Specialized Construction Products Thermahsell Caviteclad System Instruction Manual
- August 19, 2024
- Specialized Construction Products
Table of Contents
Thermahsell Caviteclad System
“`html
Product Information
Specifications
- System: Caviteclad
- Appraisal: BRANZ Appraisal No. 510 (2019)
- Compatible Substrates: EPS, XPS, Kooltherm K5, Thermahsell
- Supplier: Specialized Construction Products or certified
distributors
Product Usage Instructions
1. Introduction
The Caviteclad System is approved for use in New Zealand and
must be installed following the construction sequence outlined in
the manual. Ensure to read this guide along with the detail data
sheets for proper installation.
2. Health & Safety
Prioritize safety during installation. Use appropriate personal
protective equipment and follow all safety guidelines provided by
the manufacturer.
3. Framing Set Out (Timber or Steel)
Comply with NZS 3604 for timber framing within scope limitations
or follow specific design requirements for areas outside the scope
of NZS 3604.
FAQ
Q: Can I use other flashings instead of the recommended uPVC
head flashings?
A: If proprietary uPVC head flashings cannot be used, an
acceptable alternative flashing must be provided. Contact
Specialized Construction Products for guidance on suitable
alternatives.
“`
Caviteclad Installation Manual
1. Introduction
This Installation Manual is for the installation of Specialized Construction
Products Caviteclad Exterior Insulation and Finishing System. The Caviteclad
system is made up of 50mm Neopor® EPS, XPS, Kooltherm K5 sheets or 75mm
Neopor® Thermahsell sheets that are fixed to timber or steel framing over the
surface of a 20mm cavity. The chosen backing substrate is then overcoated and
reinforced with a range of specially blended proprietary cement or acrylic-
based plasters before the walls are finished with a finishing plaster chosen
from Specialized Texture range or Dulux Acratex Acrylic Texture range and
painted with Dulux Acratex 955 Acrashield Advance acrylic paint system.
The Caviteclad System has been tested and appraised for use throughout New
Zealand. BRANZ Appraisal No. 510 (2019).
This Manual has been set out as near as possible to the actual construction
sequence. Preparation, fixing the chosen substrate to various types of framing
and backgrounds, sealing the joinery and masking out, preparation of
polystyrene prior to plastering and finally the plaster techniques and
sequences. This guide must be read in conjunction with the detail data sheets
for the Caviteclad System.
The Caviteclad EPS, XPS, Kooltherm K5 and Thermahsell System can also be
bonded or mechanically fixed to concrete or masonry walls (Note: This
application is outside the scope of the BRANZ Appraisal).
All the PVC flashings, fibreglass mesh, resin, fixings, and plaster components
used for the Caviteclad System must be supplied by Specialized Construction
Products or one of its certified distributors.
2. Health & Safety
Avoid contact with eyes and prolonged contact with skin. Wash thoroughly after
handling all wet or dry material. In case of eye contact, flush immediately
with running water for at least 15 minutes. Consult a physician immediately.
Do not take internally. The potential irritant nature of cement dust (in dry
powder form or from subsequent cutting of the hardened product) is recognised.
Paper dust masks or a respirator must be worn at all times when the product is
being mixed. Be sure to provide adequate ventilation when working in enclosed
areas. The wet compound is alkaline and prolonged skin contact should be
avoided. People with sensitive skin must wear rubber gloves when handling the
product. Materials Safety Data Sheets are available on request.
3. Framing Set Out (Timber or Steel)
Timber framing must comply with NZS 3604 for buildings or parts of buildings
within the scope limitations of NZS 3604. Buildings or parts of buildings
outside the scope of NZS 3604 must be to a specific design in accordance with
NZS 3603 and AS/NZS1170.
1
In all cases, studs must be set out at 600mm maximum centres for buildings
designed to NZS 3604 in Wind Zones up to and including Very High, and at 400mm
maximum centres for buildings situated in NZS 3604 Wind Zone Extra High and
specifically designed buildings situated in Wind Zones above NZS 3604 defined
Extra High. Dwangs/nogs must be flush fitted at maximum 800mm centres. Edge
fixing for the EPS sheets must be provided. All soffit junctions, openings,
wall/ roof junctions and foundation details must have support for the sheet
edges. Timber framing must have a maximum moisture content of 24% at the time
cladding commences. For steel framing the minimum framing specification is `C’
section studs and nogs of overall section size 75mm web and 32mm flange. Steel
thickness must be a minimum of 0.55mm. As per the guidelines of NZS 4214:2006
the thermal calculation for the 50mm Caviteclad System installed over a 20mm
cavity which is attached to the surface of a wall incorporating an R=1.8 wall
batt.
4. Building Wrap
All external walls of buildings must have barriers to airflow in the form of
interior linings with all joints stopped for wind zones up to and including
Very High. Unlined gables and walls must incorporate a rigid sheathing or an
air barrier which meets the requirements of NZBC Acceptable Solution E2/AS1,
Table 23. For attached garages, wall underlays must be selected in accordance
with NZBC Acceptable Solution E2/AS1, Paragraph 9.1.3.4. Flexible wall
underlay shall be building paper complying with NZBC Acceptable Solution
E2/AS1 Table 23, or breather-type membranes covered by a valid BRANZ Appraisal
for use as wall underlays. Rigid wall underlay shall be plywood or fibre
cement sheet complying with NZBC Acceptable Solution E2/AS1 Table 23, or rigid
sheathing covered by a valid BRANZ Appraisal for use as rigid air barrier
systems. The selected building underlay and flexible sill and jamb tape system
must be installed by the building contractor in accordance with the underlay
and tape manufacturer’s instructions prior to the installation of the cavity
battens and the rest of the Caviteclad System. Flexible building underlay must
be installed horizontally and be continuous around corners. Underlay must be
lapped 75mm minimum at horizontal joints and 150mm minimum over studs at
vertical joints. Generic rigid sheathing materials must be installed in
accordance with NZBC Acceptable Solution E2/AS1 and be overlaid with a
flexible wall underlay. Particular attention must be paid to the installation
of the building underlay and sill and jamb tapes around window and door
openings to ensure a continuous seal is achieved and all exposed wall framing
in the opening is protected. Where studs are at greater than 450mm centres and
a flexible wall underlay is being used, a building underlay support must be
installed over the underlay at maximum 300mm centres horizontally.
5. Head Flashings
Proprietary uPVC head flashings with minimum ventilation openings of 1000mm2
per lineal metre must be installed over all window heads and door openings. If
proprietary uPVC head flashings cannot be used, an acceptable alternative
flashing must be provided. Please contact Specialized Construction Products
for advice.
6. Flashing in General
Joists designed to carry decks need to have a continuous flashing fitted
before the Caviteclad is fixed. Check if there are any special back-flashings
required where the Caviteclad joins another substrate or curtain wall
construction
2
7. Roofing & Window Setout
Where areas over roofs need to be plastered, the roof/wall flashing must be
installed prior to the commencement of cladding. To ensure the proprietary
flashings for this system can be installed correctly, please allow a gap of
24mm from the surface of the building paper to the backside of the aluminium
joinery.
8. Pipes & Meter Boxes
It is critical that pipes are flashed appropriately in accordance with E2/AS1
fig 68. All pipes must have the building underlay turned to the outside of the
building and have the building underlay taped to the outside of the pipe. All
pipes must have a downward rake of a minimum of 5º and must be sealed in place
using MS Sealant or another approved equivalent both before plastering and
after the installation of the base coat. All meter boxes must be correctly
flashed in accordance with the detailed drawings for the Caviteclad EPS
System. Particular attention to detail and workmanship must be given to the
weatherproofing details contained in the technical literature relating to
flashing and sealing building penetrations or junctions with other building
materials. All junctions between the Caviteclad EPS substrate and dissimilar
materials must be correctly flashed and sealed with MS Sealant or another
approved equivalent. The sealant must be installed in strict accordance with
the manufacturer’s requirements and must be left to properly cure prior to
plastering.
9 Preparation of Masonry and Concrete Surfaces (For direct fix applications)
Note: This application is outside the scope of the BRANZ Appraisal. All
surfaces to receive a direct bonded application of the Caviteclad System must
be clean and free of debris, dirt and dust, efflorescence, grease, oils,
curing agents, cleaning solutions, mould and algae or any other contaminants
that may affect adhesion. Painted or glossy surfaces must be specially treated
prior to the application of any plaster material, please refer to Specialized
Construction Products for specialist advice before you proceed. All cracks
that may be the subject to ongoing movement must be correctly repaired and
reinforced. Some smooth, dense concrete surfaces must be slush coated before
the application of the Caviteclad bonding plaster to ensure suitable adhesion
is created, please refer to Specialized Construction Products for specialist
advice before you proceed. Tilt slab and other precast concrete items should
be cleaned with Dulux Acratex 400/4 Tilt-Wash to ensure any mould release
agents are removed before the plaster is applied. All very porous surfaces
should be sealed with Dulux Acratex 501/10 Green Render Sealer prior to the
application of the bonding plaster. Failing to correctly prepare the masonry
substrate, may affect the aesthetic appearance of the finished wall. Do not
wet down masonry surfaces before plastering and do not apply base coat plaster
to surfaces that are wet from rain or overnight dew.
10. Scaffolding
Don’t accept second best. You need a continuous freestanding scaffold at least
300mm clear of the framing. Movable frames can be used, but you need enough to
complete one whole wall at one time.
3
11. Fitting Caviteclad Battens
Caviteclad battens are manufactured from high density (Class H) expanded
polystyrene with an approximate density of 24kg/m³ and measure 21mm x 50mm.
All battens must be stapled to the framing or alternatively glued to the
chosen building underlay in accordance with the batten layout shown in the
detail data sheets.
Additional vertical battens are required at internal and external corners and
openings. At the soffit the airflow must be blocked off and gables must be
lined or incorporate an air barrier which meets the requirements of NZBC
Acceptable Solution E2/AS1, Table 23. Non-rigid air barriers must have an air
resistance of 0.1 MN s/m3. Where rigid sheathings are used, the fixing length
must be increased by a minimum of the thickness of the sheathing. Horizontal
battens must be a maximum length of 100mm long in accordance with the
requirements of NZBC Acceptable Solution E2/AS1, Paragraph 9.1.8.2(f) and must
be stapled or adhered into place on all noggins/dwangs where required for
fixings with a minimum of a 5-degree angle on the top edge. The fewer
horizontal battens that are used the better.
12. Fitting Sill and Jamb Flashings
The use of the Caviteclad uPVC sill and uPVC Jamb flashings is MANDATORY. It
is also MANDATORY that the sill and jamb flashings are joined in the corner
with a Specialized Construction Products Caviteclad corner socket.
13. Installing the Specialized PVC flashing kit with Cavity Jamb Flashings
Begin by marking and cutting your sill flashing so that it extends
approximately 4-5mm past either end of the aluminium joinery (i.e., overall,
approximately 8-10mm wider than the window). Once the sill is cut, wipe the
left-hand end with PVC solvent welding cement and slide it onto the prongs of
the corner socket. Next wipe the right-hand end with PVC solvent welding
cement and slide on the right-hand corner socket. Slide the sill and socket
combo into place under the window flange and staple it into place at the
corner socket. Next cut your jamb flashings 25mm longer than the length of the
window and cut the capillary lip off the top so that the top edge of the
capillary lip will finish flush with the top of the joinery when it is slid
into place (i.e., overall, the jamb should protrude approximately 40mm above
the top of the window). Once the jambs have been cut and test fitted, choose
one side, and wipe the top of the corner socket with PVC solvent welding
cement. Immediately tuck the capillary lip of the jamb flashing behind the
flange of the joinery and slide the jamb down into place onto the top of the
socket and then repeat the same set of instructions for the other side. When
the jambs are in place, cut your head flashing approximately 6mm wider than
the joinery. Remove tape from head flashing adhesive strip and install to
joinery head, staple rubber back to building wrap. Using MS Sealant, seal the
ends of the head flashing to the jamb flashing. Install head flashing tape
over the head flashing building wrap junction and extend the tape on to jamb
flashing on either side to form a stop end. Ensure the head flashing tape laps
on to the jamb flashings by 40mm to form an adequate stop end. Once all the
flashings are in place seal the jamb flashing to the joinery in the 5mm gap
provided by the small block on the jamb flashing and then seal the corner
socket to sill flashing. You must also run a bead of sealant along under the
joinery to seal the vulnerable gap where the sill flashing meets the joinery.
Where joinery weep holes are on the bottom of the joinery rather
4
than the front, do not seal to the sill where the weep holes are situated.
(I.e., leave a 20mm gap in the sealant). When installing the female portion of
the head flashing, ensure you seal the junction between the two flashings
after installed and before plastering and painting.
14. Installing the Specialized PVC flashing kit with Sticky Jamb Flashings
Begin by marking and cutting your sill flashing so that it extends
approximately 4-5mm past either end of the aluminium joinery (i.e., overall,
approximately 8-10mm wider than the window). Once the sill is cut, wipe the
left-hand end with PVC solvent welding cement and slide it onto the prongs of
the corner socket. Next wipe the right-hand end with PVC solvent welding
cement and slide on the right-hand corner socket. Next cut your sticky jamb
flashings 25mm longer than the length of the window and cut the capillary lip
off the top so that the top edge of the capillary lip will finish flush with
the top of the joinery when it is slid into place (i.e., overall, the sticky
jamb should protrude approximately 40mm above the top of the window). Once the
sticky jambs have been cut and test fitted, choose one side, and remove the
sticky cover tape. Immediately tuck the capillary lip of the jamb flashing
behind the flange of the joinery and install the sticky jamb flashing with the
bottom starting 15mm up from the bottom of the joinery and then repeat the
same set of instructions for the other side. Next wipe PVC solvent welding
cement on both spikes of the corner socket of the sill and socket combo and
slide the spikes into the bottom of the sticky jamb flashings thus installing
the sill and corner socket combo into position under the window flange sill.
When the sticky jambs and sills are in place, cut your head flashing
approximately 6mm wider than the joinery. Remove tape from head flashing
adhesive strip and install to joinery head, staple rubber back to building
wrap. Install an EZpanel batten to the side of the sticky jamb flashing to
provide support for forming a stop end. Using MS Sealant, seal the ends of the
head flashing to the sticky jamb flashing. Install head flashing tape over the
head flashing building wrap junction and extend the tape on to the sticky jamb
flashing on either side to form a stop end. Ensure the head flashing tape laps
on to the sticky jamb flashings by a 40mm to form an adequate stop end. Once
all the flashings are in place seal the jamb flashing to the joinery in the
5mm gap provided by the small block on the jamb flashing and then seal the
corner socket to sill flashing. You must also run a bead of sealant along
under the joinery to seal the vulnerable gap where the sill flashing meets the
joinery. Where joinery weep holes are on the bottom of the joinery rather than
the front, do not seal to the sill where the weep holes are situated. (I.e.,
leave a 20mm gap in the sealant). Sealing around windows is one of the most
critical operations for the success of the Caviteclad system. The data sheets
detail in pictorial terms how the instruction above should be carried out.
Follow these details implicitly.
Basic principles to apply when sealing your windows: · Don’t be mean with your
application of sealant. All beads of sealant must be 5mm across. · The sealant
has to have a reasonable area to seal against and be installed over a bond
breaker as per manufacturer’s instructions. · Always lightly tool or spread
your sealant into place with your finger. (All ways wear gloves)
5
15. Soffits
Soffits shall be fixed into place before the cladding is installed and
allowance made to close off the cavity with framing or battens to stop airflow
into the roof space. After the mesh and plaster system has been completed a
5mm bead of MS Sealant or `no more gaps’ should be installed at the soffit
Caviteclad intersection. In the case of reverse raking soffits, a flashing or
piece of Protecto EIFS tape shall be provided in accordance with the details
shown in the technical literature. To ensure the system is not affected by
timber shrinkage in areas that are not traditionally lined (e.g., gable ends),
it is highly recommended that the internal walls of these areas are adequately
braced with a thin sheet of plywood or an alternative bracing material.
Alternatively, the timber in these areas must have a moisture content of no
greater than 18% and must remain that way throughout the entire construction
process.
16. Fixing 50mm Neopor EPS or K5 Sheets
All vertical sheet edges must be supported and fixed through the cavity
battens to the framing. The sheets must be butt jointed except at corners
where one sheet may overlap the other to form a straight finish. Horizontal
sheet edges must be supported at fixing locations with cavity spacers a
maximum of 100mm long in accordance with the requirements of NZBC Acceptable
Solution E2/AS1, Paragraph 9.1.8.2(f). At the base of walls, the finished
level of the substrate must be at least 50mm below the supporting framing.
Additional framing will be required at soffits, internal and external corners
and window and door openings for the support and fixing of sheet edges. All
sheet joints and edges must be supported. The only exception to this rule is
at the base where the sheets can hang 50mm below the supporting frame.
Construction joints are needed in walls longer than 20 metres or higher than
two stories. This doesn’t apply to two storey houses with gable ends.
Construction joint details are provided in the drawings provided with the
system. Inter-storey drained joints must be provided for walls over two
storeys or 7m in height in accordance with the requirements of NZBC Acceptable
Solution E2/AS1, Paragraph 9.1.9.4. Inter-storey junctions must be constructed
in accordance with the technical literature. All gaps between the EPS sheets
must be flush filled with adhesive spray foam prior to the base coat plaster
being applied. Any oxidization on the surface of the EPS must be removed with
a stiff broom and water, and then the cleaned surface must be scratched to
provide a key before plastering begins.
17. Fixing 50mm XPS or Thermashell Sheets
Sheets must be installed horizontally. Vertical and horizontal sheet joints
must be bonded with Specialized EZfix PU Glue during installation. Vertical
sheet edges sheet edges may be jointed on-stud or off-stud. Horizontal sheet
edges do not require edge fixing, except at soffits and window and door
openings where additional framing will be required for the support and fixing
of sheet edges. Vertical sheet joints must be staggered by a minimum of 200mm
in each row. Thermashell sheets must be supported at fixing locations with
vertical cavity battens or cavity spacers that comply with the requirements of
NZBC Acceptable Solution E2/AS1 Paragraph
6
9.1.8.2 f. The detail at the base of the wall must comply with the
requirements of NZBC E2/AS1 figure 125. Construction joints are needed in
walls longer than 20 metres or higher than two stories. This doesn’t apply to
two storey houses with gable ends. Construction joint details are provided in
the drawings provided with the system. Inter-storey drained joints must be
provided for walls over two storeys or 7m in height in accordance with the
requirements of NZBC Acceptable Solution E2/AS1, Paragraph 9.1.9.4. Inter-
storey junctions must be constructed in accordance with the technical
literature. All gaps between the EPS sheets must be flush filled with adhesive
spray foam prior to the base coat plaster being applied. Any oxidization on
the surface of the EPS must be removed with a stiff broom and water, and then
the cleaned surface must be scratched to provide a key before plastering
begins.
18. Timber Framing There are four categories listed in NZS 3604: Low, Medium,
High and Very High. The “Building Wind Zone” for the job to be completed must
be clearly understood before the application of any plaster.
19. Caviteclad 50mm EPS and K5 Fasteners (Timber frame)
The EPS/K5 sheets are fixed through the cavity battens and spacers to the
studs with 100 x 4mm hot-dipped galvanised nails topped with 42mm Specialized
Construction Products “polyfasteners”. Caviteclad/K5 sheets must be fixed
through the cavity battens and cavity spacers to the wall framing at maximum
centres specified in table 1 and table 3. (Note: All nails must be fixed with
an edge clearance of minimum 10 mm and the framing must be specifically
designed with a minimum framing size of 90 x 45 mm Grade MSG8.) All openings
should be either nailed or screwed off at 200mm maximum centres. This ensures
any possible movement between the joinery frame and the finished Caviteclad
system is greatly reduced. Screw fixings should be 100mm x 10-gauge AS 3566
Corrosion Class 4, hot dipped galvanised, countersunk, square drive with 42mm
diameter washed, or 100mm x 10-gauge Grade 304 Stainless, countersunk, square
drive screws with 42mm washers.
20. 75mm EPS Fasteners and 50mm XPS (Timber frame)
The Thermashell sheets are fixed through the cavity battens and spacers to the
studs with 8g x 120 mm AS 3566 Corrosion class 4 hot-dipped galvanised wood
screws in NZS 3604 Exposure zones B, C and D or 120mm x 10-gauge Grade 304
Stainless, countersunk, square drive screws topped with 42mm Specialized
Construction Products polypropylene washers as specified in table 2 and table
3 below. All openings should be screwed off at 200mm maximum centres. This
ensures any possible movement between the joinery frame and the finished
Thermashell system is greatly reduced.
7
21. Steel Framing
The same fixing centres apply as for timber framing. Use Specialized
Construction Products 42mm “polyfasteners” and self- drilling AS 3566
Corrosion Class 4, 6-gauge screws in NZS 3604 defined Exposure Zones B, C and
D. The screw length must allow a 10mm minimum penetration through the steel
framing.
22. Concrete & Masonry
(Note: This application is outside the scope of the BRANZ Appraisal.) To bond
the EPS, XPS and K5 sheets to masonry surfaces, mix up Specialized
Construction Products fine base coat plaster with the addition of 1 litre of
Specialized Construction Products resin per bag. Cut the substrate to size and
check the fit. Apply the fine base coat plaster to the back of the sheet with
a grooved trowel around the perimeter and in vertical strips every 400mm.
Masonry anchors must be used to hold the sheets in place while the plaster is
drying and to provide a mechanical fix for the EPS, XPS & K5.
8
23. PVC Beads
All exposed corners and bottom edges must be protected by gluing on the
appropriate uPVC section. The beads are glued on with Maxilam Sabrefix PS
Adhesive
24. Stopping Up Prior to Mesh Coating
Once the chosen substrate has been correctly fixed into place, a two-metre
straight edge should be used to check the walls are flat. Durarasp should be
used to sand off any large irregularities. To avoid the potential of `post
plastering’ shrinkage it is highly recommended that the sheet edges are
stopped with fine mesh coat plaster and left to dry before plastering
commences. Once the surface is flat and true, all nail holes and uPVC
extrusions should be stopped with a layer of fine mesh coat plaster. This will
help to ensure that any shrinkage in any subsequent coats is kept to a
minimum. Only once the walls are flat and true and have been well stopped
should mesh coating commence.
There are two options to choose from. Cement base coat with cement-based
texture finishes or acrylic textures finishes. Acrylic base coat (Powaflex)
with acrylic textured finishes
25. Cement base coat with cement-based texture finishes or acrylic texture
finishes. Mesh Coating
The areas around all penetrations should be completed first by using Fine Mesh
Coat imbedded in soft flexible 160g/m2 alkali resistant mesh to all reveals. A
piece of soft mesh must be used to reinforce the head, sill and jamb flashing
onto the surface of the panels and in the corner of any penetration where the
sills and jambs meet. Once all penetrations and awkward areas have been
completed all the flat areas of wall should be done using a 160g/m2 alkali
resistant hard mesh embedded in Coarse Mesh Coat. Drops of hard mesh do not
have to overlap but should be tightly butt joined. If the mesh isn’t going to
be overlapped any butt join that is created must offset any vertical join in
the panels by a minimum of 150mm.
26. Cement Based Finishing Texture Options
There are ten finishing options once the Coarse Mesh Coat base coat plaster
and mesh have been applied: Option 1: Stucco Texture Fine base coat plaster
can be sprayed through a hopper gun or a sagola gun to achieve a heavy stucco
plaster finish. Option 2: Float Finish Float Finish is a polymer modified
cement-based plaster which is polished flat to achieve a fine granular finish.
The smooth plaster will not cover up background imperfections, particularly
when walls are subject to side lighting at certain times of the day. Option 3:
Spanish Finish Spanish Finish is a polymer-modified, cement-based plaster used
to achieve an undulating adobe style finish. This product can be applied in
various thicknesses and using a number of different techniques. Before finish
coating begins ensure the style of finish that is desired has
9
been correctly communicated and understood by the plasterer. A trial sample is
highly recommended. Option 4: Fine Spray Texture Spray texture is a granular
plaster designed to give a fine stippled appearance. Spray texture is best
applied using a Sagola gun with a 6mm tip and with the compressor set at
approximately 60psi.
27. Acrylic Based Finishing Texture Options
Note: When using acrylic textures over a modified cement base, seal the cement
base with one coat of Acratex 501/10 Green Render Sealer prior to applying the
acrylic texture.
Option 5: Acratex 951 Coventry Coarse Acrylic Texture – 15L Option 6: Acratex
951 1mm Super Trowel Acrylic Texture – 15L Option 7: Acratex 951 Sienna Coarse
Sand Finish Acrylic Texture – 15L Option 8: Acratex 951 Sienna Natural Acrylic
Texture – 15L Option 9: Specialized FlexiFloat – 20kg (This product is a
bagged texture and not tintable) Option 10: Specialized FlexiFlat -20kg (This
product is a bagged texture and not tintable)
Acrylic textures are to be mixed thoroughly with a stirrer before application.
The consistency can be adjusted by adding a little bit of water. Acrylic
textures are to be applied to the entire surface with a rust-free steel trowel
or sprayed on with a suitable plaster machine, levelled to grain thickness and
rubbed with a plastic plasterer’s float. Do not mix with other substances.
Work evenly and without interruption. during processing and setting. Protect
façade against direct solar radiation, rain, or strong wind (e.g., scaffolding
protection net). High temperatures during summer shorten the drying time and
can lead to untimely drying out of the plaster. Air, material, and subsurface
temperatures have to be higher than +5 degrees Celsius
28. Acrylic base coat with acrylic texture finishes – Powaflex Acrylic System
Mesh coat.
The areas around all penetrations should completed first using Powaflex
imbedded in soft flexible 160g/m2 alkali resistant mesh to all reveals. A
piece of soft mesh must be used to reinforce the head flashings, jambs, and
sills onto the surface of the panels and in the corner of any penetration
where the sills and jambs meet. Once all penetrations and awkward areas have
been completed all the flat areas of wall should be done using a 160g/m2
alkali resistant hard mesh. Drops of hard mesh do not have to overlap but
should be tightly butt joined. If the mesh isn’t going to be overlapped any
butt join that is created must offset any vertical join in the panels by a
minimum of 150mm. Warning: Only acrylic textures should be applied over
Powaflex acrylic system
29. Acrylic Based Finishing Texture Options
Below are the options once the Powaflex Base Coat has been applied: Option 5:
Acratex 951 Coventry Coarse Acrylic Texture – 15L Option 6: Acratex 951 1mm
Super Trowel Acrylic Texture – 15L Option 7: Acratex 951 Sienna Coarse Sand
Finish Acrylic Texture – 15L
10
Option 8: Acratex 951 Sienna Natural Acrylic Texture – 15L Option 9:
Specialized FlexiFloat – 20kg (This product is a bagged texture and not
tintable) Option 10: Specialized FlexiFlat -20kg (This product is a bagged
texture and not tintable)
Acrylic textures are to be mixed thoroughly with a stirrer before application.
The consistency can be adjusted by adding a little bit of water. Acrylic
textures are to be applied to the entire surface with a rust-free steel trowel
or sprayed on with a suitable plaster machine, levelled to grain thickness and
rubbed with a plastic plasterer’s float. Do not mix with other substances.
Work evenly and without interruption. during processing and setting. Protect
façade against direct solar radiation, rain, or strong wind (e.g., scaffolding
protection net). High temperatures during summer shorten the drying time and
can lead to untimely drying out of the plaster. Air, material, and subsurface
temperatures have to be higher than +5 degrees Celsius
30. Curing
The curing time of finishing plaster will vary due to ambient temperature,
relative humidity, surface temperature, surface porosity, application methods,
and/or the thickness of the material. All freshly applied material must be
protected from inclement weather for a minimum of 24 hours after application.
It is the responsibility of the plaster applicator to determine if the product
is cured and/or dry prior to applying any additional coats that may be
required or exposing the applied product to rain, snow, dew, and/or any other
inclement weather condition that may have a detrimental effect. Cement-based
plasters will not fully cure for 28 days. However, plasters can be coated with
Dulux Acratex 510/10 Green Render Sealer prior to applying paint coatings,
they can be painted after the finish coats have cured for a minimum of 3-4
days.
31. Painting
Specialized Construction Products highly recommends that the paint system is
applied in three coats. One coat of a Dulux Acratex 501/10 Green Render Sealer
followed by two topcoats of Dulux Acratex 955 Acrashield Advance in the chosen
colour. The specified paint system must be used over the Caviteclad finishing
plasters to make the system weathertight and give the desired finish colour to
exterior walls. Dulux Acratex 955 Acrashield Advance is a 100% acrylic-based
paint that has been specially formulated for use over cement-based plasters it
can be tinted to a selected colour and should be applied by brush and roller
at a spread rate of approximately 6m²/litre. All cement based plastered
surfaces must be coated with Dulux Acratex 501/10 Green Render Sealer followed
by 2 coats of Dulux Acratex 955 Acrashield Advance. All acrylic based
plastered surfaces must be coated with 2 coats of Dulux Acratex 955 Acrashield
Advance tinted to the selected colour and applied by brush and roller at a
spread rate of approximately 6m2/litre. Dulux Acratex 955 Acrashield Advance
is an exterior paint system complying with all of Parts 7, 8, 9 or 10 of AS
3730 may be used. The paint system must be applied in accordance with the
paint manufacturer’s instructions. Other paint systems are not covered by this
specification sheet and Specialized Construction Products will not warrant the
use or suitability of alternative paint systems over the surface of its
plaster finishes.
11
The chosen paint system must have a Light Reflective Value (LRV) of no less
than 25%. If a dark colour has been specified below the 25% LRV then a full
acrylic texture system should be used.
32. Plaster Site Storage
Products in dry form must be stored in a dry area, off the floor on a timber
pallet or timber dunnage and must be protected from the weather and from
mechanical damage. Stock must be rotated to ensure that the oldest material is
used first. Plaster stock that is older than six months must be discarded. EPS
battens, uPVC flashings and profiles must be protected from direct sunlight
and physical damage. They should be stored flat and under cover. Liquid
components must be stored in a frost-free area.
33. Limitations
DO NOT apply plaster when the ambient or surface temperature is below 4ºC or
above 30ºC or will be in that range for the 24-hour period after application.
When hot, dry, or windy conditions exist, moist curing and protection must be
provided. Material that is allowed to freeze or material that dries too
quickly may suffer irreparable damage. DO NOT add any other materials to the
plasters used with the system or deviate from the mixing or application
procedures outlined in any of Specialized Construction Product’s technical
data sheets without written approval from Specialized Constructions Products.
DO NOT apply any plaster material unless the substrate has been properly
cleaned and prepared. DO NOT add any more water than prescribed by the
technical data sheet for the individual products. DO NOT wet the wall prior to
the application of any plaster. DO NOT reactivate any plaster with more water
once it has begun to set. DO NOT mix more plaster than you can use in 45
minutes. NOTE: Failure to follow the manufacturer’s written specifications
could result in the following but not limited to spalling, cracking, peeling,
chipping, delamination, discoloration, wash off, and overall system failure.
34. Maintenance
Any paint film damage must be repaired as soon as possible to prevent water
penetration and ensure that the high strength properties of the fibreglass
mesh are maintained. Any impact damaged areas must be thoroughly cleared of
any loose material and repaired with a 1:1 mixture of resin and water mixed
with the required amount of Caviteclad plaster. This will ensure a positive
bond between the original plaster and the repaired area. Repaint within the
following week. The wall cladding system should be regularly cleaned, at least
annually, by washing with clean water to remove dirt and to maintain the
finish appearance. Grime may be removed with warm water and detergent.
Plastered walls should be recoated with an approved paint system at 5 to 8
yearly intervals or sooner if required to maintain weathertightness. Regular
checks, at least annually, must be made
12
of the system to ensure that the weather resistant coating is maintained
watertight, and that the sealant, flashings, and other joints continue to
perform their function and do not allow water to penetrate. Failure to
correctly maintain the system may void any long-term warranties offered with
the system. Any accidental damage to the cladding must be repaired immediately
using Specialized Construction Products materials. For further information
with regard to maintaining and cleaning the Caviteclad EPS System please refer
to Specialized Plaster Maintenance Guide.
35. Warranty
The recommendations, suggestions, statements, and technical data provided by
Specialized Construction Products are based on the best current knowledge
available and are given for information purposes only without any
responsibility for their use. It is expressly understood and agreed that the
buyer’s sole and exclusive remedy shall be the replacement of defective
products, and under no circumstance, shall Specialized Construction Products
be liable for incidental or consequential damages. Specialized Construction
Products neither assumes, nor authorizes, any others to assume for it any
liability with respect to furnishing of the product. Handling and use of the
products are beyond the control of Specialized Construction Products;
therefore, no warranty is made, expressed or implied, as to the results or on-
site quality that can be obtained from the use of the product. The long-term
durability of the Caviteclad system is dependent upon the correct preparation
and application of all its components in strict accordance with all the
relevant written instructions and detail sheets. On-site application is beyond
the control of Specialized Construction Products and it cannot guarantee
workmanship or the correct preparation and application of its products or
systems. The Certified Caviteclad contractor shall take the overall
responsibility for, on-site supervision, staff training, installation, and
quality control.
Material Guarantee Period 15 years from date of practical completion to
plastering.
Workmanship Guarantee Period 5 years from date of practical completion to
plastering.
Technical Assistance Assistance and information are available by calling
Specialized Construction Products on (09) 414 4499 or 0800 800 79 or by e-mail
at info@specialized.co.nz.
13
Read User Manual Online (PDF format)