Load Stands 1, 2, and 4 meet the requirement that the output change be within ±25 % of the average output change. Load Stand® 3 does not meet the requirement, and its small output change indicates it is
carrying much less weight than the other supports. This load stand must be adjust with the leveling nuts or by shimming to carry additional weight. The vessel must be level to distribute the weight evenly over all the supports.
Installation of the Load Stand® II
10
2. Shimming.
a) Raise the vessel legs for the low output load stands.
b) Raise or lower the load stand with the leveling nuts or add shim(s) above
the rubber pad as required adjusting the distribution of weight on the Load
Stands. Raising the leveling nuts and/or adding shims increases the weight on
the Load Stand. Lowering the leveling nuts and removing shims decreases the
weight on the Load Stand.
Caution
Loosen the top bolts of all the Load Stands before raising the vessel.
Note Adjusting leveling nuts and/or shimming on one Load Stand® affects the weight distribution on all Load Stands.
c) Slowly lower the vessel leg onto the Load Stand® assembly.
d) Repeat Step 1, rechecking the output of all the Load Stands and
recalculating the Output Change (dead weight output – no-load output).
e) Repeat Steps 2A through 2D until the installation meets the criteria for
weight distribution.
3. Complete Installation: Once the vessel is level, complete the
installation:
a) Tighten the nuts on the anchor bolts per the local code.
b) Verify readings.
c) Tighten the nuts on the upper bolts 1/2 to 1 turns past finger tight. This
will compress the rubber washers and rubber pad.
d) Apply double nut, adhesive or spoil the upper bolts and anchor bolts to
prevent loosening of the nuts.
e) Pack grout or concrete under the Load Stand. Do not grout above the bottom
edge of the Load Stand® assembly.
f) Replace the junction box cover if not ready to begin wiring the junction
boxes together and to the signal processor, to ensure no moisture enters the
box.
Prevent Loosening
Tighten 1½ turns past finger tight
Tighten as regulated
Install grout
11
Figure 1 Load Stand® dimension chart (For any note references, see Figure 2 or
3)
LOAD STAND II DIMENSIONS
LOAD RATING
P
A
B
DB
DH
R
H
T
TP
DW
TW
WEIGHT
RT XX
Installation of the Load Stand® II
MAXIMUM FRAME LOADS ALLOWED PER AISC 14th Ed.
LOAD STAND LOAD RATING
COMPRESSION
TENSION
SHEAR
( ) ULTIMATE FRAME LOADS
REFERENCE ONLY
LOAD STAND LOAD RATING
COMPRESSION
TENSION
SHEAR
COMPRESSION TENSION
Legend
A
Outside Dimension
B
Hole Dimension
DB
Bolt Size
DH
Hole Diameter
DW
Washer Outside Diameter
H
Installed Height
P
Pipe Size
R
Corner Radius
RT
Recommended Thickness
T
Plate Thickness
TP
Pad Thickness
TW
Washer Thickness
SHEAR
Note
Refer to installation notes on next pages:
Fig. 2 (concrete mounting) Fig. 3 (beam mounting) Fig. 4 (Wiring and Signal
cable routing)
Installation of the Load Stand® II
12
Figure 2 Concrete Mounting
4 x ASTM A-325 Upper mounting bolts (customer)
Rubber pad (Anderson-Negele)
Vessel support bracket (customer)
DB
8 x Washer sets
(Anderson-Negele)
DW
Shim
A
Junction Box Plastic or Stainless Steel (Anderson-Negele)
8 x Hardened washers 4 x Nuts
(customer)
High strength grout, 5 cm (2″) suggested (customer)
Kistler-Morse
RT
TP
A
T
TW
4 x Microcell Strain gauge sensor, part of Load Stand II
Sun shield, installed by the customer,
mounts under the Junction Box and to
H
the bottom flange of the Load Stand.
Sun shield and sun shield mounting
hardware supplied with each Load Stand
Shim
T
4 x leveling nut and hardened washer (customer)
Anchor bolts according to local code (customer)
Microcell Sensor
Notes
Junction Box
View A-A
Operation and Installation
The Load Stand® II can compensate for thermally induced expansion by slightly
tilting the screws in oversized holes. The mounting holes on the vessel should
be of the same size as the Load Stand® II (,,DH”) and their position should
not be more than ±1.5 mm (0.6″) from their ideal position. Level and fill with
grout so that there is there is no gap between the Load Stand® unit and the
foundation. This is mandatory to assure proper operation.
Customer provided loads and thermal expansion must be must be taken into
account so that applicable building codes and and usage characteristics are
met.
Load Stand® II has been designed in accordance with the Uniform Builidng Code
UBC, 1988 edition. Additional information and test results can be obtained
from AndersonNegele upon request.
Bolts: ASTM A-325, bolt length determined by and supplied by customer.
Pads: Supplied by Anderson-Negele
Install upper mounting bolts in oversized holes (DH) and tighten nuts 1/2 to 1
turns past “finger tight”.
XX = Maximum thermal deformation allowed, computed as shown here : X = DH – DB
– 1.5 mm (1/16″).
Use one of the following to prevent loosening Apply double nut, adhesive or
spoil bolt threads.
The loads listed are the maximum ASD loads for the condition listed
(Compression, Tension or Shear) and are based on AISC 14th edition. All Load
Stands must be selected to resist the combined loading effects for the
specific jobsite and building code requirements. Load combinations can be
found in the applicable building code.
Conduit entry sized for 3/4″ NPT fitting. Use sealing washers and flexible
conduit (liquid tight recommended) to maintain NEMA-4 rating and to de-couple
conduit run from the weighing system.
13
Figure 3 Beam Mounting
4 x ASTM A-325 Upper mounting bolts (customer)
Rubber pad and washer (Anderson-Negele), shim as required
Installation of the Load Stand® II
Vessel support bracket (customer)
8 x Washer sets (Anderson-Negele)
Junction Box Plastic or Stainless Steel (Anderson-Negele)
8 x Hardened washers 4 x Nuts
(customer)
Mounting plate (customer provided), welded to the vessel support beam all
around if required
4 x Microcell Strain gauge sensor, part of Load Stand II
Sun shield, installed by the customer, mounts under the Junction Box and to
the bottom flange of the Load Stand. Sun shield and sun shield mounting
hardware supplied with each Load Stand
Shim
Min. T/2 (if applicable) T
4 x lower mounting bolts (customer)
Vessel support beam (customer)
Operation and Installation
The Load Stand® II can compensate for thermally induced expansion by slightly
tilting the screws in oversized holes. The mounting holes on the vessel should
be of the same size as the Load Stand® II (,,DH”) and their position should
not be more than ±1.5 mm (0.6″) from their ideal position. Level and fill with
grout so that there is there is no gap between the Load Stand® unit and the
foundation. This is mandatory to assure proper operation.
Customer provided loads and thermal expansion must be must be taken into
account so that applicable building codes and and usage characteristics are
met.
Load Stand® II has been designed in accordance with the Uniform Builidng Code
UBC, 1988 edition. Additional information and test results can be obtained
from AndersonNegele upon request.
Notes
Bolts: ASTM A-325, bolt length determined by and supplied by customer.
Pads: Supplied by Anderson-Negele
Install upper mounting bolts in oversized holes (DH) and tighten nuts 1/2 to 1
turns past “finger tight”.
XX = Maximum thermal deformation allowed, computed as shown here : X = DH – DB
– 1.5 mm (1/16″).
Use one of the following to prevent loosening Apply double nut, adhesive or
spoil bolt threads.
The loads listed are the maximum ASD loads for the condition listed
(Compression, Tension or Shear) and are based on AISC 14th edition. All Load
Stands must be selected to resist the combined loading effects for the
specific jobsite and building code requirements. Load combinations can be
found in the applicable building code.
Conduit entry sized for 3/4″ NPT fitting. Use sealing washers and flexible
conduit (liquid tight recommended) to maintain NEMA-4 rating and to de-couple
conduit run from the weighing system.
We recommend to insure system performance and maximum loading capacity a
rigid, flat mounting surface approximately twice dimension “A” long, the same
width as the flange , and a minimum of one half dimension “T” thick. If the
existing beam flange does not meet these requirements plate can be welded to
the beam a shown, however the plate should be a minimum one half dimension “T”
thick.
Electrical installation
14
Electrical installation
Caution
Guidelines
Very high voltage is present. Remove power from the unit before installing,
removing or making adjustments.
General Safety
· The procedure below assumes the conduit/cable tray has been installed.
· Seal all conduit fittings against water entry. Install drain holes at
conduit/cable tray lowest elevation(s) to allow condensation to drain.
When using electrical equipment, you should always follow basic safety
precautions, including the following:
· The installation and wiring of this product must comply with all national,
federal, state, municipal, and local codes that apply.
· Properly ground the enclosure to an adequate earth ground.
· Do not modify any factory wiring. Connections should only be made to the
terminals described in this section.
· Use Belden 3-conductor shielded interconnect cable or equivalent to wire
junction boxes together and to the signal processor, for lengths up to 305 m
(2,000′).
· When wiring cable to junction box terminals, strip back 3″ (76 mm) of cable
sheathing to expose the three conductor wires and shield wire inside. Strip
1/4″ (6 mm) of insulation from the end of each of the conductor wires. Spread
a generous bead of sealant around the sides of the PG 13.5 cable fittings.
Install the fittings in the two large holes.
· All connections to the unit must use conductors with an insulation rating of
300 V minimum, rated for 105 ºC (212 ºF), a minimum flammability rating of
VW-1, and be of appropriate gauge for the voltage and current required (see
specifications).
· Do not allow moisture to enter the electronics enclosure. Conduit should
slope downward from the unit housing. Install drip loops and seal conduit with
silicone rubber product.
Disconnect requirements for permanently installed equipment
A dedicated disconnecting device (circuit breaker) must be provided for the
proper installation of the unit. If independent circuits are used for power
input and main relay outputs, individual disconnects are required.
Disconnects must meet the following requirements:
· Located in close proximity to the device
· Easily accessible to the operator
· Appropriately marked as the disconnect for the device and associated circuit
· Sized appropriately to the requirements of the protected circuit (See
specifications)
Caution
Use only SikaflexTM 1A polyurethane sealant, SikaflexTM ProSelect Construction
sealant or Dow CorningTM RTV 739 or RTV 738. Other sealants may contain acetic
acid, which is harmful to sensors and electronics.
1. See Figure 4: Route the 3-conductor cable through the fitting into the
junction box farthest from the signal processor. Connect wires from the cable
to the TB2 terminal in the junction box: black wire to B, white wire to W, and
red wire to R. Connect the cable shield wire to the Shield terminal between
TB1 and TB2.
2. Route the cable through conduit/cable tray to the next junction box.
Estimate the required length of cable to the terminal strip, allowing a little
extra for strain relief. Cut the excess cable. Connect wires from the cable to
the TB1 terminal in the junction box: black wire to B, white wire to W, and
red wire to R. Connect the cable shield wire to the Shield terminal between
TB1 and TB2.
3. Route another 3-conductor cable through the fitting into this junction
box, and attach wires to the TB2 terminal: black wire to B, white wire to W,
and red wire.
4. Repeat Steps 2 and 3 until all junction boxes for the vessel are wired
together.
Installation
There are two versions of the junction box enclosure. Both versions have four
small holes, which are used for factorywiring the sensors to the junction box.
In addition, the junction box has one or two large holes for wiring the
junction box to other junction boxes and the signal processor:
5. Route the cable from the last junction box through conduit to the signal processor. Refer to the signal processor manual for wiring the junction box to the signal processor. One vessel takes up one channel in the signal processor–the channel shows the average value from all the Load Stands supporting the vessel.
· One large hole (conduit installation); the large hole accommodates a 3/4″ conduit fitting.
Caution
· Two large holes (non-conduit installation); the two large holes are equipped with PG13.5 cable fittings. Cable trays for non-conduit installations are required.
All wiring routed between Junction Boxes and Signal Processor must be continuous (no splices)
15
Figure 4 Signal Cable Layout
Detail A Preferred method with conduit installation
Vessel leg From other Junction Box
Vessel leg 3045 cm (12 – 18″) flange
Junction Box (Cover removed for clarity)
Sensor cover
Sensor cable (Factory wiring) Load Stand II Transducer
3/4″ Entry hole
To signal processor (Conduit run) Male flexible conduit fitting Flexible
conduit
Male flexible conduit fitting Conduit or Tee Male flexible conduit fitting
Flexible conduit
Drip loop 1/2″ min. clearance
to the ground
Electrical installation
Typical cable and conduit routing
Typical Sensor Wiring
To Indicator
Drip Loop
Drip Loop
Drip Loop
Drip Loop
Notes
1. All connection parts are customer provided (unless otherwise noted).
2. Diagrams only examplary. Local electrical installation requirements or
code must be observed.
If the distance transducer – signal processor is max. 305 m (1000′), use
3-wire, shielded 18 AWG interconnect cable for wiring junction boxes to each
other and to the signal processor. If the distance is between 305 and 610 m
use 16 AWG cable.
