SOLTARO AIO2-BTLV Series AIO2-BTLV-5KWH Li-Ion Battery User Manual

June 5, 2024
SOLTARO

SOLTARO AIO2-BTLV Series AIO2-BTLV-5KWH Li-Ion Battery

Products Covered by This Manual

  • AIO2-BTLV Series Li-ion batteries.
  • AIO2-BTLV-5KWH
  • AIO2-BTLV-10KWH

Target Group

This document is intended for qualified electricians. Any electrical installation and maintenance on this inverter must be performed by qualified electricians in compliance with standards, wiring rules or requirements of local grid authorities or bodies.

Symbols Used

The following types of safety precautions and general information symbols are used in this manual. These important instructions must be followed during installation, operation and maintenance of the battery.

DANGER| Indicates a hazard with a high level of risk that will result in death or serious injury.
---|---
WARNING| Indicates a hazard with a medium level of

risk that can result in death or serious injury.

CAUTION| Indicates a hazard with a low level of risk that can result in minor or moderate injury.
NOTICE| Indicates a situation which, if not avoided, can result in property damage.

Storage of the Manual
The manual should be stored with other documents belonging to the inverter and must be available to people authorized to work on the installation.

 Safety

Intended Use

The AIO2-BTLV Series is a lithium battery for an energy storage system. It must only be connected with a SOLTARO hybrid inverter/battery inverter. To prevent personal injury and property damage and to ensure long- term operation of the product, please read and follow all the instructions and cautions on the battery and this user manual during installation, operation or maintenance at all times.

Important Safety Instructions

Danger to life from electric shock.

  • Before performing any work on the battery, make sure the battery is powered off and the DC isolator is disconnected.
  •  Do not short circuit the DC connectors of the battery, this may cause electric shock to personnel and damage to the product.
  •  Do not touch DC connectors of the battery.
  • If an error occurs, contact your local distributor or a qualified electrician.

WARNING

  •  Do not allow the battery to get in contact with liquids.
  •  Do not subject the battery to high pressures.
  •  Do not place any objects on top of the battery.

NOTICE

  •  Do not open the battery cover or change any components without authorization, otherwise the warranty commitment for the battery will be invalid.
  •  Appropriate methods must be adopted to protect battery from electrostatic discharge; any damage caused by ESD is not warranted by the manufacturer.

 Scope of Delivery

SOLTARO-AIO2-BTLV Series-AIO2-BTLV-5KWH Li-Ion-
Battery-fig1

Item QTY Designation
A 1 5kWh/10kWh Battery
B 1 5kWh/10kWh Wall Mounting Bracket
C 4 5kWh/10kWh Screws for Fixing Mounting Bracket
D 1 Manual

NOTICE

Accessories for different applications may be different.

Product Description

Thank you for choosing a SOLTARO battery. Features of the SOLTARO battery are ahead of the field and should be understood prior to install.

Figure 1. View of the AIO2-BTLV Series Lithium Battery

Position Designation

A

| Connection Area Cover

For All-in-one application with hybrid inverter, the cover is not included.

B| LED indicator

Symbols on the Type Label

Symbol Explanation

Caution, Risk of Danger

|

Caution, Risk of Electric Shock

|

Refer to the Operating Manual

| WEEE Mark. This inverter should not be disposed as ordinary waste.

 Electrical schematic for AIO2-BTLV

SOLTARO-AIO2-BTLV Series-AIO2-BTLV-
5KWH Li-Ion-Battery-fig7

 Mounting

 Requirements for Mounting

NOTICE

Check to make sure the installation site does not fall into any of the following conditions: If it does, then a risk assessment will be required. Please apply safe lifting procedures when installing the battery. 2 people or mechanical aids are recommended.

  •  Unsafe due to assessment of occupational health safety risks.
  •  The ambient temperature is outside the range of tolerable ambient temperature (-20°C to +50°C, -4°F to +122°F).
  • Close to flammable materials or areas where flammable materials are stored. The distance from flammable materials must be >1200mm.
  • Prone to be damaged by sea water.
  • Prone to be flooded or high levels of snow falls.
  • Close to corrosive gas or liquid (for example, locations where chemicals are processed or stored).
  • Can be installed indoors or outdoors
  • Exposed to direct sunlight or in an enclosure exposed to direct sunlight.
  • Little or no air flow
  •  Mounted on a surface without suitable fire/heat rating.
  • Mounted on a wall without suitable load holding capacity.
  •  High humidity.
  • Sites considered unsafe because of local regulations.
  •  Confined space without adequate airflow.
  • Area subject to sand or dust storms.
  • Exposed to steam, vapor, or water.
Mounting the Battery (5kWh)

Procedure:

CAUTION

The battery must be mounted in upright position with a maximal tilt angle of 15 degree. SOLTARO-AIO2-BTLV Series-AIO2-BTLV-5KWH Li-Ion-Battery-
fig8

Space Recommendation

Position Min.size
Left 600
Right 600
Top 1200(inverter not included)
Bottom 50
Front 300

STEP 1:
Prepare the battery box and remove the upper cover (fixed by buckle)SOLTARO-
AIO2-BTLV Series-AIO2-BTLV-5KWH Li-Ion-Battery-fig10

STEP 2:
Install the remaining bottom frame accessories on the 5 kW battery (when installing, take out the 3 rubber plugs on the bottom frame accessories, and then use 3 M5-10 stainless steel cross round head triple combination screws to fix the bottom frame on the battery, and then put back the rubber plug )SOLTARO-AIO2-BTLV Series-AIO2-BTLV-5KWH Li-Ion-Battery-
fig11 STEP 3 :
Drill holes on the wall (diameter 12mm, drilling depth≥ 65mm, unscrew 5 M8-60 expansion screws, and put the expansion head into the drilled hole
note: the height of the drill hole must be ≥200mmSOLTARO-AIO2-BTLV Series-
AIO2-BTLV-5KWH Li-Ion-Battery-fig12

STEP 4:
Install the rack with 5 M8-60 hexagon socket screws unscrewed from the expansion screws in step 3.SOLTARO-AIO2-BTLV Series-AIO2-BTLV-5KWH Li-Ion-
Battery-fig13

STEP 5:
Hang the battery (note: make sure that the four hanging buckles on the side are locked, otherwise the strength is not enough)

SOLTARO-AIO2-BTLV Series-AIO2-BTLV-5KWH Li-Ion-Battery-
fig14

STEP 6:

Install the front coverSOLTARO-AIO2-BTLV Series-AIO2-BTLV-5KWH Li-Ion-
Battery-fig23 Mounting the Battery (10kWh)

Procedure:

CAUTION

The battery must be mounted in upright position with a maximal tilt angle of 15 degree .

SOLTARO-AIO2-BTLV Series-AIO2-BTLV-5KWH Li-Ion-Battery-
fig16

Space Recommendation

Position Min.size
Left 600
Right 600
Top 1200(inverter not included)
Bottom 50
Front 300

STEP 1:
Prepare the battery box and remove the upper cover (fixed by buckle)SOLTARO-
AIO2-BTLV Series-AIO2-BTLV-5KWH Li-Ion-Battery-fig18

STEP 2:
Install the remaining bottom frame accessories on the 10 kW battery (when installing, take out the 3 rubber plugs on the bottom frame accessories, and then use 3 M5-10 stainless steel cross round head triple combination screws to fix the bottom frame on the battery, and then put back the rubber plug )SOLTARO-AIO2-BTLV Series-AIO2-BTLV-5KWH Li-Ion-Battery-
fig19

STEP 3 :
Drill holes on the wall (diameter 12mm, drilling depth≥ 65mm, unscrew 6 M8-60 expansion screws, and put the expansion head into the drilled hole.
note: the height of the drill hole must be ≥200mmSOLTARO-AIO2-BTLV Series-
AIO2-BTLV-5KWH Li-Ion-Battery-fig20

STEP 4:
Install the rack with 6 M8-60 hexagon socket screws unscrewed from the expansion screws in step 3.

SOLTARO-AIO2-BTLV Series-AIO2-BTLV-5KWH Li-Ion-Battery-
fig21

STEP 5:
Hang the battery (note: make sure that the six hanging buckles on the side are locked, otherwise the strength is not enough) SOLTARO-AIO2-BTLV Series-AIO2
-BTLV-5KWH Li-Ion-Battery-fig22

STEP 6:
Install the front coverSOLTARO-AIO2-BTLV Series-AIO2-BTLV-5KWH Li-Ion-
Battery-fig23

Electrical Connection

 Overview of the Connection Area

SOLTARO-AIO2-BTLV Series-AIO2-BTLV-5KWH Li-Ion-Battery-
fig24

Position Designation
A Battery Power Ports
B DC Isolator (125A)
C BMS Ports
D Grounding Port
E Power Switch
 Battery Power Connection

Battery connection diagramSOLTARO-AIO2-BTLV Series-AIO2-BTLV-5KWH Li-Ion-
Battery-fig25

Procedure:

CAUTION

Before connecting the power cable, make sure the battery is turned off, and the DC isolator is disconnected. Power Cables are supplied with included accessories kit, please confirm they are correct before installation.

STEP 1:
Install the connectors to battery power ports; make sure the polarities are correct.

STEP 2:
Plug the other ends of power cables into inverter. Please contact with your inverter vendor for detailed information.

BMS Communication Connection

Please check whether the BMS communication cable in the accessory box is appropriate for the battery. If you are not sure of that, please confirm with your vendor.
Procedure:

STEP 1:
Please insert the BMS connector into the BMS port of battery.

STEP 2:
Please insert the other end of the cable in the corresponding port of inverter.

BMS Connector Pin Definition:

  1.  BMS_CAN_H
  2. BMS_CAN_L
  3. BMS_485_A
  4. NULL
  5.  BMS_485_B
  6. NULL

 Parallel Connection of Multi-batteries

Up to 3 units of AIO2-BTLV Series batteries with the same capacity can be parallel connected in one system. Parallel Connection DiagramSOLTARO-
AIO2-BTLV Series-AIO2-BTLV-5KWH Li-Ion-Battery-fig27

Procedure:

STEP 1:

  • Connect all the positive terminals of power ports of each battery.
  •  Connect all the negative terminals of power ports of each battery.
  •  Connect the power ports to inverter.

STEP 2:

  •  Connect the BMS ports of each battery. The COM DOWN of the first battery should be connected to the COM UP of the second battery and so forth.
  • Then connect the BMS port to inverter.

Operating of the Battery

 LED Indicator

The LED indicates the operating state of battery and also battery SOC. Battery status can be monitored remotely via inverter monitoring portal when installed with Soltaro Hybrid Inverters.

LED Explanation
Blue The battery’s status is normal;

means SOC= 0~25%(SOC1)

SOC1 will flash when charging

means SOC=25%+25%~50%(SOC2)

when charging, 25% indicator light is on and SOC2 will flash

means SOC=50%+50%~75%(SOC3)

when charging, 50% indicator light is on and SOC3 will flash

means SOC=75%+75%~100%(SOC4)

when charging, 75% indicator light is on and SOC4 will flash

Red| • If the battery SOC is below 5%, all the lights will be red.

• When there is a service alert, all the lights will be red.

Turn On/Off the Battery
  •  When turning on the battery, turn on the isolator firstly, then switch on the battery;
  • When turning off the battery, switch off the battery firstly, then disconnect the isolator.
Maintenance

When carrying out battery maintenance, please pay attention to the following matters:

  •  Only authorized service personnel are allowed to install the battery or perform servicing and maintenance.
  •  The battery case can be cleaned by dry cloth or soft brush if necessary.
  •  No electrical maintenance is required.
  • The power should be disconnected before attempting any maintenance or cleaning of the battery.

Technical Data

Electrical Data AIO2-BTLV-5KWH AIO2-BTLV-10KWH
Cell Type LFP LFP
Total Energy 5 kWh 10kWh
Depth of Discharge 90% 90%
Usable Energy 5 kWh 10kWh
Nominal Voltage 51.2 V 51.2 V
Operating Voltage Range 40-58.4 V 40-58.4 V
Nominal Capacity 100 Ah 200 Ah
Max. Charge Current 50 A 100 A
Max. Discharge Current 100 A 100 A
Max. Parallel Number 5 units 5 units
General Data AIO2-BTLV-5KWH AIO2-BTLV-10KWH
Mounting information Wall-mounted / Ground-mounted
Communication CAN / RS485
Operating Temperature 0~45℃ charge / -10~50℃ discharge
Dimension 540430210 mm 540680210 mm
Weight 45 kg 85 kg
IP Protection Type IP65

Contacts

Head Office & Showroom
8 Mohr Street, Tullamarine, VIC, Australia 3043
Tel:+61 1300 276 582
Email:
service@soltaro.com Support Head Office
service.au@soltaro.com Australian Support
UK/Europe Office
Unit 8, High Grounds Industrial Est., Worksop, Notts, S80 3AF, United Kingdom Tel:+44 (0)1909 807 577
Email: service.uk@soltaro.com
South Africa Office
Office 642 Amelia Road, Lanseria Corporate Park, Lanseria South Africa 1739 Tel:+27 (0)11 318 6583
Email: service.sa@soltaro.com
Website
WWW.SOLTARO.COM
Registration URL
https://soltaro.com/product-registration