Bi-Fold ‎CM-F03SFS Barn Door Hardware Instruction Manual

July 16, 2024
Bi-Fold

Bi-Fold ‎CM-F03SFS Barn Door Hardware

Specifications:

  • Product : Bi-Fold Barn Door Hardware Kit (J-Shape Single Door)
  • Contents:
    • A – Flat Track (x1)
    • B – Adjustable Spacer (x3), Lag Bolt (x3), Washer (x3)
    • C – Steel Hanger (x1), Door Hinge (x3)
    • D – Bottom Pivot and Bracket (x1)
    • E – Handle (x1)

Product Usage Instructions

Prepare and Install the Tracks

  1. Draw Line for the Track

    • Tools Needed: Tape measure, Pencil, Wrench

    • Place the rail against the wall, use a level to draw a line for
      the track, and mark where the holes should be.

    • Ensure the height of holes on the wall is H+2-9/16 (H+65mm).

  2. Drill Track Holes

    • Tools Needed: Drill, Drill Bit 1/4 (6mm), Drill Bit 2/5 (10mm)
    • Pre-drill 2/5 (10mm) holes into the concrete according to your marks.
  3. Install The Track

    • Concrete wall installation: Install the anchor to holes on the concrete wall first, then install lag bolt to anchor.
    • Drywall installation: Install the lag bolt to wood stud or headboard directly.

Instructions
It’s important to determine if you will be installing a Header Board prior to installing the track. Due to various factors like wall studs location and door weight, a Header Board is recommended in all situations.

Install Handle

  1. Drill Handle Holes
    • Tools Needed: Drill, Drill Bit
    • Put barn door handle on the door first to fix a suitable position and make a mark.
    • Drill holes on the door where the mark is and install the barn door handle set.

Install Hinges

  1. Attach Hinges to Doors
    • Lay the doors facedown on a flat surface with a gap in between.
    • Space the hinges appropriately down from the top and up from the bottom of the doors.
    • Secure the hinges to the door with supplied flathead screws.

Attach Steel Hangers to Your Doors

  1. Install Steel Hangers
    • Install the hangers with predrilled holes. Adjust for door thickness if needed.

Single Door Hanging and Positioning Doors (Fold to the left side)

  • Fold the bottom pivot and bracket to the left side. Drill holes for the handle on the left side.

The door hardware kit includes

Product Content

Tools Needed

Prepare and Install the Tracks

Draw Line for the Track

Drill Track Holes

Note :

  • Concrete wall: Drill holes by using a 2/5″(10mm) concrete drill bit.
  • Wood framed wall: Drill out the holes by using a drill with 1/4″(6mm)drill bit.

Install The Track(Concrete wall installation)

Instructions
It s very important to determine whether you will be installing a Header Board prior to installing the track. Due to many overlapping factors such as the location of wall studs  (Our rail comes with pre-drilled holes every 16″ on center ) . the weight of a barn door and the various types of trim used in homes, we recommend using a Header Board in all situations . Please install a Header Board above the door opening directly into the studs.

Place the rail against the wall , and use a pencil to mark where the holes should be.

Install Handle

  • Install the barn door Handle Pull and Flush Hardware Set.
  • Put barn door handle on the door first to fix a suitable position and make a mark.
  • Use suitable drill bit to drill holes on the door where the mark is,and then install the barn door Handle Pull and Flush Hardware Set according to the picture.

Install Hinges

  1. Lay the doors to be joined together face down on a flat surface.
  2. Butt the doors together with a 1/16 ” ( 1mm ) gap in between ( approximate thickness of 3-4 business cards ) .
  3. Space the hinges approximately 10″-12″ ( 254-304mm ) down from the top and up from the bottom of the doors.
  4. Secure the hinges to the door with the s 4 upplied flathead screws

Prepare Your Doors

Attach steel Hangers to Your Doors

install the hangers with predrilled the holes . Maximum door thickness is 1-3 /4 ” ( 45mm ) , please add some bolt washers or cut the long door bolts to a suitable length to fit the door .

Single Door Hanging and Positioning Doors (Fold to the left side)

  • Fold to the left side, the bottom pivot and bracket is on the left side . Drill the holes for handle on the left side Picture for your reference.
  • For a singe door, both rollers should be installed at the edge of the door.
  • For your safety, please do as the following. this is to secure the door from falling.

Note :

Before hanging the door on the rack: For the fixed door side, position the“ U” shaped screw between the wheel bar and the rack. For the other side, position the “L” shaped screw between the wheel bar and the rack. Then tight the sides up with provided screws.

Single Door Hanging and Positioning Doors (Fold to the right side)

  • Fold to the right side, the bottom pivot and bracket is on the right side . Drill the holes for handle on the left side Picture for your reference.
  • For a singe door, both rollers should be installed at the edge of the door.
  • For your safety, please do as the following. this is to secure the door from falling.

Note:
Before hanging the door on the rack: For the fixed doorside, position the“ U” shaped screw between the wheel bar and the rack. For the other side, position the “L” shaped screw between the wheel bar and the rack. Then tight the sides up with provided screws.

Double Door Hanging and Positioning Doors ( For a double door)

Note: For your safety, please do as the following. this is to secure the door from falling.

For a double door, the hangers on each door side out should be placed on the edge of the side. For each side in, the hangers should be placed 1.38” to make sure the doors are fully closed when sliding. Don’t forget to mount the junction plate .

Before hanging the door on the rack: For the fixed doorside, position the“ U” shaped screw between the wheel bar and the rack. For the other side, position the“ L” shaped screw between the wheel bar and the rack. Then tight the sides up with provided screws.

Install the Bottom Pivot and Bracket

  1. Mark the location of the holes at the bottom of the door with a pencil according to the dimensions indicated in the figure below.
    Note : The Bottom Pivot and Bracket need to align with the center of the top connector plate used with the fixed roller.

  2. Install the metal plate at the bottom of the door panel.

  3. Install the floor guide on the ground.

WARNING

  • Failure to wear proper safety gear ( i . e , eye protection ) may result in serious injury or death . Always wear proper safety gear before using power tools .
  • Improper operation of power tools may result in loss of control,serious injury or death . Always ensure you have complete control of the power tool and the work area is free of hazards before operatiog a power tool . Lack of secure clamping of the door may result in unexpected movement of the door , loss of power tool control and serious injury or death . Always securely clamp the door in place before cutting or drilling the door .
  • Lack of or improperly installed anti-jump pads may result in the door coming off the track and cause serious injury or death installation of anti-jump pads are required for safe operation of this hardware .installed properly , these anti-jump pads will keep the door securely attached to the track.

CAUTION

  • Mishandling of heavy objects ( i.e., doors ) may cause a loss of balance and serious injury. Always be sure you have a secure hold on the object and are balanced before moving the object . Always wear safety shoes when lifting heavy objects.
  • Getting body parts (i. e., hair , fingers ) caught in moving parts may cause pinching and serious injury. Do not put fingers in parts that may move and always remove or contain anything on your body that may become entangled with a moving part.
  • Closing sliding doors with your hand on the end of the door may result in your hand , or fingers, getting caught between the door and other solid objects ( i . e., another door , molding ) causing serious injury. Always use the door handle to close doors.

Usage Statement :
Use of excessive force when opening , and closing , the door ( s )may result in damage to the hardware Always hold the handle and gently open and close the door ( s )

FAQ

Q: Do I need to use a Header Board for installation?
A: Yes, it is recommended to use a Header Board in all installation situations due to various factors that can affect door stability.

Q: What tools are required for installing the barn door hardware kit?
A: Tools needed include a tape measure, pencil, wrench, drill, drill bits, plumb bob, Phillips screwdriver, and wrench.

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals