YARDLINK Cedar No Dig Fencing System Instruction Manual

June 6, 2024
YARDLINK

YARDLINK logo

Cedar
No Dig Fencing SystemYARDLINK Cedar No Dig Fencing

Install

YARDLINK Cedar No Dig Fencing-1Panel ring rests on top of stake sleeve Bottom gate hinge rests or top of base panel ringYARDLINK Cedar No Dig Fencing-ring Drop post through rings & hinges then into stake sleeveYARDLINK Cedar No Dig
Fencing-2 Swing attached Base Unit into place Use Post to mark next stake position
Continue adding panels, using the panel to mark the position of the next stake YARDLINK Cedar No Dig Fencing-next

YARDLINK Cedar No Dig Fencing-Laft panalLeft panel (lower) rings to rest on top of stake sleeve Right panel (raised) rings to rest on top of left panel rings Push post through all rings and into stake sleeve

Gate Latch Installation

Drill pilot 1/16″ holes in positions shown and attach latch to wood picket with Phillips screws.
Gate halves must be installed with 1/2″ between and with top rails aligned

YARDLINK Cedar No Dig Fencing-System

Gate Adjustment

YARDLINK Cedar No Dig Fencing-Fencing Questions, problems, missing parts? Before returning to your retailer, call our customer service department at 800.607.6409, 8:00 am — 5:00 pm EST Monday — Friday. Or eMail us at CustomerService@OPBglobal.com

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals