STIEBEL ELTRON WPL A2W Premium Heat Pump Integral Installation Guide
- June 1, 2024
- STIEBEL ELTRON
Table of Contents
- STIEBEL ELTRON WPL A2W Premium Heat Pump Integral
- Product Usage Instructions
- Overview
- Installation
- Hydronic/DHW Connection
- System
- Commissioning
- Commissioning
- Operation
- Status & Troubleshooting
- Fahrenheit to Celsius Conversion
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
STIEBEL ELTRON WPL A2W Premium Heat Pump Integral
Specifications
- WPL Models : WPL 15 A2W Premium & WPL 25 A2W Premium
- HSBC Model : HSBC 300 Integral
- WPL Sizes : 2 ton (WPL 15) and 4 ton (WPL 25)
- Backup Element : 6.75 kW
- Buffer Tank Capacity : 26 gallon steel tank
- DHW Tank Capacity: 72 gallon glass-lined tank
Product Usage Instructions
-
Installation
-
Mounting/Placement
The WPL and HSBC units should be mounted in close proximity to each other to facilitate piping connections between them. Ensure that there is sufficient space around the units for maintenance and airflow. -
Hydronic/DHW Connection
Connect the water connections on the WPL unit to the corresponding connections on the HSBC unit. For DHW system, connect the cold water inlet to the HSBC and hot water outlet to the tapping points. -
Electrical
Follow the electrical wiring diagrams provided in the manual to connect the units to the power supply. Ensure all connections are secure and follow local electrical codes. -
Operation
-
WPM Controller
Use the WPM controller to set desired temperatures, modes (heating or cooling), and monitor system status. Refer to the controller manual for detailed instructions on programming and operation. -
Commissioning
-
Hydronic System
Ensure proper circulation of the water/glycol mixture through the system. Check for any leaks or air pockets in the piping and address them before commissioning the system. -
DHW System
Verify the connections to the DHW tank and ensure proper function of the DHW heating coil. Check for any leaks in the DHW system and make necessary adjustments. -
Status & Troubleshooting
Refer to the user manual for troubleshooting steps in case of any issues with the system operation. Contact customer support if problems persist. -
Fahrenheit to Celsius Conversion
To convert temperature readings between Fahrenheit and Celsius on the WPM controller, refer to the conversion chart provided in the manual.
FAQ
- Q: What should I do if I encounter a fault code on the WPM controller?
A: If you see a fault code on the controller, refer to the troubleshooting section of the manual to identify the issue. Follow the recommended steps to resolve the problem or contact customer support for assistance.
QUICK-START GUIDE
Air-to-water Heat Pump with Integral Tank
WPL 15/25 A2W Premium & HSBC 300 Integral
Overview
This document provides the necessary information for installing a Stiebel Eltron WPL A2W premium heat pump in conjunction with the HSBC 300 Integral. It includes the most critical details on the installation process. Some steps have been left out or only briefly explained to maintain the brevity of this document. For extended explanation on the components discussed in this document, consult the manual dedicated to the specific component.
-
WPL 15 A2W Premium & WPL 25 A2W Premium
- The WPL is an air to water monobloc heat pump. The refrigerant circuit is self-contained within the unit itself. There are two sizes available: WPL 15 A2W Premium & WPL 25 A2W Premium. These devices are in the 2 and 4 ton size classes, respectively.
- The WPL is capable of heating or cooling a water/glycol mixture flowing to the unit. There are two water connections on the unit that must be connected to the HSBC 300 Integral. A 6.75 kW back-up element is included inside the WPL to supplement the heating capacity.
-
HSBC 300 Integral
The HSBC 300 Integral integrates a system buffer, a DHW tank, circulation pumps, and system controller into one package. The buffer is a steel 26 gallon tank and the DHW tank is a 72 gallon glass-lined tank heated by an indirect coil. The HSBC contains the necessary pumps and diverter valves to use the WPL heat pump to heat or cool the buffer tank, and to heat the DHW tank, with the DHW tank having priority. -
FET
The FET is an optional room thermostat which includes functionality for temperature control from within the conditioned space. It also allows for adjustment of other basic system settings. -
AF PT Outdoor Sensor
The AF PT outdoor sensor is a PT1000 sensor in a housing designed for mounting on an exterior wall. This sensor is needed for ambi-ent temperature feedback to the system controller. -
System
The WPL and HSBC work together as an integrated package. It is a compact means of providing a building’s heating, cooling, and DHW demands from a single appliance. This requires piping between the two units, and to the buildings heating/cooling delivery system. For the DHW system, all that is needed is to run the cold water connection to the HSBC, and to run the hot water connection out to the tapping points. Some additional components such as expansion tanks and air vents are necessary just as in traditional systems.
Installation
-
Mounting/Placement
-
WPL 15/25 A2W Premium
Minimum clearances -
Maintain the minimum clearances to ensure trouble-free operation of the appliance and facilitate maintenance work.
-
T-support SK 1
The recommended method of mounting the WPL is on the SK 1 T-support kit. For
detailed installation instructions, consult the SK 1 installation manual.
Note
Install a ribbon heater when using the T-support.
Material losses
Install SK 1 in concrete piles at least 10˝ in diameter.
- A Depth of frost line
- B 12˝ (300 mm)
- 1 Foundation/concrete pile
- 2 T-support
- 3 Condensate drain with ribbon heater
HSBC 300 Integral
- Minimum clearances
The minimum side clearances can be swapped between left and right.
Hydronic/DHW Connection
-
WPL 15/25 A2W Premium
The WPL has a water inlet and a water outlet connection. These are 28 mm quick-connect fittings. Adapters are provided with the WPL to accommodate adapting to 1˝ copper pipe. -
1 Leaving water port (hot in heating mode)
-
Heating return (cold in heating mode)
-
Drain/fill port
-
Air purge vent
older 1˝ copper pipe to the provided adapter.
Run the inlet & outlet pipes into the building to the HSBC.
Insulate the pipe run with insulation at least 1˝ thick. -
HSBC 300 Integral
The HSBC 300 Integral includes the hydronic & DHW connections shown above.
The DHW cold and hot connnections have a 1˝ G thread and re-quires a union
sweat adapter (included) for 3/4˝ copper pipe. A connection accessory kit
(RBS-SBC Integral) is also available which repositions the DHW connection
point to the top of the HSBC. An expansion tank must be installed in the DHW
system and must be sized properly for a 72 gallon DHW tank.
System
- The most basic installation configuration for the HSBC includes two pipes run between the HSBC and WPL, two pipes running to a heating/cooling circuit, and two DHW connections for cold water in and hot water out.
- The pipe between the HSBC and WPL must be 1˝ pipe. Copper pipe or PEX with an oxygen barrier is also permissible. Venting devices must be installed to completely eliminate trapped air during com-missioning. The HSBC contains the circulating pump for this circuit, as well as a diverting valve to charge the included DHW tank.
- The heating circuit pipes connect to the heat emitter. The circulating pump is included inside the HSBC. The heating circuit should also have vents at the sites likely to trap air. An expansion tank is required and should accommodate the full volume of the system.
- Heat pump supply
- Heat pump return
- Heating supply
- Heating return
- Cold water in
- Hot water out
Electrical
WPL 15/25 A2W Premium
Note
Do not wire the sensor cable for the AF PT in parallel with or in the same
conduit as the power cables run to the WPL. If the AF PT cable is not run
separately, the system will not operate as intended.
- The 30 A / 240 V (X5) circuit for the electric backup is optional, and can be installed to enable the 6.75 kW element located inside the WPL.
- A shielded 4-wire 18 AWG cable is required for the data bus connection.
- Ground the LV lead (X2) by inverting the braided shield over the cable sheath and clamping it under the ground terminal.
- Then check that the strain relief fittings are working as intended.
- All 240 V circuits running outside require a disconnect switch be installed in an easily accessible location on the exterior wall near the heat pump.
HSBC 300 Integral
The HSBC requires connection to the same 15 A / 240 V circuit as the WPL. We
recommend to split the circuit at a junction box where the circuit can be
wired both outside and also to the HSBC.
Commissioning
Terminal | Control voltage | Wire size |
---|
AF PT Outdoor Sensor
Note
- Do not wire the sensor cable for the AF PT in parallel with or in the same conduit as the power cables run to the WPL. If the AF PT cable is not run separately, the system will not operate as intended.
- An outdoor sensor must be installed on a north or northeast fac-ing exterior wall. It must be placed at least 98” off of the ground and at least 39˝ away from windows and doors. It must also not be installed in direct sunlight, but it should be freely exposed to the elements.
FET Indoor Thermostat
This device requires a 4-wire AWG 18 connection with shielded wire, and
must be connected to terminal X1.2 on the HSBC.
Commissioning
Hydronic
Material losses
The hydronic system must contain at least 25% glycol. This is necessary to
provide adequate freeze protection and to inhibit corrosion on internal
components in the WPL and HSBC.
Note
Air must be completely eliminated from the system during the commissioning
process. The WPL will not operate in the expect manner if air is not
completely eliminated.
Using a purge & fill tee in conjunction with a charging pump is recommended to aid in filling and eliminating air during commissioning. A purge & fill tee allows for diversion into a fill reservoir and also to repeatedly build up and release pressure in the system to dislodge remaining trapped air.
- Fill the system slowly from the lowest point.
- Open air vents during filling to encourage the escape of air. The HSBC has a fill/drain port on the bottom of the buffer tank, and the WPL has a fill/drain port as well.
- With the charging pump running, use a valve to intermittent-ly stop flow and allow for pressure to build up. Release the pressure and look for air bubbles in the fill reservoir
- Operate the air vent in the WPL, as well as the vent on the DHW heat exchanger in the HSBC.
