Jaypro Spts FBLC-30 Lowdown Linemen Chute Instruction Manual
- August 31, 2024
- Jaypro Spts
Table of Contents
Jaypro Sports FBLC-30 Lowdown Linemen Chute
Introduction
- This user guide describes how to assemble Models FBLC‐30 and FBLC‐20 Linemen Chutes. The user guide is written for experienced mechanical contractors or technicians.
- If you need additional information or support to assemble your Linemen Chute you can reach the Jaypro Sports customer support team, Monday through Friday, 8 AM to 5 PM Eastern Time at 1‐800‐243‐0533.
Important Safety Precautions and Use Instructions
- When adjusting the frame height hold the handle to pull the pin. Caution, there is a lot of weight on each leg, keep hands and fingers clear of the inner leg when raising or lowering.
- Adjust the chain lengths to angle the stretcher frame. Let the chain out to lower one side and shorten the other to raise the opposite side.
- Moving the Linemen Chute requires (2) two people, one on each end.
- No one should ever be allowed to climb on any part of the equipment. Special care should be taken to ensure it is never used as a trampoline or balance beam.
- When not in use place in a secure location to avoid misuse such as climbing.
- Any use other than what is intended by the manufacturer can be dangerous.
Assembly Precaution
- The Linemen Chute components are heavy and require at least two people to assemble.
- To maintain control and prevent injury when moving heavy components, ensure you have a sufficient number of technicians to support the components without dropping them.
Equipment and Materials
Gather the following user‐supplied equipment and materials:
- Wrenches and sockets 9/16 and ¾ inch
- Open-ended 15/16 inch wrench
- Thread lock
- White Lithium Grease
- Optional scaffolding (enough components to make two levels)
Before You Start Assembly
- Unpack all parts and check against the parts list to ensure that all parts have been included.
- Inspect all parts for damage. Report any damages to the trucking company.
- Find an area that is open and flat to assemble your Linemen Chute.
- The scaffolding that is listed with the tools needed to assemble the Linemen Chute is used to support the load bars during assembly. The load bars weigh approximately 200 pounds and if scaffolding is not available, you will need some type of support to keep the load bar raised at between 50 and 60 inches while the two halves of the load bar are assembled and then while the end frames are assembled to the load bar. (SEE FIGURE ‐1)
End Frame Assembly
Assemble both end frames. With the end frame lying on the ground make the assembly of the frame to the legs. Lightly grease the inner legs using lithium grease. When installing the spring lock (FIGURE 5) use Thread Lock to secure the handle to the spring lock.
DO NOT ATTACH WHEELS TO SIDE FRAMES AT THIS TIME (SEE STEP 8)
ITEM | QTY | DESCRIPTION |
---|---|---|
1 | 2 | 2 in x 8 in END FRAME |
2 | 2 | LEFT LEG MNTG PLATE |
3 | 2 | RIGHT LEG MNTG PLATE |
4 | 4 | LEG MOUNTING PLATE |
5 | 4 | OUTER LEG |
6 | 4 | INNER LEG |
7 | 8 | ½‐13 PLOW BOLT |
--- | --- | --- |
8 | 16 | ½‐13 x 3-inch HEX BOLT |
9 | 16 | ½‐13 FLANGE NUT |
10 | 4 | HANDLE |
11 | 4 | SPRING LOCK PIN |
12 | 4 | SQUARE BLACK CAP |
13 | 4 | 5/8‐11 HEX JAM NUT |
Frame Assembly
Assemble the frame as shown here in steps 7 through 7c, attach the hardware loosely, and make snug once all parts have been attached and squared up.
ITEM | QTY | DESCRIPTION |
---|---|---|
1 | 2 | END FRAME |
2 | 2 | LOAD BAR |
3 | 4 | BRACE |
4 | 12 | ½‐13 HEX NUT |
5 | 10 | ½‐13 FLANGE NUT |
6 | 2 | ½‐13 EYENUT |
--- | --- | --- |
7 | 4 | ½‐13 x 1 ½ inch HEX BOLT |
8 | 4 | ½‐13 x 3 ½ inch HEX BOLT |
9 | 6 | ½‐13 x 3-inch HEX BOLT |
10 | 16 | ½ inch SPLIT WASHER |
11 | 24 | ½ inch FLAT WASHER |
Assemble Load Bar
With the load bars approximately level with each other and sitting on top of
the scaffolding between 50 and 60 inches assemble the two halves. (SEE FIGURE
7)
Note: the J‐Hooks welded to the load bars should be located at the far
ends of the load bar assembly with the J‐HOOKS open ends facing up.
(FIGURE‐17)
Load Bar to End Frames
Before lifting the end frame to connect to the load bar extend the inner legs
out so that when the frame is stood up, the frame and the load bar will be at
the same height.
This will make the assembly easier and eliminate the need for the helpers to
lift all of the weight of the end frame while the hardware is assembled. (SEE
FIGURE 8)
Brace Assembly
Assemble all four braces to the frame and load bar. (SEE FIGURES 9 & 10) Retracting the legs will help when fitting the braces to the Load Bar.
Wheel Assembly
- With the scaffolds still be in place raise the legs and attach the wheels. (SEE FIGURE 11) When the wheels have all been attached extend the legs so that the weight of the Linemen Chute is now on the wheels and off the scaffolds.
- NOTE: Maintaining the proper tire inflation makes moving the Linemen Chute less difficult, the tires should be inflated to 50 PSI. The scaffolds can now be removed.
ITEM | QTY | DESCRIPTION |
---|---|---|
1 | 4 | INNER LEG |
2 | 4 | 12-INCH SWIVEL WHEEL |
3 | 16 | 3/8‐16 x 1 ¼ inch HEX BOLT |
4 | 4 | 3/8‐16 x 2 ¼ inch HEX BOLT |
5 | 32 | 3/8 inch FLAT WASHER |
6 | 20 | 3/8‐16 inch LOCKNUT |
Stretcher Frame Assembly
Assemble the stretcher frame (FIGURES 12a OR 12b) on the ground. See Figures
13, 14, and 15 for connections. Hang the frame from the load bar before
attaching the screen.
(SEE FIGURES 16, 17and 18) The screen is attached under the stretcher frame
and after stretcher frame is attached to the load bar.
MODEL FBLC-30 STRETCHER
ITEM | QTY | DESCRIPTION |
---|---|---|
1 | 2 | U‐SHAPED SPREADER PIPE |
2 | 4 | SWAGED PIPE (120 inches) |
3 | 2 | CENTER PIPE (106 ½ inches) |
4 | 3 | SPREADER PIPE (59 ½ inches) |
5 | 12 | 1.9 in CARRIAGE CLAMP |
6 | 12 | 3/8‐16 x 2 ¾ CARRIAGE BOLT |
7 | 6 | 3/8‐16 EYE NUT |
8 | 6 | 3/8‐16 NYLOCK NUT |
9 | 8 | 5/16‐18 x 2-inch BUTTON HEAD |
10 | 8 | 5/16‐18 CURVED FLANGE NUT |
MODEL FBLC-20 STRETCHER
ITEM | QTY | DESCRIPTION |
---|---|---|
1 | 2 | U‐SHAPED SPREADER TUBE |
2 | 2 | SWAGED BOTH ENDS PIPE ( 112 inches) |
3 | 2 | SWAGED ONE END (111 inches) |
4 | 3 | SPREADER PIPE (59 ½ inches) |
5 | 12 | 1.9 in CARRIAGE CLAMP |
6 | 12 | 3/8‐16 x 2 ¾ in CARRIAGE BOLT |
7 | 6 | 3/8‐16 EYE NUT |
8 | 6 | 3/8‐16 NYLOCK NUT |
9 | 4 | 5/16‐18 x 2 in BUTTON HEAD |
10 | 4 | 5/16‐18 CURVED FALNGE NUT |
Stretcher to Load Bar
The stretcher frame is attached to the Load Bar with a chain and quick links
as shown below. The chain allows for some adjustability in the height between
the sides of the stretcher frame.
When horizontal with the ground the stretcher frame should be 12 inches from
the load bar.
Attach Screen to Stretcher Frame
- Using the bungee balls supplied start by putting only one bungee ball close to the center of each of the short sides, and two or three equally spaced on each long side.
- Then working around the frame install the remainder of the bungee balls. Roll the ball up over the frame so that it rests on the top side of the screen. (SEE FIGURE 19)
Safety Padding
- After completing the installation of bungee balls all around the stretcher frame install the Safefoam Padding. Start by padding the inside spreader pipes before attaching the parameter padding.
- The padding can be cut with a razor knife and three 30-degree notches cut at the inside corners will help the padding turn the corner (SEE FIGURE 20). The padding is secured with zip ties at approximately 18 to 24 inches apart.
Maintenance and Care
- The Linemen Chute is designed for many years of safe use. It is important that when moving the equipment that it be done with at least one person on each end to ensure that the wheels do not get stuck causing damage to the frame.
- No one should ever be allowed to climb on any part of the equipment. Special care should be taken to ensure it is never used as a trampoline or a balance beam.
- Any use other than what is intended by the manufacturer can be dangerous.
- During the offseason, the padding and screen should be removed and stored in a dry area. The Linemen Chute should be stored in a secure area that will not invite missing or climbing.
- Before putting into service each year all connections should be checked, the inner leg tubes should be lubricated as necessary with lithium grease, and the tire pressures should be maintained at 50 PSI. Any parts that show excessive wear or damage should be replaced before beginning use. For replacement parts contact your dealer or the Jaypro Customer Support Team, Monday Through Friday, 8 AM to 5 PM Eastern Time at 1‐800‐243‐0533 or on the web at www.japro.com.
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>