Dettaglio 42U-100Ah-12V Battery Cabinet User Manual
- June 5, 2024
- Dettaglio
Table of Contents
Dettaglio 42U-100Ah-12V Battery Cabinet
Mechanical Data
- Dimension : 1100 mm(D)647 mm(W)2010 mm(H)
- Empty Cabinet Weight : 221 Kgs
Battery Cabinet & Battery Requirement
- Number of Lead-Acid Cells: 12V 100Ah x 32 Batteries
- Number of Lead-Acid Cells: 12V 100Ah x 36 Batteries
- Number of Lead-Acid Cells: 12V 100Ah x 40 Batteries
- Lead-Acid Battery maximum size(mm): L W H = 343 173 224
Pre-installation Description
-
Battery cabinet:
The marked “F” means front side of battery cabinet; the other marked “R” means rear side of battery cabinet. -
Battery tray:
The cabinet include 6 layers totally of battery trays from L1 (bottom) to L6 (up).
How to link battery cabinet with UPS
Connection cable specification
- For 250A circuit breaker in 1/0 AWG wire
- For 400A circuit breaker in 1/0 AWG double wire
Battery Cabinet Link with UPS
Internal wiring
FOR 12V 100Ah x 40 Batteries
FOR 12V 100Ah x 36 Batteries
FOR 12V 100Ah x 32 Batteries
Installing battery cabinet
-
Step1.
Pull out the latch from door hinge then remove the front door. -
Step 2.
Unscrew the M4 screws (12 pcs) by cross screwdriver and then remove the side panels. -
Step 3.
Unscrew the M6 screws (4 pcs) form each battery tray and remove all the battery trays from cabinet. -
Step 4.
Install the battery into the battery cabinet from L1 (bottom) and connect with battery. (See chapter 3.2.1 internal wiring “L1”)
FOR 12V 100Ah x 40 Batteries
FOR 12V 100Ah x 36 Batteries
FOR 12V 100Ah x 32 Batteries
-
Step 5.
Install the battery tray and using M6 screws to fix the battery tray. -
Step 6.
Install the battery into the battery cabinet and connect with battery. (See chapter 3.2.1 internal wiring “L2”)
FOR 12V 100Ah x 40 Batteries
FOR 12V 100Ah x 36 Batteries
FOR 12V 100Ah x 32 Batteries
-
Step 7.
Install the battery tray and using M6 screws to fix the battery tray. -
Step 8.
Install the battery into the battery cabinet and connect with battery. (See chapter 3.2.1 internal wiring “L3”)
FOR 12V 100Ah x 40 Batteries
FOR 12V 100Ah x 36 Batteries
FOR 12V 100Ah x 32 Batteries
-
Step 9.
Install the battery tray and using M6 screws to fix the battery tray. -
Step 10.
Install the battery into the battery cabinet and connect with battery. (See chapter 3.2.1 internal wiring “L4”)
FOR 12V 100Ah x 40 Batteries
FOR 12V 100Ah x 36 Batteries
FOR 12V 100Ah x 32 Batteries
-
Step 11.
Install the battery tray and using M6 screws to fix the battery tray. -
Step 12.
Install the battery into the battery cabinet and connect with battery. (See chapter 3.2.1 internal wiring “L5”)
FOR 12V 100Ah x 40 Batteries
FOR
12V 100Ah x 36 Batteries
FOR
12V 100Ah x 32 Batteries
-
Step 13.
Install the battery tray and using M6 screws to fix the battery tray. -
Step 14.
Unscrew the M4 screws (4 pcs) form cabinet top and remove the top cover. -
Step 15.
Install the battery into the battery cabinet and connect with battery. (See chapter 3.2.1 internal wiring “L6”)
FOR 12V 100Ah x 40 Batteries
FOR 12V 100Ah x 36 Batteries
FOR 12V 100Ah x 32 Batteries
-
Step 16.
Reinstall the top cover and using M4 screws to fix to the battery cabinet. -
Step 17.
Reinstall the side panels and using M4 screws to fix to the battery cabinet. -
Step 18.
Reinstall the front door and reinsert the latch to the door hinge.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>