- Air vent valve
- Vent hose
- Hose attachment
It is critically important to purge as much air as possible from the hydronic system. The WPL will not operate as expected if the system is not sufficiently purged.
DHW
Fill the DHW system from the cold water inlet. Open all down-stream fixtures
to allow for the quick venting of air within the hot water piping.
Electrical
Material losses
- Do not power on the HSBC or the WPL until the system has been properly filled and purged of air.
- Once the system has been properly filled and purged of air, power on all circuits wired to the WPL and HSBC. The screen on the front of the HBSC should illuminate and show the Stiebel Eltron logo. Once fully booted, you will be prompted with a few setup prompts.
- WPM Controller
The controller mounted on the front of the HSBC is called the WPM. Detailed information on this controller can be found in the manuals specific to the WPM.
Initial setup
- Display
- “MENU” key
- Touch-Wheel
- “OK” key
On the first power-up, the WPM will prompt the user to select the preferred
menu language, time, & date.
Enter the setup information when prompted. When complete, the main screen of
the WPM will be shown.
Heating curve optimization
- Based on the design temperature and insulation value of the building, the user may want to change the parameter HEATING CURVE RISE.
- Using the following chart, calculate the heating curve value by finding matching the ambient design temperature on the x-axis and the heat emitter delivery temperature on the y-ax-is. Interpolate this point between the closest heating curve lines on the chart.
X Outside temperature, °F (°C)
Y Heating circuit 1, heat pump return temperature, °F (°C)
- Enter this number into the parameter HEATING CURVE RISE by navigating to Settings > Heating > Heating Circuit 1.
- If the user prefers a fixed delivery temperature in the buffer tank, this value can be selected in the menu at Settings > Heating > Heating Circuit 1. By setting a value in the parameter Fixed Value Operation, the heating curve will be disabled.
Dual mode operation
- With the parameter DUAL MODE TEMP HZG, you can specify the dual mode temperature of the heat pump. Below this set outside temperature, the emergency/booster heater may back up the heat pump if the heating output has not been reached. The electric emergency/booster heater assumes responsibility for heating demand jointly with the heat pump.
- Enter the temperature where the backup element should work in conjunction with the heat pump into the parameter DUAL MODE TEMP HZG by navigating to Settings > Heating > Electric Reheating.
Operation
WPM Controller
The WPM controller contains a few different operating modes. The modes are
fully explained in detail in the WPM controller manual. The mode most
typically used is Comfort Mode. This mode keeps the DHW tank and the heating
circuit at the Comfort temperature.
If you want to select another operating mode, use the Touch-Wheel. This takes you through the list of possible operating modes. The current choice (list entry) is shown in the shaded selection field. Setting the WPM to Programmed Operation will allow for scheduling between the Comfort and Eco temperature setpoints at different times and days of the week.
Status & Troubleshooting
If the WPM is in a major fault state, a notification will be displayed on the screen. A minor fault that does not affect normal operation may not be displayed. The fault state of the system can be checked by navigating to Diagnosis > Heat Pump Status.
- If more than one fault occurs, it is always the most recently occurring fault that is displayed.
- Additional operating parameters for the system and the heat pump can be found by navigating to Info > System and to Info > Heat Pump > Process Data, respectively.
- If you are not able to resolve a problem please contact us toll free at 800.582.8423. Stiebel Eltron is happy to provide technical assistance. In most instances, we can resolve the problem over the phone.
Fahrenheit to Celsius Conversion
- United States of America
- STIEBEL ELTRON, Inc.
- 17 West Street
- West Hatfield, MA 01088
- Tel. 413.247.3380
- Fax 413.247.3369 Toll-free 800.582.8423
- info@stiebel-eltron-usa.com
- www.stiebel-eltron-usa.com
Subject to errors and technical changes!
A 362308-46092-9928
References
- ELTRON • IT-oplossingen op maat. Gespecialiseerd in facturatiesoftware
- This domain has been registered for a customer by nicsell
- ELTRON.CO.UK
- ELTRON
- eltron.cz
- The domain name eltron.nl is available for rent
- eltron.ru
- Tankless Water Heater | Renewable Energy | Stiebel Eltron USA
- STIEBEL ELTRON | Technik zum Wohlfühlen
- Warmtepompen - warmwater - verwarming - ventilatie | STIEBEL ELTRON
- Home - Stiebel Eltron UK
- STIEBEL ELTRON | Pompy ciepła | Wentylacja | Ogrzewacze wody i pomieszczeń
- STIEBEL ELTRON | Tepelná čerpadla, rekuperace, ohřev vody
- STIEBEL ELTRON - Főoldal
- STIEBEL ELTRON
- STIEBEL ELTRON | Официальный сайт | Интернет-магазин
- STIEBEL ELTRON International
- STIEBEL ELTRON | Ohrev vody, vykurovanie, vetranie, chladenie
- stiebeleltronasia.com
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>