Blue Sky Network Skylink Battery Pack User Guide

June 9, 2024
Blue Sky Network

Blue Sky Network Skylink Battery Pack

STEP 1: ATTACH THE BATTERY
Bolt the SkyLink Battery Pack to the SkyLink Data Gateway. A permanent installation it can be mounted to a post using the Data Gateway mounting bracket, or by screwing it to a wall.
STEP 2: ATTACH THE INTERCONNECT CABLE
Connect the interconnect cable between the Battery Pack and the Data Gateway. There is one standard interconnect cable and three optional cables:

  1. Standard 6” interconnect cable, PN 300697-1
  2. Optional 72” interconnect cable, PN 300697-2
  3. Optional 6” interconnect cable & Ethernet cable, PN 300697E-1

The interconnect cable connects to the left-hand connector of the Data Gateway and the left-hand connector of the Battery Pack when looking at the front of both units.

STEP 3: ATTACH THE POWER INPUT CABLE
Connect the power input cable to the right-hand connector on the Battery Pack. for mobile use, this is a temporary connection to charge the battery and a permanent connection for fixed installations. Their standard cable has an AC adapter and there is an optional DC cable:

  1.  Standard power input cable, PN 300698-AC
  2.  Optional power input cable, PN 300698-DC

SKYLINK BATTERY PACK QUICK START GUIDE

BATTERY STACKING
To stack batteries, use the battery stacking cable, PN 300699, as shown below:

www.blueskynetwork.com
SKYLINK-BATTERY-PACK-QUICK_START_GUIDE-V1.0 For customer use only. Not intended for further distribution.

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals