VEICHI SI22 Solar Pump Inverter Instruction Manual
- June 5, 2024
- VEICHI
Table of Contents
SI22 Solar Pump Inverter Manual
F2.00: 1
F0.02: 1| | Terminal control
---|---|---
F2.29: 1| | Active relay
FE14: 20.00| | Min Frquency
FA.19=00| | Single-phase motor
Security Tips
- Only qualified personnel can operate the equipment.
- AC power supply should not be connected with output ports U, V, and W, otherwise, there is a danger of damage to the frequency inverter.
- After electrified, it is forbidden to contact the internal wiring board and its parts. Otherwise, it will cause the danger of electric shock
- The user can only operate on it after 5 minutes when cutting off power.
Technical Specification
Solar pump inverter power(KW)| Pump| Max solar power input (KW)| Max DC input
voltage V| Recommend Voc voltage (V)| Rated output current(A)| Output
frequency (Hz)
---|---|---|---|---|---|---
Rated power (KW)| Rated voltage( V)
SI22-D1 series, DC60-400VDC input, 3 phase 110-230VAC output, suitable for
110VAC pump
0.75| 0.75| 110| 1.0| 400| 175~380| 7A| 0-320
1.5| 1.5| 110| 1.95| 400| 175~380| 10A| 0-320
SI22-D3 series, D60V-400V input, 3 phase 220-240VAC output, suitable for
220VAC pump
0.75| 0.75| 220| 1.0| 400| 360~400| 4A| 0-320
1.5| 1.5| 220| 1.95| 400| 360~400| 7A| 0-320
2.2| 2.2| 220| 2.86| 400| 360~400| 10A| 0-320
Note: SI22 products can also drive single-phase pumps and please select the current-matched model.
Product Model
Appearance and Dimension
Solar Pump Controller Wiring
Standard Wiring for three-phase motor
**Connection for single-phase motor Note: The first connection solution
for better performance is recommended.**
Basic Operation
Indicator and Key****
Icon
| Name|
Function
---|---|---
| Power| ON: The power is 60-400VDC.
OFF: Power is abnormal.
| Status| OFF: It is ready to run; BLINKING: Fault or alarm comes;
ON: The four indicates will be on in turn and stand for output frequency is
approaching 30%, 50%, 70%, and 90% of rated frequency in sequence
| ****
Start/Stop
| OFF Status: Press it to run ON Status: Press it to stop
BLINKING Status: Press it to reset
Dial-up and External Port:
Icon
| Name|
Function
---|---|---
| Keyboard| Support optional keyboard
| IOT| Support optional IOT to access online monitoring, offline data storage,
and WIFI hotspot
| Quick Dial-up| Default D1 for AC110V pump and D3 for AC220VC pump can be
selected by quick dial-up (any D1/D3 switch will only take effect after power
on again)
Trial Run
- Please double-check the cable connector according to the user manual.
- Press the “Start/Stop” button to run it, and check whether the pump rotary direction is correct. If the direction is correct, please go to step(4); Otherwise, please go to step (3).
- Press the “Start/Stop” button to stop it and change any two cables to adjust the direction; Press the “Start/Stop” button and then it will run smoothly.
- The default setting for Start/Stop will store the operation command while power off. So it will automatically run or stop along with sunrise or sunset.
Quick Troubleshooting
- Power is still off when connecting power: please check whether the input voltage is 60-400VDC or check the cable connections of the solar array.
- Status indicator is blinking: please reset it by pressing “START/STOP” for 1 second. Otherwise, please ask for support.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>