Home Bargains HE004 Flashing LED Birthday Cake Tower DIY Kit Instruction Manual

June 14, 2024
Home Bargains

Home Bargains HE004 Flashing LED Birthday Cake Tower DIY Kit

Product Information

Specifications

  • Work Voltage: DC 4.5V-5V
  • Power Type: USB or AA Battery
  • LED Color: White/Red/Blue/Yellow/Green
  • Work Temperature: -40~85
  • Work Humidity: 5%~95%RH
  • Size (Installed): 8080125mm

Product Usage Instructions

Power Supply

  • Connect the USB Power Wire or install 3 AA batteries to provide working power. Do not connect both USB power and battery simultaneously.

Work Power Supply Toggle

  • Toggle the switch to turn the power supply ON/OFF.

LED Flashing Speed Adjustment

  • Rotate the potentiometer to change the flashing frequency and speed of the LEDs.

Music Playback Control

  • Press the button to start or stop music playback.

Frequently Asked Questions

Q: Can I use both USB power and batteries at the same time?

A: No, please do not connect USB power and battery simultaneously to avoid any damage.

Q: How do I ensure the correct installation of the LED round PCB boards?

A: Make sure the LED round PCB boards are on the same side as indicated by the silk screen ‘front’. The LED round PCB boards should be perpendicular to the rectangle PCB.

Introduction

  • HE004 is a Flashing LED Birthday Cake Tower DIY Kit. It adopts a 7-layer cake tower design, collecting 83 LED lights in five colors, and can play happy birthday music songs. It is very suitable for birthday parties, Christmas, and other activities
  • It is an exciting DIY electronic product that enables users to understand the circuit more clearly and learn soldering skills.

Function

  1. 5 Color LED Flashing Automatically
  2. Layer Cake Tower Design
  3. 10 Automatic Flashing Mode
  4. Adjustable Flashing Speed
  5. Play Happy Birthday Music Song
  6. Adjustable ON/OFF Music
  7. Dual Power Supply Mode
  8. DIY Hand Soldering

Parameter

  1. Work Voltage: DC 4.5V-5V
  2. Power Type: USB or AA Battery
  3. LED Color: White/Red/Blue/Yellow/Green
  4. Work Temperature: -40℃~85℃
  5. Work Humidity: 5%~95%RH
  6. Size (Installed): 8080125mm

Use Methods

  1. Connect USB Power Wire or install 3pcs AA Battery to provide working power.
    • Note: Please do not connect USB power and battery at the same time.
  2. Switch the Toggle Switch to turn the ON/OFF work power supply.
  3. Rotate the potentiometer to change the flashing frequency and speed of the LED.
  4. Press the button to start or stop music playback.

Component Listing

NO. Component Name PCB Marker Parameter QTY
1 STC8G1K08-38I Controller U1 DIP-16 1
2 S8550 Transistor Q1-Q8 TO-92 8
3 Passive Buzzer Beep 5V 1
4 Potentiometer R16 1K 1
5 Black Touch Button S1 667mm 1
6 SS-12F44G5 Toggle Switch 1P2T S2 5Pin 1
7 IC Socket U1 DIP-16 1
8 Ceramic Capacitor C1-C8 0.1UF 104 8
9 Metal Film Resistor R1-R6,R10-R15,R23-R26 10ohm 16
10 Metal Film Resistor R20-R22,R27-R28,R31-R34 1Kohm 9
11 Metal Film Resistor R7-R9,R17-R19,R29-R30 2Kohm 8
12 3mm Red LED D22-D39 2Pin 18
13 3mm Blue LED D40-D54 2Pin 15
14 3mm Green LED D67-D74 2Pin 8
15 3mm Yellow LED D75-D80 2Pin 6
16 3mm White LED D1-D21,D55-D66,D76-D78 2Pin 36
17 DC-005 Power Socket P2 5.5*2.1mm 1
18 USB to DC005 Power Wire P2 100cm 1
19 AA*3 Battery Box POWER AA*3 1
20 M3*20mm Copper Pillar / / 4
--- --- --- --- ---
21 M3*5mm Screw / / 4
22 M3*8mm Screw / / 2
23 M3 Nut / / 2
24 PCB HE004-A Circuit Board / 80*80mm 1
25 PCB HE004-B Circuit Board / 101*24mm 1
26 PCB HE004-C Circuit Board / 70*70mm 1
27 PCB HE004-D Circuit Board / 60*60mm 1
28 PCB HE004-E Circuit Board / 50*50mm 1
29 PCB HE004-F Circuit Board / 40*40mm 1
30 PCB HE004-G Circuit Board / 30*30mm 1
31 PCB HE004-H Circuit Board / 20*20mm 1

Note: Users can complete the installation using the PCB silkscreen and component list.

Application

  1. Training welding skills
  2. Student School
  3. DIY production
  4. Project Design
  5. Electronic competition
  6. Gift giving
  7. Crafts collection
  8. Home decoration
  9. Souvenir collection
  10. Graduation design
  11. Holiday gifts

Note:

  1. Please do not connect USB power and battery at the same time.
  2. The LED round PCB board must be on the same sides, which can be ensured by the’ front’ of the silk screen.
  3. LED round PCB board must be perpendicular to the rectangle PCB.

Installation Tips

  1. The user needs to prepare the welding tool first.
    • Soldering iron (<50 Watt)
    • Rosin core (“radio”) solder
    • Wire cutters
    • Wire strippers
    • + ’ screwdriver
  2. Please be patient until the installation is complete.
  3. The package is a DIY kit. It needs finish installed by the user.
  4. The soldering iron can’t touch the components for a long time(1.0 seconds), otherwise, it will damage the components.
  5. Pay attention to the positive and negative of the components.
  6. Strictly prohibit short circuits.
  7. Users must install the LED according to the specified rules. Otherwise, some LEDs will not light.
  8. Install complex components preferentially.
  9. Make sure all components are in the right direction and right place.
  10. It is strongly recommended to read the installation manual before starting installation!!!
  11. Please wear anti-static gloves or anti-static wristbands when installing electronic components.

Installation Steps

Please be patient and install

  1. Step 1: Install 16pcs 100hm Metal Film Resistor at R1-R6,R10-R15, R23-R26.
  2. Step 2: Install 9pcs 1Kohm Metal Film Resistor at R20-R22,R27-R28, R31-R34
  3. Step 3: Install 8pcs 2Kohm Metal Film Resistor at R7-R9, R17-R 19, R29-R30.
  4. Step 4: Install 1pcs DIP-16 IC Socket at U1. There is a gap mark on one end of the IC Socket and there is a gap mark on the PCB silkscreen where the IC Socket can place.
    • These two marks correspond to each other and are used to specify the installation direction of the IC Socket.
  5. Step 5: Identify the positive(anode) and negative(cathode) lead of the LED. The leads of the LED must be installed correctly, otherwise the LED cannot be turned on. Here are four methods as following:
    • According to the length of the LED lead to distinguish. The longer pin is positive(anode) lead. The shorter pin is negative(cathode) lead.
    • To identify the negative(cathode) of the LED is to look into the plastic case where one can see that the negative(cathode) is much thicker/bigger inside the plastic case than the anode lead.
    • Identify by the edge of a plastic case. The negative(cathode) lead of the LED should be the pin nearest the flat on the plastic case.
    • Test by 3V battery or multimeter. The pin is positive(anode) lead which is connected to a positive of 3V if the LED can light up after connecting the 3V power supply. (LED can not be powered directly from 3V for a short time: less than 0.5second)
    • Note: If the flat on package disagrees with other indicators(short lead, large cathode lead end), then other indicators take priority. I.e. if the flat disagrees with the lead length, use the lead length as the cathode indicator.
  6. Step 6: Install 21pcs 3mm White LED at D1-D21. Note: the longer pin is a positive pole connected to a square pad.
  7. Step 7: Install 8pcs 0.1UF 104 Ceramic Capacitor at C1-C8.
  8. Step 8: Install 8pcs TO-92 S8550 Transistor at Q1-Q8. The arc on the PCB corresponds to the arc of the components. Adjacent pins must not be short-circuited.
  9. Step 9: Install 1pcs 667mm Black Touch Button at S1 as music ON/OFF switch.
  10. Step 10: Install 1pcs 5V Passive Buzzer at Beep. The positive pole connects to the’ + ‘ pad.
  11. Step 11: Install 1pcs 5.5*2.1mm DC-005 Power Socket at P2.
  12. Step 12: Install 1pcs SS-12F44G5 Toggle Switch 1P2T at S2 as a power switch.
  13. Step 13: Install 1pcs B102 1K Potentiometer at R16 to change the LED flashing frequency.
  14. Step 14: Cut and reserve about 3cm of battery box wires.
  15. Step 15: Fix AA3 Battery Box on the back side of the PCB by 2pcs M38mm Screw and 2pcs M3 Nut.
  16. Step 16: Connect wires from the battery box to the PCB. Wires passing through PCB holes and red wire connect to the ‘ +’ round pad.
  17. Step 17: Install 1pcs DIP-16 STC8G1K08-381 MCU at U1. There is a gap mark on one end of the IC and there is a gap mark on the IC Socket where the IC can place.
    • These two marks correspond to each other and are used to specify the installation direction of the IC.
  18. Step 18: Test. Turn ON S2 Power Switch and the press S1 button after connecting the USB power. It is OK if LED automatic flashing and playing music.
  19. Step 19: Fix 4pcs M320mm Copper Pillar by 4pcs M35mm Screw.
  20. Step 20: Install 18pcs 3mm Red LED at D22-D39 on PCB HE004-C.
    • Note: the longer pin is a positive pole connected to a square pad.
  21. Step 21: Install 15pcs 3mm Blue LED at D40-D54 on PCB HE004-D.
    • Note: the longer pin is a positive pole connected to a square pad.
  22. Step 22: Install 12pcs 3mm White LED at D55-D66 on PCB HE004-E.
    • Note: the longer pin is a positive pole connected to a square pad.
  23. Step 23: Install 8pcs 3mm Green LED at D67-D74 on PCB HE004-F.
    • Note: the longer pin is a positive pole connected to a square pad.
  24. Step 24: Install 6pcs 3mm Yellow LED at D75-D80 on PCB HE004-G.
    • Note: the longer pin is a positive pole connected to a square pad.
  25. Step 25: Install 3pcs 3mm White LED at D76-D78 on PCB HE004-H.
    • Note: the longer pin is a positive pole connected to a square pad.
  26. Step 26: Melt as much in as possible on 10 pads on each PCB from LED round PCB HE004-C to HE004-H. But adjacent pads cannot be short-circuited.
  27. Step 27: Melt as much tin as possible on 10 pads at the bottom on both sides of PCB HE004-B.
    • Note: Just for bottom pads. But adjacent pads cannot be short-circuited.
  28. Step 28: Melt as much in as possible on 10 pads on PCB HE004-A. But adjacent pads cannot be short-circuited.
  29. Step 29: Insert PCB HE004-B into HE004-A with two silk screen ‘ front’ on the same side which are used to determine installation direction.
    • Fix any one pad at first after aligning each pad and ensure that the two PCBs are perpendicular to each other.
  30. Step 30: Connect other pads But adjacent pads cannot be short-circuited. Make sure they are vertical and pads cannot be short-circuited.
  31. Step 31: Align 10 pads from PCB HE004-B and Red LED PCB HE004-C and ensure they are perpendicular to each other. Silkscreen’ front’ on the same side.
  32. Step 32: Fix any one pad at first after aligning each pad and ensure that the two PCBs are perpendicular to each other.
  33. Step 33: Connects other pads But adjacent pads cannot be short-circuited. Make sure they are vertical and pads cannot be short-circuited. Test after Power ON.
  34. Step 34: Fix Blue LED HE004-D on HE004-B in the circuited and si ritual, align the same side be short Test after Power ON.
  35. Step 35: Fix White LED HE004-E on HE004-B in the same methods. Vertical, aligned, pads cannot be short-circuited and silk ‘ front’ on the same side.
    • Test after Power ON.
  36. Step 36: Fix Green LED HE004-F on HE004-B in the same methods. Vertical, aligned, pads cannot be short-circuited, and silk front in the same side Test after Power ON.
  37. Step 37: Fix Yellow LED HE004-G on HE004-B in the same methods. Vertical, aligned, pads cannot be short-circuited and silk ‘ front’ on the same side. Test after Power ON.
  38. Step 38: Fix White LED HE004-H on HE004-B in the same methods. Vertical, aligned, pads cannot be short-circuited and silk ‘ front’ on the same side. Test after Power ON.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals