MONITOR AUDIO 893CLB Pre Construction Bracket Instruction Manual
- June 20, 2024
- MONITOR AUDIO
Table of Contents
MONITOR AUDIO 893CLB Pre Construction Bracket Instruction Manual
PRE CONSTRUCTION BRACKET
Pre-Construction Bracket Installation Instructions.
The following product is meant solely for the purpose described and the
installation should be carried out by qualified personnel only.
The Monitor Audio pre-construction brackets are designed with the professional
installers in mind. They will provide a quick and easy way of locating the
desired position of the Manitor Audio custom install loudspeakers
In Wall
In Ceiling
Pre-Construction Bracket Installations Steps:
-
Detide location of speaker Isl
-
Clip fixing wings into place in convenient location around the polymer frame to suit the joists.
NOTE: Ensure the clips of the wings are fixed securely. There should be no gap around the outside of the wing where it joins the bracket. If there is a gap, this is a sure sign one of the clips is not in correctly.
Alternative fixing arrangements are possible:
-
Staple fixing wings to joists/ studs. Ensure the Monitor Audio and colour text on the wings face away from you when fastening.
-
Cable lie/ zip lie the speaker cable lo the loop provided inside the moulding. Snap the loop off when installing speaker.
-
Fix plaster board/ dry wall.
-
Cut hole using INNER edges as cutting reference. DO NOT CUT TO THE OUTER EDGES OF THE BRACKET.
Documents / Resources
|
MONITOR AUDIO 893CLB Pre Construction
Bracket
[pdf] Instruction Manual
893CLB, 893CLB Pre Construction Bracket, Pre Construction Bracket, Bracket
---|---