ASC Group ASC Stairway Tower Instructions
- September 5, 2024
- ASC Group
Table of Contents
ASC Group ASC Stairway Tower
Product Information
Specifications
- Manufacturer: ASC Group
- Model: Stairway Tower
- Intended Use: Provide access to other structures
- Components:
1. 7-rung Frame
2. 4-rung Frame
3. Platform without trapdoor
4. Stairway
5. Guardrail stairway inside
6. Guardrail stairway outside
7. Horizontal brace
8. Diagonal brace
9. Double horizontal brace with foldable frame
10. Wheel 200mm
11. (Tele)Stabilizer
12. Locking clips
Product Usage Instructions
Positioning of the Stairway Tower
- Surface: Always place the scaffolding on a stable and horizontal surface. Ensure it cannot sink into the ground. The slope of the surface should not exceed 1 degree per 4 meters of height.
- Obstacles: Position the scaffolding to avoid any dangers when descending. Check for obstacles on the ground and at height.
- Maximum Height: The maximum height varies based on the type and placement of scaffolding. Refer to Table 1 for details.
Assembly
A Stairway Tower should be constructed by at least two people. Follow the
assembly instructions provided in the manual.
Use
- Extension/Increase: Follow guidelines for extending or increasing the tower height.
- Maximum Permissible Weight: Adhere to weight limits specified by the manufacturer.
- Stabilization: Ensure the tower is stable and anchored securely as per recommendations.
- Sideboard Set: Install sideboards for added safety.
- Security: Follow safety protocols while using the tower.
- Relocation: If needed, relocate the tower following proper procedures.
- Chemical Products: Use recommended chemical products safely and as directed.
FAQ
-
What should I do in case of damage to the Stairway Tower?
If there is damage, perform a self-inspection and refer to the maintenance section for guidelines on repairs. Contact the manufacturer if needed. -
How often should I conduct inspections on the Stairway Tower?
An annual control is recommended, along with regular self-inspections to ensure the tower’s safety and stability.
Disclaimer
Disclaimer This documentation has been provided with the utmost care by ASC
Group. All rights reserved. No part of this publication may be reproduced,
stored in a retrieval system, or transmitted in any form or by any means,
electronic, mechanical, photocopying, recording, or otherwise, without the
prior written permission from ASC Group. This publication may only be used for
ASC Group products. Typesetting and printing errors reserved.
If you have any questions, please contact ASC Group:
- Leerlooierstraat 32 4871 EN Etten-Leur Nederland
- www.ASCGroup.nl
- +3176 5413019
Overview
Application
The Stairway Tower is intended to be used to provide access to other structures. This scaffold is not intended to be used to execute work. If in doubt, always consult your supplier or manufacturer; the contact information is at the front of this brochure.
List of components
- 7-rung Frame
- 4-rung Frame
- Platform without trapdoor
- Stairway
- Guardrail stairway inside
- Guardrail stairway outside
- Horizontal brace
- Diagonal brace
- Double horizontal brace with foldable frame
- Wheel 200mm
- (Tele)Stabilizer
- Locking clips
A Stairway Tower should be constructed by at least two people.
Assembly and use
Positioning of the Stairway Tower
-
Sureface
Always place the scaffolding on a stable and horizontal surface. Make sure that the scaffolding cannot sink into the ground. In addition, the general slope of the surface may not be steeper than 1 degree. So, at a height of 4 meters, the deviation may amount to a maximum of 4 cm. -
Obstacles
Position the scaffolding in such a way that no danger to the user can arise when descending. Pay attention to obstacles on the ground and/or obstacles at height. -
Maximum height
This depends on the placement and type of scaffolding (see Table 1).
Type of scaffolding | Indoors (without wind) | Outdoors (with wind) | Fixed |
---|
Stairway Tower
With Stabilizer
| 12 mtr | 8 mtr | 20 mtr
Table 1. Maximum Height.
This is the maximum platform height; it only applies to scaffolds with stabilizers (not fixed).
Anchor the tower every 4 meters. There are several possibilities for anchoring which may vary depending on the situation. The method of anchoring should always be determined on site by an expert (the most common method is steel wall anchors in combination with screw eyes).
-
Weather conditions
- Consult the weather report to determine safety in various weather conditions. Consider the following conditions and use common sense. At wind force 6 or higher a scaffold may not be used.
- Also, any materials such as canvas that are installed must be removed.
-
Precipitation
Remove snow and ice from the scaffolding before starting work. If necessary, sprinkle sand on the work floor to prevent slippage. -
Cold
Avoid using Stairway Tower at temperatures below freezing.
Personal protection equipment
- Always wear work gloves, safety shoes, and a safety helmet.
- When working at height, use a lifeline.
Assembly
Check all components (use the list of components) that are required for
assembly, are present and undamaged. Damaged components should not be used.
- For checking for damage: see section 3.
- There are no tools required for assembling a Stairway Tower. For Stairway Towers from five meters onwards, it can be useful to use a rope (with or without an accessory) to lift the components.
Assembly Instructions
- Sort the diagonal (8) and horizontal (7) braces by length. Check that all materials meet the annual inspection labels and inspect all materials for damage. If in doubt, contact ASC or your dealer with any questions. Aluminum Scaffolding must only be assembled by people with sufficient and proven experience.
- Insert the wheel uprights (10) with casters into the frame (1) (without locking pins) along the bottom edge. Apply the brakes evenly to the wheels.
- Attach a horizontal brace (6) on its side to the upright and allow the brace to rest on the ground.
- Now click the horizontal brace to the other frame, both frames will now stand.
- Place the diagonal brace (8) on the 2nd rung of the frame and click on the 6th rung of the opposite frame. A cross is now formed.
- Place the stairway (4) from the opening in the (walkthrough) frame (1) to the other frame.
- The base section must now be leveled and, if necessary, adjusted with the adjustable wheel uprights (by turning the nut) The maximum angle of inclination is 1%.
- Place the stabilizers (11) and make sure they are firmly on the ground, always place a stabilizer linkage under a rung (against shifting) It is recommended to use 4 pieces, but in any case use 2.
- Place the inner guardrail (5) on the Stairway Tower. Secure it with the locking clips.
- Place the next two frames (1) on the base frames and secure the frame with a locking clip.
- Place the guardrail outside (6) on the inside of the (walkthrough) frame.
- Place the platform (3) on the 7e rung of the base-section. The platform will be next to the stairway.
- Repeat steps 9 to 13 until the desired height is achieved. Raise the parts using a rope.
- Now install the double horizontal brace (with foldable frame) (9) next to the platform at hip and knee height.
- Finally, place the sideboard holders upright (just below the clips) on the top work floor and place the side boards (or kick edges) in the slots of the sideboard holders.
Use
Before use, please check that:
- All parts are still present
- All the parts are still properly attached
- The tower is still perpendicular
- The stairway tower is clean
- Any changes in the surroundings may affect safe use
- The brakes are working on the wheel
- The stabilizers are touching the ground
- All locking clips are correctly in place
Never use a Stairway Tower near non-insulated, electrical installations or machinery.
-
Extension/increase
Never elevate the scaffolding with a tool. Therefore, do not use stairs, ladders, crates, or steps on the scaffolding unless the stairs or ladder are intended to be part of the scaffolding. -
Maximum permissible weight
Please read on the sticker on the platform what the maximum load is. Each ASC Group scaffold may be loaded to a maximum of 200 kg/m2 and never more than 375 kg in total. This means on average: two people with (hand) tools. The maximum horizontal load is 30 kg. -
Stabilization
- Stabilizers must always be installed. Stabilizers are supplied in an adjustable version.
- They are placed on a scaffolding which is placed against a building as shown in Figure A and a freestanding scaffold as shown in Figure B.
-
Sideboard set
Sideboards are always required on the platform being worked on. -
Security
Do not leave a stairway tower unattended in a public place for an extended period. If this is nevertheless necessary, the scaffolding can be secured to a fixed object with a ring lock. To do this, put the ring lock through one of the frame’s compartments and attach an anti-climb device. -
Relocation
A stairway tower can be moved by dismantling and rebuilding it. After moving the scaffolding, it must be put back into plumb; therefore, go through the checklist again from Section 2.9.
Chemical products
Avoid contact with acids and chemical products. These can cause corrosion
to the aluminum, which can affect the strength of the aluminum.
Inspection, care, and maintenance
According to the regulations, one must work safely at heights. On an ASC Mobile Tower, it is not obligatory to wear extra fall protection (provided that the recommendations in this manual have been followed).
The Health and Safety Law
The Working Conditions Decree is a concrete elaboration of the Safe Working at
Height Act. It states that everything above 2.50 meters is ‘working at height’
and is, therefore, a situation with an increased risk of injury. This also
means that all materials must be properly manufactured and checked in a
quality cycle. ASC tests all materials and performs strength calculations. The
user must also have the material inspected annually for defects.
-
Annual control
Your ASC Mobile Tower must be inspected for any defects annually by an expert. The ASC Group can perform this control for you. -
Self-inspection
The ASC Mobile Tower can be inspected by yourself. Before each use, always check the components for any damage. We certainly recommend larger companies to do a monthly inspection of all components of the Mobile Towers and to record this inspection. If you are in doubt about damage, consult an accredited inspector. -
Damages
Examples of the most common damages on aluminum scaffolding;- Components: if a claw or a sport is loose, the mobile scaffolding must be rejected.
- Dents and or holes: if there is a big dent in the aluminum or even a crack or hole, the scaffolding must be rejected.
- Contamination: if there is too much concrete, paint, or other non-removable contamination on the components, the scaffolding must be rejected; after all, you can no longer judge whether the components are still intact.
-
What to do in the event of damage
If there is any damage, that cannot be repaired, the component must be taken out and replaced. If repairing is possible, please contact ASC Group for further information.
Repair
Repairing a component must be carried out by a certified body or person.
Transport
- Always transport the components under the locally applicable legislation.
- Stack the components correctly for transport; never place the heavy components on top.
- Transport the components of a scaffolding, preferably standing, f.e in a carrier.
- Handle the material with care. Do not drop components onto a hard surface; this can reduce the quality of the material.
Maintenance
- Make sure the scaffolding material is clean, especially the connecting pins. The frames should go in and out easily.
- Make sure the pawl of the hook of the diagonal and horizontal braces is clean. If necessary, lubricate it with a little oil. The same applies to the wheel spindle.
- Replace missing and broken parts in time.
Storage
Store components of the scaffolding preferably in a dry, clean, dark, and
frost-free place.
All rights reserved. Nothing herein should be stored in an automated database or made public in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without prior permission from ASC Group. This publication may only be used for ASC products.
ASC Group
- Leerlooierstraat 32 4871 EN Etten-Leur Nederland
- www.ASCGroup.nl
- +3176 5413019
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>