hager VE106U 6 Module Insulated IP55 Enclosure Instruction Manual

June 5, 2024
hager

hager VE106U 6 Module Insulated IP55 Enclosure

IMPORTANT INSTRUCTIONS

hager VE106U 6 Module Insulated IP55 Enclosure-6 hager VE106U 6 Module Insulated IP55 Enclosure-7

TOOLS

hager VE106U 6 Module Insulated IP55 Enclosure-3

hager VE106U 6 Module Insulated IP55 Enclosure-2

DIAGRAM

Mounting instructions

hager VE106U 6 Module Insulated IP55 Enclosure-8

hager VE106U 6 Module Insulated IP55 Enclosure-9 hager VE106U 6 Module Insulated IP55 Enclosure-10

hager VE106U 6 Module Insulated IP55 Enclosure-11

Attention!
It is critical that any enclosure is sized and selected to accomodate and dissipate heat rise generated from all installed devices.
The table (right) provides maximum permissible heat dissipation for each golf enclosure size. Please ensure that you calculate internal heat generated from your installation and select the correct enclosure accordingly.

hager VE106U 6 Module Insulated IP55 Enclosure-12

Reference

| Admissible thermal dissipation loss for surface mounted distribution boards at temperarture rise ∆T*
---|---
10K W| 15K W| 20K W| 25K W| 30K W
VE103..| 2,4| 4,0| 5,7| 7,5| 9,4
VE106..| 3,2| 5,3| 7,6| 10,1| 12,6
VE110..| 4,5| 7,4| 10,6| 10,0| 17,6
VE112..| 7,7| 12,8| 18,3| 24,2| 30,3
VE212..| 9,5| 15,7| 23,5| 29,7| 37,3
VE312..| 11,3| 18,8| 26,8| 35,4| 44,4
VE412..| 13,2| 21,8| 31,2| 41,2| 51,7
VE118..| 9,9| 16,4| 23,5| 31,0| 38,9
VE218..| 12,3| 20,4| 29,2| 38,6| 48,4
VE318..| 14,8| 24,6| 35,2| 46,4| 58,2

This the temperature difference between the upper limiting temperature of the installed equipment and the ambient air temperature of the distribution board.

The Assembly (DBO) designated markings must be completed as specified in IEC/EN 61439 – 3 clause 6.1.

T +34 93 842 47 30 F +34 93 842 24 64 info@hager.com hager.com – 02.2022

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals