Streamline N-1560-59-FSWH-FM Acrylic Freestanding Bathtub Series Owner’s Manual

June 5, 2024
Streamline

OWNER’S MANUAL & INSTALLATION GUIDE

READ THE ENTIRE INSTALLATION GUIDE PRIOR TO INSTALLING THE BATHTUB
This bathtub should only be installed by a certified plumber two people are required to lift the bathtub
For installation and assembly videos, please visit our website www.streamlinebath.com
OR
our YouTube page by searching for “Streamline Bath”
OR
following the below link to our channel:
https://www.youtube.comichannel/LICIMGMbkwoGSqzo-pCfaJw

| | | |
---|---|---|---|---
https://youtu.be/zRrTPsFmK10| https://youtu.be/kFWq4p–LMg| https://youtu.be/MtIcM85TPuU| https://youtu.be/n5bURIIs9OA| https://youtu.be/-T8PCXpQqP8

PRIOR TO INSTALLATION

These products must be installed by a fully insured and licensed plumber only.
Installation of any product by anyone other than a fully insured and the licensed plumber shall void the limited warranty.
We are not responsible for any local code compliance for this product.
Building and plumbing codes may vary state-to-state. Streamline shall not be held liable for any and all incidental damages or floods caused due to the use of this product. Streamline shall not be held liable for any and all fees stemming from the cost of installation, re-installation, removal, subsequent damage, or transportation in a case of a product defect.

TOOLS REQUIRED

Streamline N 1560 59 FSWH FM Acrylic Freestanding Bathtub Series - fig
67

WHAT IN THE BOX

Streamline N 1560 59 FSWH FM Acrylic Freestanding Bathtub Series - fig
1

DRAIN MODEL COMPATIBILITY

FREESTANDING BATHTUB

Streamline N 1560 59 FSWH FM Acrylic Freestanding Bathtub Series - fig
2

Streamline N 1560 59 FSWH FM Acrylic Freestanding Bathtub Series - fig
3

For a full drain and model compatibility list, please visit our website. www.streamlinebath.com, and search for the model that you are Interested In In the upper right-hand corner of the website.

Streamline N 1560 59 FSWH FM Acrylic Freestanding Bathtub Series - fig
5

Streamline N 1560 59 FSWH FM Acrylic Freestanding Bathtub Series - fig
6

Streamline N 1560 59 FSWH FM Acrylic Freestanding Bathtub Series - fig
7

For a full drain and model compatibility list, please visit our website, www.streamlinebath.com, and search for the model that you are Interested In in the upper right-hand corner of the website.

DRAIN DIAGRAMS

MODEL: D1040C-XX

Streamline N 1560 59 FSWH FM Acrylic Freestanding Bathtub Series - fig
8

NO.

1

| ITEM

Pop-Up Cover

| QTY.
1
---|---|---
2| 0 Ring| 1
3| Strainer| 1
4| Upper Rubber Gasket| 1
5| Lower Rubber Gasket| 1
6| Cartridge| 1
7| Drain Tee| 1
8| Coupling Pipe| 1
9| Overflow Body| 1
10| Backside Gasket| 1
11| Frontside Gasket| 1
12| Strainer| 1
13| Pin Bolt| 1
14| Overflow Plate| 1

MODEL: D1040E-XX

Streamline N 1560 59 FSWH FM Acrylic Freestanding Bathtub Series - fig
9

NO. ITEM QTY.
1 Pop-Up Cover 1
2 0 Ring 1
3 Strainer 1
4 Upper Rubber Gasket 1
5 Lower Rubber Gasket 1
6 Cartridge 1
7 Drain Tee 1
8 Coupling Pipe 1
9 Overflow Body 1
10 Overflow Plate 1

DRAIN DIAGRAMS

MODEL: D1845-XX

(MODEL DOES NOT COME WITH AN OVERFLOW COVER BY DESIGN)

Streamline N 1560 59 FSWH FM Acrylic Freestanding Bathtub Series - fig
10

NO. ITEM QTY.
1 Pop-Up Cover 1
2 0 Ring 1
3 Strainer 1
4 Upper Rubber Gasket 1
S Lower Rubber Gasket 1
6 Cartridge 1
7 Drain Tee 1
8 Coupling Pipe 1
9 Overflow Body 1

MODEL: ND-025-XX

Streamline N 1560 59 FSWH FM Acrylic Freestanding Bathtub Series - fig
11

NO. ITEM QTY.
1 Pop-Up Cover 1
2 0 Ping 1
3 Cartridge 1
4 Strainer 1
5 Upper Gasket 1
6 Lower Gasket 1
7 Drain Tee 1

MODEL: N-PU1606-XX

(MODEL DOES NOT COME WITH AN OVERFLOW COVER BY DESIGN)

NO. ITEM QTY.
1 Pop-Up Cover 1
2 0 Ping 1
3 Cartridge 1
4 Strainer 1
5 Upper Gasket 1
6 Lower Gasket 1
7 Drain Tee 1

ND-025-XX
Streamline N 1560 59 FSWH FM Acrylic Freestanding Bathtub Series - fig
13

D1040F-XX

Streamline N 1560 59 FSWH FM Acrylic Freestanding Bathtub Series - fig
14

D1845-XX

Streamline N 1560 59 FSWH FM Acrylic Freestanding Bathtub Series - fig
15

Streamline N 1560 59 FSWH FM Acrylic Freestanding Bathtub Series - fig
17

DRAIN D1040E-XX

HOW TO REMOVE THE OVERFLOW COVER:
If the chrome overflow cover is already pre-installed on your model, there are two simple ways to remove the cover.

  1. Take a blade knife and carefully cut around the overflow. This will cut through the adhesive and allow the overflow cover to be removed.
  2. Take a screwdriver and insert it into the overflow hole, applying pressure to pop out the overflow cover.

HOW TO INSTALL THE OVERFLOW COVER:

  1. Put a bead of neutral cure silicone on the back of the overflow cover. Align with the overflow hole on the bathtub and stick on the bathtub. Press firmly. Wipe away any excess adhesive. Let it sit for at least 24 hours.

Streamline N 1560 59 FSWH FM Acrylic Freestanding Bathtub Series - fig
20

DRAIN D1040E-XX

HOW TO INSTALL THE DRAIN:

  1.  Unscrew the strainer from the drain tee that came in a separate box with your purchase.
  2. Take off the larger, lower rubber gasket. DO NOT TAKE OFF THE SMALLER, UPPER GASKET.
    3. Place the strainer through the hole in the bathtub.
    4. Take the lower gasket that was previously removed and re-attach it to the strainer from underneath the bathtub.
    5. Take the drain tee and unscrew the right-handed side cap to connect to the overflow. There will be one gasket that you will remove to use to attach to the overflow drain. Set it aside for now.
    6. Take the drain tee and attach it to the strainer from underneath the bathtub. Tighten as much as possible.
    7. Run the cap through the overflow hose and let it sit.
    8. Take the rubber gasket that you had previously set aside and run it through up to the first ring on the overflow drain. Make sure that the gasket is put on inwards like so:
    9. Attach the hose to the drain tee that was connected to the strainer in step 6. Tighten firmly. Check for any leakage prior to finalizing installation as there may be tightening that is required or re-attaching the gasket correctly. This is a critical step that cannot be skipped.

DRAIN D1040C-XX

HOW TO REMOVE THE OVERFLOW COVER:

  1. Unscrew the round overflow cover. There will be a pin bolt that is visible. Unscrew the pin bolt and remove it along with the overflow plate.
  2. Please remove the large rubber gasket as well as the overflow drain from the back of the bathtub.

HOW TO INSTALL THE OVERFLOW COVER:

  1. Unscrew the overflow cover, overflow plate, and pin bolt from the drained color of your choice.
  2.  Take the overflow hose with the rubber gasket and attach it from the backside of the bathtub.
    3. Take the overflow plate and place it over the overflow hole. Take the pin bolt and screw it inside to secure it. Take the round overflow cover and screw it onto the pin bolt.

DRAIN D1040C-XX

HOW TO INSTALL THE DRAIN:

  1. Unscrew the strainer from the drain tee that came in a separate box with your purchase.
  2. Take off the larger, lower rubber gasket. DO NOT TAKE OFF THE SMALLER, UPPER GASKET.
  3. Place the strainer through the hole in the interior of the bathtub.
  4. Take the lower gasket that was previously removed and re-attach it to the strainer from underneath the bathtub.
  5. Take the tee and unscrew the right-handed side cap to connect to the overflow. There will be one gasket that you will remove to use to attach to the overflow drain. Set it aside for now.
  6. Take the tee and attach it to the strainer from underneath the bathtub. Tighten as much as possible.
  7. Take the cap that you unscrewed and run it through the overflow hose.Streamline N 1560 59 FSWH FM Acrylic Freestanding Bathtub Series - fig 41
  8. Take the rubber gasket that you had previously set aside and run it through to the tip of the overflow hose on the overflow drain. The gasket should be placed on the immediate interior of the overflow hose to ensure that a watertight connection exists. Make sure that the gasket is put on inwards like so:Streamline N 1560 59 FSWH FM Acrylic Freestanding Bathtub Series - fig 42
    9. Attach the hose to the drain tee that was connected to the strainer in step 6. Tighten firmly. Check for any leakage prior to finalizing installation as there may be tightening that is required or the gasket was not attached correctly. This is a very critical step that cannot be skipped.Streamline N
1560 59 FSWH FM Acrylic Freestanding Bathtub Series - fig
43

DRAIN ND-025-XX:

HOW TO INSTALL THE DRAIN:
Please note that bathtub models that utilize this drain come WITHOUT an overflow. This is done so by design. NO overflow can be installed on bathtubs that utilize this drain model.

  1. Unscrew the strainer from the drain tee that came in a separate box with your purchase.
  2. Take off the larger, lower rubber gasket. DO NOT TAKE OFF THE SMALLER, UPPER GASKET
  3. Place the strainer through the hole in the interior of the bathtub.
  4. Take the lower gasket that was previously removed and re-attach it to the strainer from underneath the bathtub.
  5. Take the drain tee and attach it to the strainer from underneath the bathtub. Tighten as much as possible.

DRAIN N-PU1606-XX

HOW TO INSTALL THE DRAIN:

  1. Unscrew the strainer from the drain tee that came in a separate box with your purchase
  2. Take off the larger, lower rubber gasket. DO NOT TAKE OFF THE SMALLER, UPPER GASKET
  3. Place the strainer through the hole in the interior of the bathtub.
  4. Take the lower gasket that was previously removed and re-attach it to the strainer from underneath the bathtub.
  5. Take the drain tee and attach it to the strainer from underneath the bathtub. Tighten as much as possible.

BATHTUB INSTALLATION

  1. Ensure that the floor at the installation site has sufficient floor support and is level.Streamline N 1560 59 FSWH FM Acrylic Freestanding Bathtub Series - fig 54
  2. Waterproofing the floor is highly recommended.Streamline N 1560 59 FSWH FM Acrylic Freestanding Bathtub Series - fig 55
  3. Determine the location of the drainpipe on the floor by taking measurements of the drain and waste location underneath the unit. Clean the drain hole area in preparation for setting the drain. The area should be dry & free from any debris.Streamline N 1560 59 FSWH FM Acrylic Freestanding Bathtub Series - fig 56
  4. Remove the bathtub from its box. It is recommended that the bathtub is carried by a minimum of two people. Ensure to carry and set down the bathtub only in the upside-down position.
  5. Gently place the bathtub in the upside-down position on a tarp or cardboard sheet in order to avoid contact with any rough surfaceStreamline N 1560 59 FSWH FM Acrylic Freestanding Bathtub Series - fig 58
  6. Loosen the nuts & washers from the metal frame. Adjust the leveling feet to align with the bathtub’s bottom as well as the floor and then tighten the washer and nuts. When leveling the bathtub, please make sure that the bathtub is sitting on the floor on the base of the bathtub, and NOT on all 4 leveling feet. Each individual leveling foot is to be used on a case-by-case basis to help even out and level the bathtub should the floor be uneven. All 4 leveling feet may or may not be required to be used.Streamline N 1560 59 FSWH FM Acrylic Freestanding Bathtub Series - fig 59
  7. Ensure to mark all positions of leveling legs on the floor using a pencil. Move the bathtub into the desired location near the drainpipe.
  8. Before proceeding with installation, push the pop-up into a close position and fill the bathtub above the overflow [Note: some models may not have an overflow] to test for overflow and drain leakage.
  9. Proceed to place the provided flexible drain hose into the floor drain.
  10. Please note, that the flexible hose is a basic way that we provide to connect to the end plumbing in a home. The plumbing installation in every home differs, so please consult with a certified plumber to see if the plumbing in your home is compatible with using a basic flexible hose.
  11. Seal the connection by using a PVC pipe sealant to join the parts together.Streamline N 1560 59 FSWH FM Acrylic Freestanding Bathtub Series - fig 63
  12. Apply silicone along the bottom of the bathtub In order to create an airtight seal. Then apply a bead of tub & tile caulk around the edges of the base.Streamline N 1560 59 FSWH FM Acrylic Freestanding Bathtub Series - fig 64
  13. With the bathtub now in place, wipe off any excess silicone, tub & tile caulk where the bathtub meets the floor.Streamline N 1560 59 FSWH FM Acrylic Freestanding Bathtub Series - fig 65
  14. Allow for up to 24 hours for the adhesive material to set.
    Streamline N 1560 59 FSWH FM Acrylic Freestanding Bathtub Series - fig
66

streamlinebath.com
support@streamlinebath.com
****310-935-0028

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Streamline User Manuals

Related Manuals