SOFAR SOLAR CH1000 Mobile APP Device Include Inverter Installation Guide
- June 4, 2024
- SOFAR SOLAR
Table of Contents
SOFAR SOLAR CH1000 Mobile APP Device Include Inverter
Specifications
- Product Model : CH1000
- Product Appearance Size (LWH): 21813034 mm (including antenna)
- Antenna Options : CH1000A Wi-Fi/BT, CH1000B Wi-Fi/BT aSub-1G, CH1000C Wi-Fi/BT aSub-1G a4G
- Terminal Blocks: 4P, 6P, 8P
- Terminal Resistance: 120 ohm
- Mounting Options : Wall, Rail, Desktop
- Supported Meter Model: Chint meter (DTSU666)
Product Usage Instructions
Installation Environment
Ensure installation space meets requirements: 200mm wall mounting space, 50mm rail mounting space.
Device Installation
CH1000 can be installed via wall mounting, rail mounting, or desktop mounting. Choose as needed.
Wiring
- Attention: Disconnect all power supplies before wiring.
- RS485 Wiring: Connect inverter (A2aB2) and meter (A1aB1).
- Antenna and SIM Card Installation: Install antenna and insert SIM card (25mm x 15mm x 0.76mm).
- Ethernet Port WAN Port Connection: Follow CT connection direction.
- External Emergency Stop Button: Connect to Fixed DI1 interface.
- Power Supply Connection: Use a power supply adapter.
Connected Device
- DIN-Rail Power Supply Wiring: +V Red, -V Black. Power up after completing all wiring.
FAQ
- Q : What is the supported meter model for CH1000?
- A: The supported meter model is the Chint meter (DTSU666).
- Q: How should I connect the RS485 terminal resistance?
- A: Connect a 120 termination resistance between A and B of the inverter when using RS485 communication.
SAFETY INSTRUCTIONS
- Installation and maintenance should only be carried out by a qualified electrical engineer for this operation
- The installation of the SOFAR CH1000 must be in full compliance with national and local grid standards and regulations.
- Read and understand all instructions contained in this manual and familiarize yourself with the relevant safety symbols before starting to install and commission the equipment.
- When any maintenance or repair is required, please contact the nearest authorized service center. For information about the nearest authorized center, please contact your dealer, do not make repairs yourself, which may result in injury to persons or property.
- Before installing and servicing the equipment, disconnect all power sources to avoid serious injury from electric shock.
INSTALLATION
DANGER
- Do not install the CH1000 on flammable materials
- Do not install the CH1000 where flammable and explosive materials are stored
- Do not install the CH1000 where you may inadvertently come into contact with them.
PRODUCT APPEARANCE
CH1000 product appearance size (LWH): 21813034 (including antenna), unit: mm, as shown below.
PACKING LIST
INSTALLATION ENVIRONMENT
- This product has a protection level of IP20 and should be installed indoors.
- Installation should avoid sunshine and rain.
- Parameters and warning signs must be clearly visible after installation.
- Operating temperature range of -30°C~+65°C. The storage temperature range is -40°C~+80°C. The working environment humidity range is 5%~95%.
- Please pay attention to prevent moisture and corrosive substances.
DEVICE INSTALLATION
Installation Space
Installation Of CH1000
CH1000 can be installed in three ways: wall mounting, rail mounting and
desktop mounting, and the user can choose one of these ways according to
needs.
Wall mounting
- Drill holes (hole spacing of 120mm, the depth of the hole is slightly larger than the length of the plastic expansion pipe. (M5*30 self-tapping screws and plastic expansion tubes are supplied with the product).
- Slowly tap the plastic expansion tube into the drilled hole with a hammer.
- Fix the expansion screws and expose the wall surface about 6.4 mm. mount the CH1000 on the screws.
DIN-rail mounting
- Installing the DIN-rail buckle
- Fixing the CH1000
CH1000 WIRING
ATTENTION
Please disconnect all power supplies before wiring and pay attention to safety
during wiring.
S485 Wiring
- Connect the inverter as well as the meter.
Connect the inverter
Connect the meter
NOTICE
- Currently the meter model supported by CH1000 is Chint meter (DTSU666).|
- Connecting R5485 terminal resistance: Please connect a 12052 termination resistance between A and b of the inverter
- CT connection: The direction of CT connection is pointing from the inverter to the grid as shown below.
Antenna and SIM card Installation nance o 90
installation of SiM care
For SIM cards, please prepare your own large industrial-grade card that fits
the slot size (25mm x 15mm x 0.76mm) of this device Please power off the
device first and then insert the SIM card. Ethernet port
WAN pon connection
External emergency stop
button
Fixed DIl is the input interface for the emergency stop switch (External
passive emergency stop switch is required. Dil is connected to the “NC” port
of the emergency stop switch, and there is no polarity requirement for the two
connecting wires).
Connecting the power
supply
• Power supply adapter
DIN-Rail power supply
ATTENTION
Please cock to after sure the miring is correct before powering on the
computer.
The chassis is clean and free of debris
APP CONFIGURATION
SCANNING CH1000 AND CONFIGURING WIFI
Scan the barcode of the SN number of CH1000 using the SOFAR Cloud Monitor APP The SOFAR SN number is similar to SD00220004E238100079. Click ‘Replacement Network” to select a WiFi that can access the Internet, and enter the password. Then, “Configuration Successful’ will appear.
CONNECTED DEVICE
ADDING INVERTERS OR METERS DEVICE
ATTENTION
Please refer to the user manual for specific operating procedures.
CONTACT
- Shenzhen SOFARSOLAR Co.Ltd
- 11F.Gaoxinqi Technology Building Xin’an district 67,
- Xingdong Community.Xin’an Street,Bao’an District.Shenzhen
- Email: info@sofarsolar.com
- Web: www.sofarsolar.com
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>