4. Up to 4 Load Stand® sensor cables can be connected in one junction box.
Junction boxes can be interconnected as required.
The conduit entry hole on this junction box is designed for conduit with 0″
NPS connector. Adapter plugs are required for other connections and wiring to
the signal processor.
6. Junction boxes must always be securely closed and all unused openings
securely sealed with the plugs provided.
Typical Transducer / Junction Box Interconnect Diagram
Note: TB1 and TB2 are electrically identical
To sensor C To sensor D To sensor A To sensor B
Factory wiring up to 4 Microcell sensors of Load Stand II
To next TB1 of Junction Box or to signal processor
From last TB2 of Junction Box
Installation of the sun shield
Installation of the sun shield
The sun shield reduces sun-induced stresses in the Load Stand® sensors and
provides additional protection for the sensors.
1. With the junction box cover off, slightly loosen the screws attaching the
junction box to the Load Stand.
2. Slightly loosen the horizontal screw(s) on the bottom flange of the Load
Stand.
3. Wrap the sun shield around the Load Stand, slipping the cutout slots
behind the loosened screws.
4. Tighten the junction box screws and the horizontal screw(s) on the bottom
flange.
5. Replace the junction box cover.
Screw not on all models
16
Loosen Junction Box screws; Re-thighten after sun shield is installed
Slide sun shield behind junction box and loosened screws. Wrap sun shield
around Load Stand. Slide shield behind Junction Box and loosened screws on
other end.
Loosen bottom flange screw(s); Re-thighten after sun shield is installed.
17
Calibration
Calibration
Calibration methods
Before calibrating, you must install a signal processor.
There are two calibration methods:
· Live Load calibration: set lo span and hi span while moving material into or
out of the vessel. This is the preferred method.
· Manual calibration: set scale factor counts, scale factor weight, and zero
calibration value without moving material. This method is less accurate than
Live Load calibration.
A Live Load calibration requires you to move a known quantity of material into
or out of the vessel while performing the procedure. The quantity of material
moved must be at least 25 % of the vessel’s total capacity to provide best
accuracy. Live Load calibration is also based on the material weight currently
in the vessel.
Manual calibration allows you to start using the system as soon as sensors,
junction boxes, and signal processor are installed and wired, even if you
cannot
move any (or enough) material now. Manual calibration values are based on
system parameters, including sensor sensitivity, vessel stress, and signal
processor A/D converter sensitivity. These values are known, can be
calculated, or can be obtained from the signal processor. Manual calibration
is also based on the material weight currently in the vessel.
Note that manual calibration does not take into account the actual response to
changes in weight. Theoretically, a change in weight results in a proportional
change in digital counts. However, the structure.s actual response to load and
interaction with piping, catwalks, a roof, discharge chutes, etc. prevents the
system from achieving theoretical values. Manual calibration is a good start,
but to obtain the highest accuracy, perform a Live Load calibration when
scheduling permits you to move material into or out of the vessel.
Refer to the signal processor manual for the procedure to input calibration
parameters.
Alternative method for checking output
4. Set a voltage range on the DMM that will accommodate
a measured range of ±1 volt.
If you do not have an Anderson-Negele Test Meter, use a Digital Multimeter (DMM) and the Load Stand® II junction box to monitor the voltage output of each Load Stand® before and during installation. Set up the DMM as described below.
See Pre-Check Procedures, for details on checking the voltage output before installation. See Leveling Vessel, Hardware Installation, for details on monitoring the voltage output to determine if the vessel weight is
1. Disconnect the white wires from the W terminals on TB1
evenly distributed among the Load Stands.
and TB2 in the junction box, see Figure below.
6. Once output is verified, reconnect the white wires on
2. Connect the DMM (+) probe to the W terminal on either
the W Terminals on TB1 and TB2 in the junction box.
TB1 or TB2 (See A).
3. Connect the DMM (-) probe to TP1 in the junction box (See B).
Using DMM and Junction Box to Monitor Voltage Output
12 VDC Excitation Voltage from Signal Processor connected on
Black and Red Terminals
TB3
LOAD STAND STANDARDIZATION
SENSOR A SENSOR B SENSOR C SENSOR D
BWR BWR BW R BWR
TP1
TP2
TP3
B W R SHLD B W R
TB1
TB2
(B) Connect DMM (-) probe to TP1
A) Connect DMM (+) probe to either W Terminal (TB1 or TB2)
Cable from Previous Junction Box (if applicable)
Cable to Next Junction Box or Signal Processor
Troubleshooting Load Stand® II
18
Troubleshooting Load Stand® II
Problem
Small Amplitude Changes or Erratic Fluctuations in Display Readings
Description Fluctuations can be caused by small amplitude drift or
oscillation, with peak-to-peak disturbance of 0.1 % to 0.5 % of full scale, is
normal. Problem likely to be noticed shortly after initial installation.
Fluctuations can be caused by moisture in the cable conduit, junction boxes,
or PCBs. Problem likely to be noticed on system that previously functioned
correctly.
Fluctuations can be caused by jammed bolts or heat radiation/ conduction.
Problem likely to be noticed shortly after initial installation or on system
that previously functioned correctly in cool or overcast weather.
Fluctuations can be caused by damaged Load Stand® sensor. Problem likely to be
noticed shortly after initial installation or on system that previously
functioned correctly.
Solution
Reduce drift or oscillation by setting ‘count by’ and ‘averaging’
appropriately on signal processor (refer to signal processor manual).
Check conduit, junction boxes and PCBs for water contamination. Find water
entry source and correct problem. Dry with a hair drier. Remove/ replace
corroded parts and materials.
Caution: If using sealant to eliminate water entry, use SikaflexTM 1A
polyurethane sealant, SikaflexTM ProSelect Construction sealant or Dow
CorningTM RTV 739 or RTV 738. Other sealants may contain acetic acid, which is
harmful to sensors and electronics.
Loosen nuts on top bolts and inspect top bolts. · Top bolts free to move in
holes: If vessel is
heated, it may be radiating or conducting heat through vessel legs and
affecting Load Stand® sensors.
· To reduce head radiation/conduction:
a) Insulate vessel.
b) Contact Anderson-Negele to discuss adding a high temperature insulating
pad.
· Top bolts jammed: Jammed top bolts indicate undersized bolt holes on vessel
mounting flange and/or vessel support movement beyond limits of Load Stand®
clearance holes. Resulting side loads affect Load Stand® sensors.
· To reduce side loads: a) Enlarge vessel mounting flange bolt holes to
provide additional clearance.
Using Digital Multimeter (DMM), check resistance for individual Load Stands:
- Set meter resistance scale to accommodate
measured range up to 20,000 .
2. At the suspect Load Stand® junction box, remove wiring at TB1 and TB2, which connects to other Load Stands and signal processors.
19
Troubleshooting Load Stand® II
Problem
Small Amplitude Changes or Erratic Fluctuations in Display Readings
Description
Fluctuations can be caused by damaged Load Stand® sensor.
Problem likely to be noticed shortly after initial installation or on system
that previouslyfunctioned correctly.
Solution
3. Put one DMM lead on W and other lead on R terminal on TB1 of Load Stand®
junction box. Record resistance, and verify it is 7,660 ± 700 . If reading is
outside this range, one or more Load Stand® sensors are damaged and must be
replaced–go to Step 7 to identify which sensor is damaged.
4. Put one DMM lead on W and other lead on B terminal on TB1 of Load Stand®
junction box. Record resistance, and verify it is 7,660 ± 700 . If reading is
outside this range, one or more Load Stand® sensors are damaged and must be
replaced–go to Step 7 to identify which sensor is damaged.
5. Verify readings from Steps 3 and 4 are within 700 of each other. If not,
one or more Load Stand® sensors are damaged and must be replaced–go to Step 7
to identify which sensor is damaged.
6. Repeat Steps 2 through 5 for each suspect Load Stand, until Load Stand®
with damaged sensor is located.
7. Identify damaged sensor at Load Stand® identified in Step 3, 4, or 5:
a) Remove one sensorss wires from junction box terminal TB3. b) Put one DMM lead on sensor
s white wire and other lead on red wire. Record
resistance, and verify it is 1.45 K ± 200 . If resistance is outside this
range, sensor is damaged and must be replaced.
c) Put one DMM lead on sensor`s white wire and other lead on black wire.
Record resistance, and verify it is 1.45K ± 200 . If resistance is outside
this range, sensor is damaged and must be replaced.
d) Verify readings from Steps B and C are within 700 of each other. If not,
sensor is damaged and must be replaced.
e) Repeat Steps A through D for each sensor, until damaged sensor is located
and replaced.
Troubleshooting Load Stand® II
20
Problem
Small Amplitude Changes or Erratic Fluctuations in Display Readings
Description
Fluctuations in readings can be caused by short to ground.
Solution
Using a Digital Multimeter (DMM) or ohmmeter, check for shorts to ground as
follows: 1. Set meter resistance scale to accommodate
maximum measured range.
2. Disconnect junction box wires of suspect vessel from signal processor.
3. With one lead to earth ground and other lead to white wire, check
resistance on disconnected wires:
If reading is less than infinite (i.e., there is resistance), a short is
indicated; proceed to Step 4 to identify location.
If no short is indicated, investigate other explanations for problem.
4. Starting with junction box closest to signal processor in daisy chain,
disconnect wires connecting junction box to other junction boxes. With one
lead to earth ground and other lead to white terminal on TB3, check resistance
on wires leading from junction box:
If the reading is less than infinite (i.e., there is resistance), short is
indicated; proceed to Step 5 to identify location. If no short is indicated,
proceed to next junction box in daisy chain, disconnecting wires connecting it
to other junction boxes and checking resistance. Perform for each junction box
down chain until short is located; proceed to Step 5 to identify location.
Note: Sun shield or junction box mounting bolts are good locations for
connecting probe to ground.
5. Disconnect wires for one sensor from above-identified junction box. With
one lead to earth ground and other lead to white wire, check resistance on
disconnected sensor wires: If reading is less than infinite (i.e., there is
resistance), short is indicated. Replace shorted sensor. If no short is
indicated, disconnect next sensor’s wires from junction box and check
resistances. Repeat for each sensor wired to junction box until short is
located. Replace shorted sensor.
21
Troubleshooting Load Stand® II
Problem
Small Amplitude Changes or Erratic Fluctuations in Display Readings
Repeatable Drift over 24-hour Period
Description
Fluctuations in readings can be caused by problems with signal processor.
Periodic drift is most likely caused by thermal expansion due to sun’s
radiation or vessel’s response to its own heating cycles.
Problem likely to be noticed shortly after initial installation or on system
that previously functioned correctly in cool or overcast weather.
Solution
Check signal processor excitation voltage and incoming AC voltage for accuracy
and stability (refer to signal processor manual).
Loosen nuts on top bolts and inspect top bolts. · Top bolts free to move in
their holes: If vessel
is heated, it may be radiating or conducting heat through vessel legs and
affecting Load Stand® sensors.
· To reduce head radiation/conduction:
a) Insulate vessel.
b) Use a heat shield like a metal plate to reflect heat.
c) Contact Anderson-Negele to discuss adding a high temperature insulating
pad.
· Top bolts jammed–Jammed top bolts indicate undersized bolt holes on vessel
mounting flange and/or vessel support movement beyond limits of Load Stand®
clearance holes. Resulting side loads affect Load Stand® sensors.
· To reduce side loads:
a) Enlarge vessel mounting flange bolt holes to provide additional clearance.
If support movement and heat radiation/conduction have been eliminated as
source of error and periodic drift still indicates system is not meeting
specifications (Appendix A), contact Anderson-Negele.
Note: If keeping long-term records, take level readings at same time each day
to minimize error.
Problem
Sudden Change in Weight Reading or System Requires Frequent Recalibration
Description
Sudden change in weight reading can be caused by a broken Load Stand, causing
indicated weight to shift up or down by large amount, up to 100 % of full-
scale live load.
Problem likely to be noticed on system that previously functioned correctly.
Sudden change in weight reading can be caused by problems with signal
processor.
Solution
Check voltage outputs of individual Load Stands (refer to Chapter 2, Pre-Check
Procedures, the section titled Method 1: Measuring Output). Voltage should be
between -750 mV and +750 mV on installed Load Stands. If not, check Load
Stand® resistance as described above in Problem 1.
Check signal processor excitation voltage and incoming AC voltage for accuracy
and stability (refer to signal processor manual).
Dimensional drawings
22
Dimensional drawings
Load Stand® II with Plastic Junction Box (IP-66 / NEMA-4)
Load Stand II (22,6796 kg / 50,000 lbs shown)
Plastic Junction Box (IP-66 / NEMA-4)
Load Stand® II with Stainless Stell Junction Box (IP-66 / NEMA-4X)
Load Stand II (22,6796 kg / 50,000 lbs shown)
Stainless Steel Junction Box (IP-66 / NEMA-4X)
2 3 Notes
Notes
24
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>